| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 CrAccepted-AOC | ₹1.2 Cr | 1 | Accepted-AOC the bidder quoted rate less than put to tender value |
| 2 | 2₹1.6 Cr+₹42.9 L (36.9%)Rejected-AOC | ₹1.6 Cr+₹42.9 L (36.9%) | 2 | Rejected-AOC the bidder quoted rate higher than put to tender value |
Tender Value
₹1.2 Cr
EMD Value
₹69,000
Closing Date
27 Sept 2023, 3:00 pmClosed
Executive Officer
Arulmigu Ekambaranathar temple , kanchipuram
conservation works in pournami Mandapam at Arulmigu Ekambaranatahr temple ,Kanchipuram
2023_HRCE_364225_1
8687/2023/G1
Open Tender
Civil Works - Others
Lump-sum
270 days
Arulmigu Ekambaranathar temple kanchipuram
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹69,000
Yes
18 Dec 2023
28 Aug 2023
27 Sept 2023
28 Aug 2023
27 Sept 2023
28 Aug 2023
Amount
Removing stone elements like stone flooring, stone walls, stone columns and stone kodungai and stacking it for refixing including cost and conveyance labour, handling and etc., all complete. a)Columns
Removing stone elements like stone flooring, stone walls, stone columns and stone kodungai and stacking it for refixing including cost and conveyance labour, handling and etc., all complete.b)Stone flooring
Removing stone elements like stone flooring, stone walls, stone columns and stone kodungai and stacking it for refixing including cost and conveyance labour, handling and etc., all complete.c)Stone wall
Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls. Brick masnory in lime mortar.
Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification.
Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement Concrete 1:5:10 (One part of Cement, Five part of crushed stone sand and Ten part of hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification .
Plain lime Concrete 1:2:5 (One part of lime, two part of crushed stone sand and five part of hard broken stone jelly) using 40mm jelly for flooring including laying,consolidating,finishing,rendering the top surface rough to receive the floor,curing,etc., complete complying with standard specification.(the rate is inclusive of necessary planking for panelling whereever necessary and as directed by the departmental officers)
Refixing the removed stone elements like stone flooring, stone walls, stone columns and stone capitals including labour charges for fixing, handling, pointing with lime mortar 1:1.5 (one part of lime and one and half part of sand) complete complying with standard specification. a)Stone walls
Refixing the removed stone elements like stone flooring, stone walls, stone columns and stone capitals including labour charges for fixing, handling, pointing with lime mortar 1:1.5 (one part of lime and one and half part of sand) complete complying with standard specification. b)Stone column
Refixing the removed stone elements like stone flooring, stone walls, stone columns and stone capitals including labour charges for fixing, handling, pointing with lime mortar 1:1.5 (one part of lime and one and half part of sand) complete complying with standard specification. c)Stone roof beam
Flooring with cut stone slab (Available at site and excluding cost of cut stone slab),paving in existing sand bed and pointing with lime mortar 1:1.5(one lime ,one and half sand )including labour charges for single line dressing etc. complete complying with standard specification and as directed by the departmental officers
Supplying new stones such as stone beam, stone slab, stone kodungai and stone parapet wall includiing cost and conveyence etc., all complete complying with standard specification a)Uthiram, Pillar, Pavukkal(upto 10 feet length)
Supplying new stones such as stone beam, stone slab, stone kodungai and stone parapet wall includiing cost and conveyence etc., all complete complying with standard specification b)Walls
labour charges for cut stone Dressing and Fixing the following stone elements including all hire charges for all tools and clearing the site after completion of works including pointing with lime mortar 1:1.5 (one part of lime and one and half part of sand) etc. complete complying with standard specification. a)Uthiram
labour charges for cut stone Dressing and Fixing the following stone elements including all hire charges for all tools and clearing the site after completion of works including pointing with lime mortar 1:1.5 (one part of lime and one and half part of sand) etc. complete complying with standard specification. b) Pavukkal
labour charges for cut stone Dressing and Fixing the following stone elements including all hire charges for all tools and clearing the site after completion of works including pointing with lime mortar 1:1.5 (one part of lime and one and half part of sand) etc. complete complying with standard specification. c)Kodungai
labour charges for cut stone Dressing and Fixing the following stone elements including all hire charges for all tools and clearing the site after completion of works including pointing with lime mortar 1:1.5 (one part of lime and one and half part of sand) etc. complete complying with standard specification. d)Parapet wall
labour charges for cut stone Dressing and Fixing the following stone elements including all hire charges for all tools and clearing the site after completion of works including pointing with lime mortar 1:1.5 (one part of lime and one and half part of sand) etc. complete complying with standard specification. e)Spout
Scaffolding charges for Vimanans and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with Non Flamable Shaded coverings, providing ladder arrangements, country wood plank for working, inspection etc, complete hire charges only for erection, maintenance and removing the same on completion of the work. Upto 15' height
Brick work in lime mortar 1:2 (One part of lime and Two part of sand) using Special Bricks of size 8 3/4” x 4 1/4” x 2 3/4” for foundation and basement including curing,etc.complete complying with standard specification. Foundation and basement
Brick work in lime mortar 1:2 (One part of lime and Two part of sand) using Special Bricks of size 8 3/4” x 4 1/4” x 2 3/4” for foundation and basement including curing,etc.complete complying with standard specification. Ground floor superstucture
Providing Vargapoochu over the corewalls of Kalakaram, with Lime mortar 1:1.5(One part of lime and One and half part of sand) complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Lime mortar 1:1.5(One part of lime and One and half part sand) and finishing with final ornamental plastering and nayam theervai including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete all extra for folding ,superficial area.
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
Providing flat bricks on the terrace top using two layer of specially manufactured superior quality chamber moulded terrace brick of size 150x75x25mm for heritage works laid with lime mortar 1:1.5(One part of lime and One and half part of sand) and the joints of bricks raked up to receive lime mortar plastering to be done over the roof surface. The flat bricks should be laid in such a manner with proper slope and gradient that the rain water gets discharged easily through rain water outlet pipes freely. The quality of lime shall be of best and high calcium oxide content quality. This flat bricks shallbe subjected to curing for a period of 7 to 10 days and after which loose lime particles will be removed and the joints raked up to take up lime mortar plastering (two layers)
Pointing the top of roof terrace tiles surface pointing with lime mortar 1:1.5 (One part of lime, One and a half sand)including finishing the surface neatly. The rate is inclusive cost of all material, labour charges, raked up the joints and finishing neatly ets., complete complying with standard specifications and as directed by departmental officers.
Plastering with Lime mortar 1:1.5(One part of lime, One and half part of sand),12mm thick in all floors including curing etc.complete complying with standard specification and as directed by the departmental officers.
Painting two coats of newly plastered wall surface with ready mixed emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Flooring with cut stone slab of size 600mm x 600mm not less than 10cm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and labour charges for paving and Pointing with lime mortar 1:1.5 (One part of lime, One and half part of sand) complete complying with standard specification.
Sub Total
Namshivaya sirpa kalaikudam
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_434217.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .