Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-Finance 1 250 Y KODIKULAM KODIKULAM POST MADURAI 625 104 | MADURAI | MADURAI | TAMIL NADU | 625104 | L1 | Accepted-Finance L1 | |
| 2 | L2₹1.1 Cr+₹1.4 L (1.23%)Rejected-Finance 3139 TEACHERS COLONY LALGUDI TRICHY 621 601 | TRICHY | TRICHY | TAMIL NADU | 621601 | L2 | Rejected-Finance L2 | |
| 3 | L3₹1.2 Cr+₹8.0 L (7.08%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹1.2 Cr+₹8.4 L (7.40%)Rejected-Finance D NO 50 41 ALAGAR NAGAR 5TH STREET K PUDUR MADURAI 625007 | MADURAI | MADURAI | TAMIL NADU | 625007 | L4 | Rejected-Finance L4 | |
| 5 | L5₹1.3 Cr+₹16.1 L (14.1%)Rejected-Finance | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | creepers engineering contractors L3 | ALAGAPPA CONSTRUCTIONS L1 | V.Balasubramanian L6 | M.NATARAJAN L5 | K DHINAKARAN L7 | HRITHIC CONSTRUCTIONS L4 | BOSE & CO L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing juliflora jungle with uprooting including cost of clearing away the site with all labour, lead, lift , T&P etc complete. | 5,137 | sqm | 10 ₹51,370 | 1 ₹5,137 | 0.09 ₹462.33 Lowest | 3 ₹15,411 | 1 ₹5,137 | 1 ₹5,137 | 5 ₹25,685 |
| 2.00 | Conducting check survey,pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour, lead lift etc complete. | 7 | Loc | 1,000 ₹7,000 | 1,200 ₹8,400 | 1,299.99 ₹9,099.93 | 720 ₹5,040 Lowest | 4,000 ₹28,000 | 1,000 ₹7,000 | 1,000 ₹7,000 |
| 3.00 | Earthwork excavation in hard stiff clay, black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil inlcuding all cost of lead lift etc complete. | 452 | cum | 120 ₹54,240 | 100 ₹45,200 Lowest | 199.99 ₹90,395.48 | 108 ₹48,816 | 300 ₹1,35,600 | 100 ₹45,200 Lowest | 140 ₹63,280 |
| 4.00 | Earthwork excavation in soft disintegrated rock or kankar not requiring blasting. | 452 | cum | 180 ₹81,360 | 50 ₹22,600 Lowest | 249.99 ₹1,12,995.48 | 108 ₹48,816 | 300 ₹1,35,600 | 150 ₹67,800 | 200 ₹90,400 |
| 5.00 | Transport of stub and cleat,template including assembling of template setting of stub ,cleat and dismantling of template and shifting the template from loc to loc and reassembling including cost of template , all labour, T&P , lead, lift , fabrication charges etc complete. For KCR Tower | 5 | Loc | 8,000 ₹40,000 Lowest | 15,000 ₹75,000 | 24,999.99 ₹1,24,999.95 | 36,000 ₹1,80,000 | 53,000 ₹2,65,000 | 22,000 ₹1,10,000 | 25,000 ₹1,25,000 |
| 6.00 | Transport of stub and cleat,template including assembling of template setting of stub ,cleat and dismantling of template and shifting the template from loc to loc and reassembling including cost of template , all labour, T&P , lead, lift , fabrication charges etc complete. For HCR Tower | 2 | Loc | 8,000 ₹16,000 Lowest | 15,000 ₹30,000 | 19,999.99 ₹39,999.98 | 27,000 ₹54,000 | 42,000 ₹84,000 | 20,000 ₹40,000 | 20,000 ₹40,000 |
| 7.00 | PCC 1:2:4 using 20mm metal for foundation without formwork including cost of all materials lead lift etc complete. | 18 | cum | 5,500 ₹99,000 | 6,000 ₹1,08,000 | 5,499.99 ₹98,999.82 | 4,410 ₹79,380 Lowest | 9,000 ₹1,62,000 | 5,000 ₹90,000 | 5,900 ₹1,06,200 |
| 8.00 | PCC 1:2:4 using 20mm metal for foundation and chimney concrete with steel frustum box and chimney box including cost of all materials, lead, lift ,frustum box ,chimney box, etc complete . | 163 | cum | 5,800 ₹9,45,400 | 6,500 ₹10,59,500 | 7,499.99 ₹12,22,498.37 | 5,040 ₹8,21,520 Lowest | 10,000 ₹16,30,000 | 9,000 ₹14,67,000 | 5,900 ₹9,61,700 |
| 9.00 | Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. | 723 | Cum | 50 ₹36,150 | 10 ₹7,230 | 52.99 ₹38,311.77 | 36 ₹26,028 | 100 ₹72,300 | 1 ₹723 Lowest | 40 ₹28,920 |
| 10.00 | Supply & Providing pipe type earthing including all cost of materials, lead, lift etc complete. | 7 | loc | 2,000 ₹14,000 | 1,665 ₹11,655 | 1,399.99 ₹9,799.93 Lowest | 1,440 ₹10,080 | 4,000 ₹28,000 | 1,500 ₹10,500 | 1,500 ₹10,500 |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
23 Mar 2026, 12:00 pmClosed
CE/TP SO/Madurai
CE/TP SO/Madurai
EWE, SS, Concreting, Erection Kethaiyurambu 110/22 KV SS in Madurai Operation Circle
2026_EB_672996_1
CE/TP SO/MDU Specn.No.028/2025-26
Open Tender
Civil Works - Others
Works
180 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.2 L
2 Jul 2026
10 Mar 2026
24 Mar 2026
10 Mar 2026
23 Mar 2026
10 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing juliflora jungle with uprooting including cost of clearing away the site with all labour, lead, lift , T&P etc complete. | 5,137 | sqm | - | - |
| 2 | Conducting check survey,pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour, lead lift etc complete. | 7 | Loc | - | - |
| 3 | Earthwork excavation in hard stiff clay, black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil inlcuding all cost of lead lift etc complete. | 452 | cum | - | - |
| 4 | Earthwork excavation in soft disintegrated rock or kankar not requiring blasting. | 452 | cum | - | - |
| 5 | Transport of stub and cleat,template including assembling of template setting of stub ,cleat and dismantling of template and shifting the template from loc to loc and reassembling including cost of template , all labour, T&P , lead, lift , fabrication charges etc complete. For KCR Tower | 5 | Loc | - | - |
| 6 | Transport of stub and cleat,template including assembling of template setting of stub ,cleat and dismantling of template and shifting the template from loc to loc and reassembling including cost of template , all labour, T&P , lead, lift , fabrication charges etc complete. For HCR Tower | 2 | Loc | - | - |
| 7 | PCC 1:2:4 using 20mm metal for foundation without formwork including cost of all materials lead lift etc complete. | 18 | cum | - | - |
| 8 | PCC 1:2:4 using 20mm metal for foundation and chimney concrete with steel frustum box and chimney box including cost of all materials, lead, lift ,frustum box ,chimney box, etc complete . | 163 | cum | - | - |
| 9 | Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. | 723 | Cum | - | - |
| 10 | Supply & Providing pipe type earthing including all cost of materials, lead, lift etc complete. | 7 | loc | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
cancelled_1.pdf
pdf • 0.19 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_808816.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .