Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.9 LAccepted-AOC | ₹29.9 L | L1 | Accepted-AOC Being L1 Work Awarded to M/s. S.M.ERECTORS |
| 2 | Rejected-Technical | - | - | Rejected-Technical Bidder has not filled and uploaded details in excel sheet. Hence, bid is not considered for evaluation as per NIT clause No. 15.10 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Bidder was asked to upload a certificate stating that the balance sheet for FY 2024 to 2025 has actually not been audited so far. However bidder did not respond for clarification asked on CPP Portal. |
Tender Value
₹34.8 L
EMD Value
₹69,637
Closing Date
1 May 2025, 5:00 pmClosed
PE (Conv. Piping), Kaiga-5 and 6
NPCIL, Kaiga 5 and 6, Kaiga-581400, Karnataka
Supply, Fabrication, Welding/Joining, Erection and Testing of HDPE Piping from KGS 3 and 4 to KAIGA 5 and 6 area.
2025_NPCIL_232410_1
CPPP/2025/084
Open Tender
Pipes and Pipe related activities
Item Rate
183 days
Kaiga Site
As per tender document.
5 documents required · 5 mandatory
₹0
₹69,637
Office of Head CTC, Kaiga Site
14 Jul 2025
10 Apr 2025
3 May 2025
10 Apr 2025
1 May 2025
22 Apr 2025
10 Apr 2025 - 16 Apr 2025
19 Apr 2025
Amount
Supply Items (Schedule-A)
100 NB EQUAL TEE SCH 40 ASTM A 234 Gr. WPB SML BW ANSI B 16.9
1OO NB SORF FLANGE 150 # ASTM A 105 ANSI B 16.5
100 NB BLIND FLANGE 150 # ASTM A 105 ANSI B .16.5
100 NB GATE VALVE MANUAL OP. FLANGE END 125/150 # SA 216 Gr. WCB ANSI B 16.34
100 NB BALL VALVE MANUAL OP. FLANGE END 125 /150# HDPE, SUIT TO 100 NB,SA 105, 150 # ANSI B 16..5 BACK RING FLANGE
FLANGE END MECHANICAL TYPE FLOW TOTALIZER 150# (RANGE 150000 TO 200000 CU. MTR.CAPACITY) TO SUIT TO 100 NB SA 105 FLANGE 150 #, ANSI B 16.5. FLOW METER TOTALISER SPECIFICATION
DN-110 HDPE PIPE IS 4984 Gr. PE 80 PN 6
DN-110 HDPE 90 DEGREE ELBOW, IS 4984 Gr. PE 80 PN 6 AS PER IS 8008
DN-110 PIPE /STUB END, 1S 4984 Gr PE 80 PN 6 AS PER IS 8008.
100 NB CS BACK RING FLANGE ASTM A 105 AS PER ANSI B 16.5 150#
DN-110 HDPE EQUAL TEE, IS 4984 Gr.PE 80 PN 6, AS PER IS 8008
DN-50 HDPE CAP, IS 4984 Gr. PE 80 PN 6, AS PER IS 8008.
HEXAGONAL HEADED BOLT, NUT WITH WASHER 85 MM LONG IS 1363 Gr. 6.3 /IS 3757 Gr. 8.8
ISMC 100 IS 2062 , E 250 Gr. A
12 MM THICK PLATE IS 2062 , E 250 Gr. BR
110 NB MS U CLAMP 25 MM WIDE x 3.5 MM THICK
100 NB M 12 U BOLT IS 2062 E 250 Gr. A
M 10 x 100 HST/FAZ
1.6 MM THK CAF GASKET 100 NB IS 2712 Gr. W/3
Erection item (Schedule-B)
Butt fusion Welding / joining and laying of DN- 110 HDPE Pipe, IS 4984, Grade PE 80, PN 6 both under ground and above ground.
Butt fusion Welding / joining and erection of DN-110 90 Degree Elbow, HDPE, IS 4984, Grade PE 80. PN 6 ( Inclusive of Welding/fusion of both end)
Butt fusion Welding / joining and erection of DN-110 HDPE Equal Tee, IS 4984, Grade PE 80. PN 6 ( Inclusive of Welding/fusion of three end)
Butt fusion Welding / joining and erection of DN-110 HDPE Pipe end /Stub end IS 4984, Grade PE 80. PN 6
Butt fusion Welding/joining and erection of DN-50 HDPE cap IS 4984 Grade PE-80 PN-6
Installation of 100 NB HDPE ball valve without welding.
Fabrication , Erection , welding, inspection,surface cleaning & supply and application of HB Chlorinated Rubber Zinc Phospate Primer paint in two coats to minimum 100 micron DFT and supply and application of HB Chlorinated Rubber finish paint in two coats to 60 micron DFT for CS structural steel Support and Components.
Installation of Anchores M10 x 100 mm HST/FAZ including handling,scafolding,labour & tools.
Removing & reinstallation of Precast Concrete Slab 0.3 m (L) x 1.350 m (W) x 0.1 m (T)
Excavation and backfilling of excavated trenches with the soil after completion of installation of pipe lines and testing including levelling/grading, compaction to the required level 1.5 M (D)x 0.8 M (W)
Sand bedding 50 mm depth x 400 mm width for underground HDPE piping including supply of Sand.
Dismantling of existing DN-50 HDPE piping including breaking of existing cement concrete ( 0.7 cub.mtr) & PCC to be done after breaking and removing of existing cement concrete, including tools, labour & disposing of unservicable material as directed by EIC
Carefully removing the Korean grass along with soil of 100 mm to 250 mm depth and 1500 mm width including replacing the same removed Korean grass along with soil after laying HDPE line along with tools & tackles,watering of grass,dressing of area etc.in all complete as per direction of EIC
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .