| 1 | L-1₹15.4 LAccepted-AOC | L-1 | Accepted-AOC L-1 bidder | |
| 2 | L-2₹17.1 L+₹1.3 L (8.24%)Rejected-Finance | L-2 | Rejected-Finance L-2 bidder | |
| 3 | L-3₹17.5 L+₹1.7 L (10.5%)Rejected-Finance 2 III 7 OBRA COLONY OBRA OBRA SONBHADRA UTTAR PRADESH 231219 INDIA | SONBHADRA | UTTAR PRADESH | 231219 | L-3 | Rejected-Finance L-3 bidder | |
| 4 | L-4₹28.2 L+₹12.4 L (78.7%)Rejected-Finance C 234 STREET NO 9 BHAJAN PURA DELHI DELHI 110053 | NORTH EAST DELHI | DELHI | 110053 | L-4 | Rejected-Finance L-4 Bidder | |
| 5 | Rejected-Technical | - | Rejected-Technical As per PQC |
Tender Value
Refer Docs
EMD Value
₹33,000
Closing Date
9 Aug 2021, 6:00 pmClosed
SE, OandMC-II, 2x200MW, BTPS,OBRA
Office of Superintending Engineer, OandMC-II, 2x200MW, BTPS,OBRA
Work services for Operation and Maintenance of Central Air Conditioning Plant for UCBs and MCB and other related works of 5x200MW, BTPS, OBRA.
2021_RVUNL_602641_1
05/SE-II/2x200MW/TMD/2021-22
Open Tender
Miscellaneous Works
Fixed-rate
365 days
BTPS
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
Dy.CAO, CFAandBO, BTPS, Obra-Sonebhadra(UP)
₹33,000
12 Oct 2021
10 Jul 2021
13 Aug 2021
10 Jul 2021
9 Aug 2021
10 Jul 2021
10 Jul 2021 - 9 Aug 2021
Amount
Round the clock operation and comprehensive maintenance of CAC plant for UCBs & MCB of 5x200 MW, BTPS, Obra as per scope of work {(01 Job=01 day)(03 Shift per day each shift=08 hour)}.
Overhauling of 120 TR compressor including descaling of condensor tubes , oil cooling tubes.
Overhauling of Chiller Pump .
Overhauling of Condensor Pump .
O/H of Cooling tower and nozzles at 14 meter level.
O/H. of Expansion tank and water line at 14 meter level.
Overhauling of air handiling unit.
Complete checking of cooling duct.
Complete Re-visioning of all valves and strainers.
Fabrication and replacement of bend of cooling tower line and chilled water line of Dia 50 to 100 mm.
Fabrication and replacement of bend of cooling tower line and chilled water line of Dia 101 to 200 mm.
Fabrication and replacement of bend of cooling tower line and chilled water line of Dia 201 to 250 mm.
Replacement of all damaged louvers of cooling towers of A.C. Plant by fabrication of new louvers out of G.C. sheet and fixing of the same in the frame of cooling tower (size 1200x300x0.5/0.8mm)
M/s Manual Engineering Services
MASSIVE CONSTRUCTION CO
VSAVE ELECTRONICS PRIVATE LIMITED
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .