| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-Finance 1 250 Y KODIKULAM KODIKULAM POST MADURAI 625 104 | MADURAI | MADURAI | TAMIL NADU | 625104 | ₹1.1 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹1.1 CrRejected-Finance 3 39 TEACHERS COLONY LALGUDI TRICHY 621 601 | LALGUDI | TIRUCHIRAPPALLI | TAMIL NADU | 621601 | ₹1.1 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹1.2 CrRejected-Finance | ₹1.2 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹1.2 CrRejected-Finance D NO 50 41 ALAGAR NAGAR 5TH STREET K PUDUR MADURAI 625007 | MADURAI | MADURAI | TAMIL NADU | 625007 | ₹1.2 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹1.3 CrRejected-Finance | ₹1.3 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | creepers engineering contractors L3 | ALAGAPPA CONSTRUCTIONS L1 | V.Balasubramanian L6 | M.NATARAJAN L5 | K DHINAKARAN L7 | HRITHIC CONSTRUCTIONS L4 | BOSE & CO L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing juliflora jungle with uprooting including cost of clearing away the site with all labour, lead, lift , T&P etc complete. | 5,137 | sqm | 10 ₹51,370 | 1 ₹5,137 | 0.09 ₹462.33 | 3 ₹15,411 | 1 ₹5,137 | 1 ₹5,137 | 5 ₹25,685 |
| 2.00 | Conducting check survey,pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour, lead lift etc complete. | 7 | Loc | 1,000 ₹7,000 | 1,200 ₹8,400 | 1,299.99 ₹9,099.93 | 720 ₹5,040 | 4,000 ₹28,000 | 1,000 ₹7,000 | 1,000 ₹7,000 |
| 3.00 | Earthwork excavation in hard stiff clay, black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil inlcuding all cost of lead lift etc complete. | 452 | cum | 120 ₹54,240 | 100 ₹45,200 | 199.99 ₹90,395.48 | 108 ₹48,816 | 300 ₹1.4 L | 100 ₹45,200 | 140 ₹63,280 |
| 4.00 | Earthwork excavation in soft disintegrated rock or kankar not requiring blasting. | 452 | cum | 180 ₹81,360 | 50 ₹22,600 | 249.99 ₹1.1 L | 108 ₹48,816 | 300 ₹1.4 L | 150 ₹67,800 | 200 ₹90,400 |
| 5.00 | Transport of stub and cleat,template including assembling of template setting of stub ,cleat and dismantling of template and shifting the template from loc to loc and reassembling including cost of template , all labour, T&P , lead, lift , fabrication charges etc complete. For KCR Tower | 5 | Loc | 8,000 ₹40,000 | 15,000 ₹75,000 | 24,999.99 ₹1.2 L | 36,000 ₹1.8 L | 53,000 ₹2.6 L | 22,000 ₹1.1 L | 25,000 ₹1.3 L |
| 6.00 | Transport of stub and cleat,template including assembling of template setting of stub ,cleat and dismantling of template and shifting the template from loc to loc and reassembling including cost of template , all labour, T&P , lead, lift , fabrication charges etc complete. For HCR Tower | 2 | Loc | 8,000 ₹16,000 | 15,000 ₹30,000 | 19,999.99 ₹39,999.98 | 27,000 ₹54,000 | 42,000 ₹84,000 | 20,000 ₹40,000 | 20,000 ₹40,000 |
| 7.00 | PCC 1:2:4 using 20mm metal for foundation without formwork including cost of all materials lead lift etc complete. | 18 | cum | 5,500 ₹99,000 | 6,000 ₹1.1 L | 5,499.99 ₹98,999.82 | 4,410 ₹79,380 | 9,000 ₹1.6 L | 5,000 ₹90,000 | 5,900 ₹1.1 L |
| 8.00 | PCC 1:2:4 using 20mm metal for foundation and chimney concrete with steel frustum box and chimney box including cost of all materials, lead, lift ,frustum box ,chimney box, etc complete . | 163 | cum | 5,800 ₹9.5 L | 6,500 ₹10.6 L | 7,499.99 ₹12.2 L | 5,040 ₹8.2 L | 10,000 ₹16.3 L | 9,000 ₹14.7 L | 5,900 ₹9.6 L |
| 9.00 | Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. | 723 | Cum | 50 ₹36,150 | 10 ₹7,230 | 52.99 ₹38,311.77 | 36 ₹26,028 | 100 ₹72,300 | 1 ₹723 | 40 ₹28,920 |
| 10.00 | Supply & Providing pipe type earthing including all cost of materials, lead, lift etc complete. | 7 | loc | 2,000 ₹14,000 | 1,665 ₹11,655 | 1,399.99 ₹9,799.93 | 1,440 ₹10,080 | 4,000 ₹28,000 | 1,500 ₹10,500 | 1,500 ₹10,500 |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
23 Mar 2026, 12:00 pmClosed
CE/TP SO/Madurai
CE/TP SO/Madurai
EWE, SS, Concreting, Erection Kethaiyurambu 110/22 KV SS in Madurai Operation Circle
2026_EB_672996_1
CE/TP SO/MDU Specn.No.028/2025-26
Open Tender
Civil Works - Others
180 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.2 L
14 May 2026
10 Mar 2026
24 Mar 2026
10 Mar 2026
23 Mar 2026
10 Mar 2026
Clearing juliflora jungle with uprooting including cost of clearing away the site with all labour, lead, lift , T&P etc complete.
Conducting check survey,pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour, lead lift etc complete.
Earthwork excavation in hard stiff clay, black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil inlcuding all cost of lead lift etc complete.
Earthwork excavation in soft disintegrated rock or kankar not requiring blasting.
Transport of stub and cleat,template including assembling of template setting of stub ,cleat and dismantling of template and shifting the template from loc to loc and reassembling including cost of template , all labour, T&P , lead, lift , fabrication charges etc complete. For KCR Tower
Transport of stub and cleat,template including assembling of template setting of stub ,cleat and dismantling of template and shifting the template from loc to loc and reassembling including cost of template , all labour, T&P , lead, lift , fabrication charges etc complete. For HCR Tower
PCC 1:2:4 using 20mm metal for foundation without formwork including cost of all materials lead lift etc complete.
PCC 1:2:4 using 20mm metal for foundation and chimney concrete with steel frustum box and chimney box including cost of all materials, lead, lift ,frustum box ,chimney box, etc complete .
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete.
Supply & Providing pipe type earthing including all cost of materials, lead, lift etc complete.
Providing earthing arrangements for terminal tower including necessary excavation for fixing 3m long 50mm dia GI "B" class pipe,60cm dia with 5cm shell thick of RCC collar and refilling with excavated earth mixed with soft charcoal and connect the earthstrip with the leg of the stub including all cost of materials lead lift etc complete.
Removal of surplus earth in a low lying area to a average distance of 200m by head load.
Dewatering charges during excavation and concreting with 3/5 HP Diesal motor with Pump including hire charges, labour,fuel,oil,transport etc complete
Providing shoring and shuttering in foundation using wooden planks and scantling including all cost of materials, labour, lead, lift etc complete.
Labour charges for erection of GI tower angles ,square cross arm including cost of materials, T &P,labour, lead, lift etc complete.as per approved drawing and specification
Labour charges for Hoisting of 7 units of suspension 90 KN insulators with all allied hardwares , including all labour charcges lead and lift etc. complete.Without PA Rod for Panther
Labour charges for Hoisting of 8 units of single tension 120 KN insulators with all allied hardwares , including all labour charcges lead and lift etc. complete.
Transport of 6 Nos of Panther conductor ,paying out, jointing,rough sagging, tensioning, clipping, providing vibration dambers for tension locations including giving jumber connection for power conductor including transport charges, providing trussels wherever necessary loading unloading lead lift etc complete.Single Span without L.C
PCC 1:2:4 using 20mm metal for muffing coping concrete with form work including cost of all materials,labour, lead, lift,etc complete .
Plastering with CM 1:3,12 mm thick for muffing coping concrete including cost of all materials,labour,lead,lift etc complete.
Providing full welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials, hire charges for diesel generator and welding transformer, all labour, transport charges etc complete.
Painting with two coats of anticorrosive paint over tower leg at a height of 45cm including all cost of materials,labour, lead lift etc complete
supply and Labour charges for fixing of number plates, danger board,phase plate including all cost of materials,labour transport,lead, lift,etc complete
Supply,fabrication and fixing of name board with 18 gauge plate including cost of materials, labour for writing name of the line etc complete
Labour charges for removal of Large trees
Labour charges for removal of small trees
Providing temporary guys wherever necessary including excavation,buryingout ofanchor forstaywire,tightening,dismantling the same after completion of works including cost of allmaterials,lead,lift,labour etc complete.
Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour,lead ,lift etc complete
Providing trussels for major and minor road crossing including cost of all materials,labour, lead lift etc. Complete.
Land plan schedule for this transmission line towards compensation for the land in the route adopted including detailed survey of land in transmission line in coordination with revenue department preparation of land plan schedule with drawing in FMB sketch including cost of hire charges for all instrument ,labour etc ,as per the instruction of TANTRANSCO engineers incharge at site complete .
Supply of Stub, Cleat, Tower Parts, Bolts & Nuts as Per IS and technical specification including transport Charge etc complete.Fabrication, galvanising and supply of various type of normal, extension tower parts and tower body/leg extensions (complete excluding bolts, nuts and stubs) and including transport charges, hangers, D-shackles, and all taxes etc.Mild Steel
Supply of Hot dipped GI bolts & nuts including step bolts and electro-galvanised spring Washers as per relevant latest IS for towers, extensions, stubs including transport charges and all Taxes etc completeMild Steel
Design, Manufacture and supply of following line materials as per IS and technical specification including transport, all taxes etc complete. ACSR Panther Conductor
Design, Manufacture and supply of following line materials as per IS and technical specification including transport, all taxes etc complete. OPGW 24 fibre including erection
Design, Manufacture and supply of following line materials as per IS and technical specification including transport, all taxes etc complete. 90 KN ordinary disc insulators
Design, Manufacture and supply of following line materials as per IS and technical specification including transport, all taxes etc complete. 120 KN ordinary Disc insulators
Supply of Hardware fittings as per IS and technical specification including transport charge etc complete. Single Suspension fitting for panther
Supply of Hardware fittings as per IS and technical specification including transport charge etc complete. Single Tension fitting for Panther
Supply of Hardware fittings as per IS and technical specification including transport charge etc complete. SB damber for panther
Supply of Hardware fittings as per IS and technical specification including transport charge etc complete. MSJ for panther
Supply of Hardware fittings as per IS and technical specification including transport charge etc complete. Repair sleeve for panther
Supply of Hardware fittings as per IS and technical specification including transport charge etc complete. Aluminium earthbond
Supply of Hardware fittings as per IS and technical specification including transport charge etc complete. D" Shackle 16 mm dia
Supply of Hardware fittings as per IS and technical specification including transport charge etc complete. Number plate
Supply of Hardware fittings as per IS and technical specification including transport charge etc complete. Phase plate
Supply of Hardware fittings as per IS and technical specification including transport charge etc complete. Danger Board
Supply of Hardware fittings as per IS and technical specification including transport charge etc complete. "U" bolt 16 mm dia
SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_808816.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid