Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4 L
EMD Value
₹20,000
Closing Date
11 Feb 2026, 6:55 pmClosed
EXECUTIVE ENGINEER REW BUDGAM
RDD Complex Budgam
CONSTT. OF ROAD FROM MAIN ROAD (BUS STAND) UPTO H/O AB RASHID RATHER ORS AT BUNPORA
2026_RDPR_302255_34
NIT_114_REW BUDGAM OF 2025-26
Open Tender
Civil Works
Percentage
30 days
Surasyar
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer REW Budgam
₹20,000
12 Feb 2026
4 Feb 2026
12 Feb 2026
4 Feb 2026
11 Feb 2026
4 Feb 2026
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed. All kinds of soil.: 1m from cutting edge
Providing and laying of dry stone solling hand packed including spreading , levelling and all carriages.
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls
Centering and shuttering including strutting, propping etc. and removal of form work for : Abutments
Centering and shuttering including strutting, propping etc. and removal of form work for: Suspended floors
Centering and shuttering including strutting, propping etc. and removal of form work for: Edges of slabs
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering . All work upto plinth level with:1:4:8(1 cement : 4 coarse sand :8 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade with 20 % plum including curing but excluding the cost of centring and shuttering . All work upto plinth level with:1:3:6(1 cement : 3 coarse sand :6 graded stone aggregate 20 mm nominal size) 80 % Concrete
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding the cost of centering shuttering, finishing and reinforcement.
Reinforcement for RCC works including straightening, bending, cutting, placing in position and binding all complete (TMT Bars)
12mm thick cement plaster of mix 1:4 (1 cement: 4 coarse sand)
Carriage of materials : stone soling for an average lead of 15 km
Stone aggregate for an average lead of 15km
Sand for an average lead of 25 km
Add provision for Signboard/Photographs/ and other unforeseen items (surface dressing, pipes for weep holes, etc)
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
BOQ_980867.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .