| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹61.3 LAdmitted-Finance | -20.00% | ₹61.3 L | L1 | Admitted-Finance |
| 2 | L1₹61.3 LAdmitted-Finance | -20.00% | ₹61.3 L | L1 | Admitted-Finance |
| 3 | L1₹61.3 LAdmitted-Finance PLOT NO 13 SAPANA ORCHARD BETHORA ROAD CURTI PONDA GOA 403401 | SOUTH GOA | GOA | 403401 | -20.00% | ₹61.3 L | L1 | Admitted-Finance |
Tender Value
₹76.6 L
EMD Value
₹1.5 L
Closing Date
22 May 2026, 4:00 pmClosed
Executive Engineer, SCD
SOIL CONSERVATION DIVISION DIRECTORATE OF AGRICULTURE KRISHI BHAVAN TONCA-CARANZALEM-GOA
CONSTRUCTION OF COMPOUND WALL FROM MAIN ENTRANCE GATE TO REAR SIDE GATE ( CH.0.00 M TO CH.600M) FOR AGRICULTURAL FARM AT CODAR, PONDA-GOA
2026_DAG_29218_1
SCD/D.A./26-27/L2/e53/148
Open Tender
Civil Works
Percentage
350 days
CODAR -PONDA GOA
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.5 L
18 Aug 2026
13 May 2026
25 May 2026
14 May 2026
22 May 2026
14 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in all type of strata comprising any of the materials such as soil, sand, clay, gravel, moorum of all varieties, shingles, pebbles, all type of conglamerates, laterite rock, soft rock, ordinary rock, disintegrated rock, fissures/shattered, decomposed rock, and all such other materials either in full or in parts as the case may be adopting any approved method or methods as may be convient or permitted, inclusive of chiselling, wedging etc. but blasting prohibited in all conditions such as dry, moist, saturated, submerged, foul conditions etc. includin pumping or bailing out water, including setting out construction of shoring and strutting, removal of stumps and other deleterious matter, dressing of sides of bottom, providing barricading, danger lighting, guarding etc. disposal of excavated stuff in specified areas with all leads and lifts etc. and as directed by Engineer-in-charge etc. all complete. | 714 | cum | 554 | ₹3,95,556 |
| 2 | Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge. | 92.4 | cum | 245 | ₹22,638 |
| 3 | Rubble packing with available hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 153 | cum | 409 | ₹62,577 |
| 4 | Providing Laterite masonary in neatly dressed stones of size as specified in cement mortar 1:5 (1 cement : 5 Coarse sand ) and as directed by Engineer-in-charge etc. all complete. in foundation, basement and super structure upto floor I level complete and as directed by the engineer-in-charge. | 760 | cum | 5,440 | ₹41,34,400 |
| 5 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) including fixing broken glass bottle pieces excluding cost of centering,shuttering and layer of cement slurry complete in all works on masonary top surface as directed by engineer-in-charge. | 33 | cum | 7,204 | ₹2,37,732 |
| 6 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in::all works upto plinth level | 51 | cum | 6,810 | ₹3,47,310 |
| 7 | Centering and shuttering including struttings, propping etc. and removal of formwork for :Foundations, footings, bases for columns and mass concrete. | 250 | sqm | 407 | ₹1,01,750 |
| 8 | Applying cement slurry on RCC slab on cement concrete work using 2.75kgs of cement per sq.m for receiving cement concrete floor including roughening, cleaning, etc complete | 316 | sqm | 33 | ₹10,428 |
| 9 | 20mm cement plaster 1: 4 (1 cement : 4 fine sand) | 3,638 | sqm | 331 | ₹12,04,178 |
| 10 | 12mm cement plaster 1:4 (1 cement : 4 fine sand) | 148 | sqm | 223 | ₹33,004 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_29653.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .