Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.9 L+₹988.33 (0.34%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹3.0 L+₹8,895.01 (3.09%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹3.2 L+₹28,661.69 (9.97%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹3.3 L+₹44,079.70 (15.3%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.0 L
EMD Value
₹7,900
Closing Date
13 Jul 2026, 6:00 pmClosed
EXEN REW SRINAGAR
OFFICE OF THE EXECUTIVE ENGINEER REW SRINAGAR
Development of Ziyarat Shareef by way of gate and pillars at Panzinara-B
2026_RDPR_314233_52
ENIT05/REW SGR 2026-27
Open Tender
Civil Works
Percentage
SRINAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Rural Development and Panchayati Raj
₹7,900
15 Jul 2026
3 Jul 2026
14 Jul 2026
3 Jul 2026
13 Jul 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.In cement mortar . | - | Cum | - | - |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 25 meter beyond 1 m from cutting edge.All kinds of soil.Gate Columns | - | Cum | - | - |
| 3 | Providing and laying of dry stone soling (hand packed) incl. carriage of same by MT 15 Kms.Gate colunms | - | Cum | - | - |
| 4 | P/Laying of Cast-in-Situ Cement ConcreteRCC of M15 Mix (1:2:4) using 20mm nom. size stone aggregate. | - | Cum | - | - |
| 5 | P/fixing of steel reinforcement inc cutting,bending and placing in position (complete job)Qty vide 5 @ 1.25Qtl/cum | 1 | Cum | - | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: a) Columns, pillars, piers, abutments, posts and struts. | - | Sqm | 1 | - |
| 7 | b) Arches, domes, vaults upto 6 m span | - | Sqm | 1 | - |
| 8 | Carriage of sand bajree by MT 15 Km avg lead. Qty. vide 3 | - | Cum | - | - |
| 9 | Providing and laying chisel dressed Devri Stone of size 300x200 mm face with 150 mm depth in cement mortar 1: 6 (1 cement : 6 coarse sand) up to plinth level including curing. One face dressed .Fine chisel dressed . | - | Sqm | 1 | - |
| 10 | P/fixing of steel in built up sections in angles and flats including one coat of red oxide and two coats of paint of approved brand and shade(complete job)Gate @ 3.5Kg/Sft | - | kg | 1 | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
BOQ_1018009.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .