Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.6 CrAccepted-Finance | ₹16.6 Cr | L1 | Accepted-Finance Responsive and set for evaluation |
| 2 | L2₹16.9 CrAccepted-Finance | ₹16.9 Cr | L2 | Accepted-Finance Responsive and set for evaluation |
Tender Value
₹16.6 Cr
EMD Value
₹16.6 L
Closing Date
3 Apr 2025, 4:00 pmClosed
EE, Bomdila Division, PWD, AP, Bomdila
O/o EE, Bomdila Division, PWD, AP, Bomdila
Construction of Road from Dibbin Mathow road to Sirilang CO HQ in Bichom District (CMCSRDP-II)
2025_PWDAP_2379_1
BDL/TA-28/NSD-15/2024-25/257 Dated 19/03/2025
Open Tender
Civil Works – Roads
Sirilang
Please refer Tender documents.
6 documents required · 6 mandatory
₹15,000
EE Bomdila Division, PWD, AP, Bomdila
₹16.6 L
O/o SE, Rupa Circle, PWD, AP, Rupa.
4 Apr 2025
20 Mar 2025
4 Apr 2025
20 Mar 2025
3 Apr 2025
20 Mar 2025
28 Mar 2025
Amount
(SH: Jungle Clearance)
Clearing and Grubbing Road Land . (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stackin of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.) (i) By Manual Means: B) In area of thorny jungle
(SH: Formation Cutting)
EARTH WORK ON HILL ROADS Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres)
Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift (Ordinary and Hard Soil/Hard Shale, Soil containing shingle or small size boulders.
Excavation in Hilly Area in Ordinary Rock by Mechanical Means not requiring Blasting. (Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres )
Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift. (Ordinary and Hard Rock
(SH: Granular Sub-Base, Gd.-I)
Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m.
Consolidation of sub-grade with road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the sub grade.
Granular Sub-Base with Coarse Graded Material (Table:- 400 - 2) Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 Grading-I
(SH: Granular Sub-Base, Gd.-II)
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401Grading-II
(SH: Wet Mix Macadam)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density
(SH: Dense Bituminous Macadam, Gd. - II)
Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.
Dense Graded Bituminous Macadam Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher withGrading-II (19 mm nominal size) sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.
(SH: Bituminous Concrete, Gd.- II)
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects
SH: RCC Box Culvert- Single Cell (2.00 m Span)
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work (with de-watering). i) Ordinary Soil A) Manual Means (i) upto 3m depth
ii) Ordinary Rock (not requiring blasting) A) Manual Means (i) Depth upto 3m depth
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M20
Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification A RCC Grade M20 Case I Using Concrete Mixer
Centring and shuttering including strutting, propping etc and removal of form work for :Walls (any thickness) including attached buttresses, pilasters etc.Plinth and string course etc.
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification . a) Granular material
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
(SH: RCC Drain: V-shaped)
Excavation for Structures. Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material (with de-watering) I Ordinary soil A Manual Means i) upto 3 m depth
PCC 1:3:6 in Foundation. Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
Centring and shuttering including strutting, propping etc and removal of form work for :Walls (any thickness) including attached buttresses, pilasters etc.Plinth and string course etc.
15 mm cement plaster 1 : 3 (1 cement : 3 fine sand) on the rough side of single or half brick wall. Neat cement punning.
Neat cement punning.
SH: PCC B/ Wall (3.00m Ht)
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material (without de-watering) I) Ordinary soil A) Manual Means II) upto 3 m depth
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications a) PCC Grade M20 height upto 5.00 m
Centring and shuttering including strutting proping etc. and removal of form work for: a) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A) Granular material
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
SH: PCC R/Wall (3.00m Ht)
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material (without de-watering) I) Ordinary soil A) Manual Means ii) upto 3 m depth
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications PCC Grade M20 height upto 5.00 m
Centring and shuttering including strutting proping etc. and removal of form work for: a) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification Granular material
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
M/s B.S.L Enterprises (BID ID -7162)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_2545.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid