| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-AOC | L1 | Accepted-AOC After Qualifing the technical bid, M/S SHYAM BIHARI TRIPATHI is found to be first lowest bidder in financial bid, Hence Agreement to be done iin the name of M/S SHYAM BIHARI TRIPATHI. | |
| 2 | L2₹8.0 L+₹2,133.75 (0.27%)Rejected-AOC | L2 | Rejected-AOC After Qualifing the technical bid, LALMANI MAURYA is found to be Second lowest bidder in financial bid, Hence disqualifing for the Agreement. |
Tender Value
Refer Docs
EMD Value
₹17,000
Closing Date
15 Mar 2021, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Office of the Executive Engineer Obra Dam Division Obra Sonebhadra 231219
Repairing of aquaduct slab, railing and relaying of pitching of Ghaghar aquaduct.
2021_UPIDC_561924_1
Tender Notice No. 02/E.E./2020-21
Open Tender
Civil Works
Item Wise
7 days
Churk, Sonebhadra
Please Refer Tender Notice and Document
2 documents required · 2 mandatory
₹860
₹17,000
17 Mar 2021
2 Mar 2021
15 Mar 2021
8 Mar 2021
15 Mar 2021
8 Mar 2021
90 days
Amount
Dismantling old and damaged stone boulder pitching including stacking of material in L/S slope U/S of Ghaghar aquaduct at km 2.000 of Sone pump canal. including all leads and lifts, all labour , material, T & P etc. required for proper completion of work.
E/W in filling gaps of damaged stone boulder pitching on Left bank of Iind stage P.H. and near escape including all cost of labour ,material,T&P etc. complete.
Relaying Dismentled old stone boulder pitching including cost of all materials, labour, T&P etc. required for proper completion of work .
Supplying and Laying stone boulder pitching including cost of all materials, labour, T&P etc. required for proper completion of work .beyond Dismentled of old masonary work qty.
R.R. stone masonry work in 1:4 with cement, coarse sand and stone boulder including cost of all material, labour, T&P etc. required for proper completion of work.
Cement Pointing in 1:2 cm on stone masonary with coase sand including cost of all material, labour, T&P etc. required for proper completion of work.
Centring & Shuttering for C.C./R.C.C. work in different parts of structure as below including cost of all materials, labour, T & P etc. required for proper completion of work.
Cutting, Bending, Binding and placing of reinforcement with cost of binding wire including cost of all materials, labour T&P etc. required for proper completion of work.
Laying wearing coat over old aquaduct slab in 1:1.5:3 with cement, coarse sand of F.M. not less than 2.00 and 4.75 to 20 mm size,crushed hard stone grit including cost of all material, labour, T & P etc. required for proper completion of work but excluding cost of reinforcement, centring and shuttering in construction of different parts of structure.
Providing and fixing 50mm dia G.I.pipe for making Railing including cost of all material, labour, T & P etc. required for proper completion of work.
Providing and fixing steel Beam ISMB-200 for Road Barrier at Ghaghar aquaduct km 2.000 of Sone Pump Canal including cutting, cartage with cost of all material, labour, T&P etc. and one coat of red oxide primer. required for proper completion of work.
Supplying, fabrication and fixing in position of Sign Board with made of angle Iron Section. including all cost of material, labourT&P required for proper complection of work.
Excavation of foundation in ordinary soil/sandy loam, clay or sand including lift upto 1.50 meter and lead upto 30 meter and including filling, watering, ramming of excavated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by engineer- in - charge upto a distance of 30 meter from the foundation trenches.
Laying M-15 cement concrete 1:2:4 with cement, coarse sand of F.M. not less than 2.00 and 4.75 to 20 mm size,crushed hard stone grit for grouting of ISMB girder/Angle. including cost of all material, labour, T & P etc. required for proper completion of work
Painting two coat on old steel railing and kerb of slab of superior quality synthetic enamel paint of approved make including cost of material, labour, T&P etc. required for proper completion of work.
Writing letters on sign board above 50 mm but below 80 mm letter size including all matterial,T&P etc.
Removing of refusal /garbage soil mixed with boulder/ wet slush in Aquaduct channel portion including cost of all material, labour, T&P etc. required for proper completion of work.
LALMANI MAURYA
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .