| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹15.5 LAccepted-AOC 316 2 KAVIN HOUSE MOHOBEWALA SUBHASH NAGAR DEHRADUN UTTARAKHAND 248002 | DEHRADUN | UTTARAKHAND | 248002 | 1 | Accepted-AOC Work allotted | |
| 2 | 2₹16.1 L+₹60,512.02 (3.90%)Rejected-Finance HOUSE NO 254P SECTOR 6 ROHTAK OPPOSITE RAJIV GANDHI STADIUM VPO MAKRUALI KALAN 124001 | ROHTAK | ROHTAK | HARYANA | 124001 | 2 | Rejected-Finance Not lowest | |
| 3 | 3₹16.6 L+₹1.1 L (6.80%)Rejected-Finance NA | NA | NA | 121004 | 3 | Rejected-Finance Not lowest | |
| 4 | 4₹17.2 L+₹1.7 L (10.7%)Rejected-Finance 2 VPO GUGAHERI 124514 | GUGAHERI | ROHTAK | HARYANA | 124514 | 4 | Rejected-Finance Not lowest | |
| 5 | 5₹17.6 L+₹2.1 L (13.4%)Rejected-Finance 4 MARIA COLONY FATEHABAD 125050 | FATEHABAD | FATEHABAD | HARYANA | 125050 | 5 | Rejected-Finance Not lowest |
Tender Value
₹15.0 L
EMD Value
₹30,000
Closing Date
11 Jun 2020, 5:00 pmClosed
Executive Engineer Provn Divisn PWD BandR Jind
Executive Engineer Provn Divisn PWD BandR Jind
Special repair of Boundary wall of ITI Building at Julana in Jind distt
2020_HRY_129152_1
PWD/Jind/Boundary wall of ITI Building at Julana
Open Tender
Civil Works
Works
90 days
Jind
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
Executive Engineer Provn Divisn PWD BandR Jind
₹30,000
Yes
Executive Engineer Provn Divisn PWD BandR Jind
28 Jul 2020
21 May 2020
12 Jun 2020
21 May 2020
11 Jun 2020
21 May 2020
26 May 2020
Amount
Earth work in excavation in foundations, trenches etc. in all kinds of soil, not exceeding 2 meters depth including dressing of bottom and sides of trenches, stacking the excavated soil, clear from the edge of excavation and subsequent filling around masonry, in 15 cm layers with compaction, including disposal of all surplus soil, as directed within a lead of 30 Mtrs. (HSR 6.6)
Dismantling brick work, tile masonry or tile lining and tile terracing in cement (HSR 8.5-b)
Cement concrete 1:4:8 with stone aggregate 20 mm nominal size in foundation and plinth (HSR 10.38)
Cement concrete 1:11/2:3 with stone aggregate 20 mm nominal size for reinforced concrete work for walls exceeding 20 cm thickness (straight and curved) beams, girders, stairs, columns, (square or rectangular) battens and lintels etc. excluding steel reinforcement but including centering and shuttering, laid in position complete in all respects. (HSR 10.86 + 10.95 (a))
Cement concrete 1:11/2:3 with stone aggregate 20 mm nominal size for reinforced concrete work in footings, strips, foundations, beams, rafts, pedestals and approach slabs of bridges etc. excluding steel reinforcement and including centering and shuttering, laid in position, complete in all respects. (For works upto 1.5 meters below ground level (HSR 10.90 + 10.95 a)
First class brick work laid in cement sand mortar 1:4 in foundation and plinth (HSR 11.4)
First class brick work laid in cement sand mortar 1:4 in first storey upto 4 metres above plinth level (HSR 11.9)
Plastering on wall 12 mm thick cement plaster 1:6 (HSR 15.7)
Applying priming coat with cement primer in all shade on newly platered or concrete exterior surface. (HSR 16.25)
Finishing walls with exterior decorative cement based paints such as snowcem Robbiacem etc on new work, two coats to give an even shade (HSR 16.61)
Providing two coats of exterior acrylic emulsion paint. (Note:- First quality paint of reputed make firm such as Goodlass-Nerolac, Berger, Garware, Jenson, Nicholson, Asian & Shalimar Shall be used as approved by Engineer-in-charge in writing, Drum of paint shall be opened in presence of Engineer-in-charge). [HSR 16.79 (b)]. 1st Quality
Providing and applying two coats white cement based putty over plastered surface and grindling the surface smooth with sand paper to get an even and smooth finish including cost and carriage of all material, labour charges, scaffolding, sundries etc. complete. (Note:- reputed make Putty such as J.K./ Birla shall be used as approved by Engineer-in-charge). (HSR 16.81)
Fe-500 EQR TMT steel bars for RCC works, where not including in the complete rate of RCC including bending, binding and placing in position complete. (NS). Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work, excluding overlaps. From the length so measured, the weight of reinforcement shall be calculated in tones on the basis of IS:1732.Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods for binding and placing, shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement.
Providing and fixing concertina coil fencing with required dia 610 mm (having 50 nos. round per 6 metre length) up to 3m height of wall with existing angle iron 'Y' shaped 9 ith G.I. staples and G.I. clips to retain horizontal including necessary bolts or G.I. barbed wire tied to angle iron all complete as per direction of Engineer-in-charge with reinforced barbed tape (R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately) ( NS)
Earth work filling along boundary wall on pond side. (N.S.)
Recovery items: The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing brick work, bituminous layer and granular layers have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under :- Good Bricks @ Rs. 4.80/- Each
Brick Bats @ Rs. 400/- Cum Note: All quantities of the above materials have been worked out on the basis of theoretical quantities laid on this road. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual dismantling and if material after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser than reserve price.
Anil Kumar
SANJAY KUMAR CONTRACTOR
Sh Sunny Contractor
RAJESH KUMAR CONTRACTOR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .