Loading…
Loading…
Tender Value
₹3966.2 Cr
EMD Value
₹79.3 Cr
Closing Date
30 Oct 2026, 3:00 pm
Yes (up to 4 members)
Yes (up to 4 members)
Two Packet System
EPC [ Single Stage ]
Yes
23/09/2026 11:00
Lowest to Highest
180 days
Expenditure
Capital (Works)
CAO/CON
Construction of New BG Double Line from Balodabazar (Km 110.500) to Parmalkasa (Km 280.840) and Y-connectivities from Lakholi station and Marauda Y Cabin including earthwork, Bridges, Rail over Rail (ROR) Bridge , Road over Bridge (ROB), Road under Bridge (RUB), station buildings, track works, Electrification, Signaling &Telecommunication works, and allied miscellaneous works in connection with Kharsia- Naya Raipur-Parmalkasa 5th & 6th Line Project under South East Central Railway in the State of Chhattisgarh.
CAO-C-BSP-26-27-13
CAO-C-BSP-26-27-13
Open
Works - General
1275 Days
Bilaspur, Chhattisgarh
₹0
₹79.3 Cr
30 Jul 2026
30 Jul 2026
16 Oct 2026
23 Sept 2026
69 items across 6 schedules · ₹8,26,34,93,273.91 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying a layer of three dimensional cellular confinement GEOCELL made of ultrasonically-welded HDPE strips, which acts as a subgrade/subbase improving reinforcement mat weld (distance of each cell = 356mm depth of cell = 150mm) between formation and track structure in bridge approaches as per specifications & conditions attached as per IS-17483. The rate is inclusive of all labour, materials, leads, lifts, crossing of tracks, transport including all labour, fuel, tools and plants etc., complete. No payment for wastages will be made. | Sqm | 1500.00 | 550 | 8,25,000 |
| 2 | Conducting Cross Hole Ultrasonic Monitoring (CHUM)/ Cross Hole Sonic Logging (CSL) test of piles with contractor's man and machine. The rate includes cost of inspection of site and other unforeseen cost required for test, submission of reports in triplicate as per the satisfaction of the Engineer in charge at site. Payment of required M.S. steel reinforcement for fixing in position of M.S. pipe, M.S. plate etc. will be paid separately under relevant NS/USSOR items. | Each | 226.00 | 18,379.89 | 41,53,855.14 |
| 3 | Providing and fixing 50mm dia medium class M.S. pipe for CHUM test of pile including threading, water proofing, jointing, lowering, placing and fixing in position, welding of M.S. plates at ends as a complete job. Payment pf plates/steel reinforcement for ring to hold M.S. pipe will be made under relevant USSOR item. | Metre | 13663.00 | 1,029.19 | 1,40,61,822.97 |
| Schedule total | ₹1,90,40,678.11 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
OperationalizationofEngagementofThird-PartyInspectionTPIAgencies.pdf
ATTACHMENT
2023_07_31AddendumandCorrigendumSlipNo_1ACS-1toIRUSSOR-2021.pdf
ATTACHMENT
2025-08-19-RDSO_T_9792_ALT_2.pdf
ATTACHMENT
2025-08-19-RDSO_T_9843_ALT_2.pdf
ATTACHMENT
2025-08-22-StatusofIRconcretesleeperPlantsupdatedason30072511.pdf
ATTACHMENT
Approachroaddrawing.pdf
ATTACHMENT
Drain.pdf
ATTACHMENT
DrawingofCableDuctAnnexure-A_compressed.pdf
ATTACHMENT
e-BGPolicyinEPCGCCPMSPSSAGCPGMSDated16.06.2026.pdf
ATTACHMENT
GluedJointManualcorrectionslip.pdf
ATTACHMENT
heightgaugeTI-DRG-CIV-HGAUGE-RDSO-00002-05-01.pdf
ATTACHMENT
IRWMACS12.pdf
ATTACHMENT
LowCostPPShelterNew.pdf
ATTACHMENT
OHEdepot-psiohe.JPG.pdf
ATTACHMENT
PFwall.pdf
ATTACHMENT
PolicyOFCLayingdated2.1.2026Annexure-B.pdf
ATTACHMENT
PPShelterNew.pdf
ATTACHMENT
RBletterforpassengeramenities_1.pdf
ATTACHMENT
RCCoverheadtankreferencedrawing1_compressed_1.pdf
ATTACHMENT
GEN-EPC-ELIGIBILITY.pdf
ATTACHMENT
GEN-EPC-POLICY1.pdf
ATTACHMENT
GEN-EPC-POLICY.pdf
ATTACHMENT
GEN-GRSR2024SECR_compressed-1-250.pdf
ATTACHMENT
TrackMachineRestRoom.pdf
ATTACHMENT
GEN-RULESFOROPENING.pdf
ATTACHMENT
ST-TIMEDELAYHR.pdf
ATTACHMENT
ST-TAN3012VER518.6.2026_compressed.pdf
ATTACHMENT
ST-STATIONBUIDLINGGAD.pdf
ATTACHMENT
2026-03-23-FRSforCantedTurnoutforuseonNLGCandMultiTrackingProjects1.pdf
ATTACHMENT
ST-SSCRECOM.pdf
ATTACHMENT
ST-SOR2021.pdf
ATTACHMENT
ST-SIMILARNATUREOFWORKS.pdf
ATTACHMENT
ST-SIGDATE-POL.pdf
ATTACHMENT
ST-Cablecutpenaltiespolicy.pdf
ATTACHMENT
ST-DRAWINGS-1.pdf
ATTACHMENT
ST-EI-RSDO-SPEC.pdf
ATTACHMENT
ST-GR-3.47POL.pdf
ATTACHMENT
ST-IRSEM.pdf
ATTACHMENT
ST-IRSEM-APPENDIXII.pdf
ATTACHMENT
ST-MiscPOLpart-4.pdf
ATTACHMENT
ST-MiscPOLpart-5.pdf
ATTACHMENT
ST-MiscPOLpart-6.pdf
ATTACHMENT
MajorBridgeNO231-Model.pdf
ATTACHMENT
MajorBridgeNO231-Model-2.pdf
ATTACHMENT
MajorBridgeNo257-Model.pdf
ATTACHMENT
MajorBridgeNo258-Model.pdf
ATTACHMENT
MajorBridgeNo266-Model.pdf
ATTACHMENT
MajorBridgeNO269-Model.pdf
ATTACHMENT
MajorBridgeNO290-Model.pdf
ATTACHMENT
MajorBridgeNO296-Model.pdf
ATTACHMENT
MajorBridgeNo401Model.pdf
ATTACHMENT
MajorBridgeNO401-Model.pdf
ATTACHMENT
MajorBridgeNO402-Model.pdf
ATTACHMENT
ST-POWERSUPPLYRBletterdt25.09.2023.pdf
ATTACHMENT
MajorBridgeNO407-Model.pdf
ATTACHMENT
MajorBridgeNo426Model.pdf
ATTACHMENT
ST-RDSOCIRCUIT.pdf
ATTACHMENT
ST-RDSOSPNPART-2.pdf
ATTACHMENT
ST-RDSOSPNPART-4.pdf
ATTACHMENT
ImportantBridgeNo-198Model.pdf
ATTACHMENT
ST-RDSOSPNPART-5.pdf
ATTACHMENT
ImportantBridgeNo-500Model.pdf
ATTACHMENT
ST-RDSOSPNTELE-2-1.pdf
ATTACHMENT
BRNO3501x45.7ROR.pdf
ATTACHMENT
BRNO3962x45.7ROR.pdf
ATTACHMENT
BRNO481ROR1X30.5-Model.pdf
ATTACHMENT
BRNO529ROR1x45.7OWG-Model.pdf
ATTACHMENT
ST-RDSOSPNTELE-2-3.pdf
ATTACHMENT
MAJORBRIDGE-208ROR-Model.pdf
ATTACHMENT
ST-RDSOSPNTELE-2-4.pdf
ATTACHMENT
ROBBRNO314Model.pdf
ATTACHMENT
ROBBRNO315Model.pdf
ATTACHMENT
ST-RDSOSPNTELE-2-5.pdf
ATTACHMENT
ROBBRNO361Model.pdf
ATTACHMENT
ROBBRNO371Model.pdf
ATTACHMENT
ROBBRNO376Model.pdf
ATTACHMENT
RUBNO220-Model.pdf
ATTACHMENT
RUBNO223-Model.pdf
ATTACHMENT
RUBNO224-Model.pdf
ATTACHMENT
RUBNO226-Model.pdf
ATTACHMENT
RUBNO229Model.pdf
ATTACHMENT
RUBNO232Model.pdf
ATTACHMENT
RUBNO234-Model.pdf
ATTACHMENT
RUBNO237Model.pdf
ATTACHMENT
RUBNO249-Model.pdf
ATTACHMENT
RUBNO250-Model.pdf
ATTACHMENT
RUBNO260-Model.pdf
ATTACHMENT
RUBNO262-Model.pdf
ATTACHMENT
RUBNO264-Model.pdf
ATTACHMENT
RUBNO268Model.pdf
ATTACHMENT
RUBNO272Model.pdf
ATTACHMENT
RUBNO276Model.pdf
ATTACHMENT
RUBNO458Model.pdf
ATTACHMENT
RUBNO471Model.pdf
ATTACHMENT
MinorBridgeNO09Model.pdf
ATTACHMENT
MinorBridgeNO13Model.pdf
ATTACHMENT
MinorBridgeNO71Model.pdf
ATTACHMENT
MinorBridgeNO246-Model.pdf
ATTACHMENT
9.15mPSCslab.pdf
ATTACHMENT
11.COP-RDSO-10502.pdf
ATTACHMENT
30.5OWG_1.pdf
ATTACHMENT
ACS01toIRUSSOR2021-stainlesssteelforchequeredplate.pdf
ATTACHMENT
ATWeld_Manual-2022.pdf
ATTACHMENT
Brands_1.pdf
ATTACHMENT
BS_127R1GUIDELINESONTYPEOFFOUNDATIONSFORRAILWAYBRIDGES.pdf
ATTACHMENT
BS25RDSOreportonGuidelinesonuseofAdmixturesinConcrete.pdf
ATTACHMENT
BS28MasterListofDrawingsofBridgesStructuresDirectorateRDSO.pdf
ATTACHMENT
BS41-R1PileIntegritytest.pdf
ATTACHMENT
BS-80GuidelineforuseofPOT-PTFEbearings.pdf
ATTACHMENT
BS110RGuidelineofFabricarionofsteelgirdersforConstructionFieldEngineer.pdf
ATTACHMENT
BS-117RScourDepthEstimationCountermeasuresandMonitoringatBridgeCrossings-GuideforEngineers.pdf
ATTACHMENT
BS-118RDSOGUIDELINESONSEISMICDESIGNOFRAILWAYBRIDGES.pdf
ATTACHMENT
BS125Methodstatementforfabricationof45.7mthroughtypeopenwebgirderfor25tloadingdrawingnoB17181series.pdf
ATTACHMENT
BS128R3Guidelinesforcarryingoutofloaddeflectiontestofsteelplateandopenwebandsteel-concretecompositegirders.pdf
ATTACHMENT
BS139GUIDELINESFORFABRICATIONERECTIONLAUNCHINGANDTESTINGOFRDSOSTANDARDBOWSTRINGGIRDERS.pdf
ATTACHMENT
BS-140GUIDELINESFORFABRICATIONQUALITYCONTROLERECTIONINSPECTIONMAINTENANCEOFFOBs.pdf
ATTACHMENT
BS141GuidelinesforQualityControlErectionInspectionmaintenanceofPSCGirders.pdf
ATTACHMENT
BS-S-7.5.3.1.8ZincFlakeCoatingspecification.pdf
ATTACHMENT
CBS-0016GAD_Inspectionpfandpedestalforbearing.pdf
ATTACHMENT
CBS-0039RBracketarrangementforpassingofSTcablesparalleltotrack.pdf
ATTACHMENT
CBS-0045_COMPRESSED1.pdf
ATTACHMENT
ConduitPlanforCOPOpenFOBAreasigned.pdf
ATTACHMENT
DivyangjansPolicyLtr170125WithAnxx1.pdf
ATTACHMENT
DPIITletterdated16092020.pdf
ATTACHMENT
DPIITletterdated19072024.pdf
ATTACHMENT
EnggCodeUptoACS63Dt.02.08.24.pdf
ATTACHMENT
Executionmethodologyforformationtracklevelbridgeapproaches.pdf
ATTACHMENT
FBWManual-Reprint2022-.pdf
ATTACHMENT
Flooringonstaircase.pdf
ATTACHMENT
GE-G-4Guidelinesonerosioncontrolanddrainageofrailwayformation.pdf
ATTACHMENT
GE-G-5Guidelineonsoftsoils-stageconstructionmethod.pdf
ATTACHMENT
GE-G-8guidelinesforapplicationofJuteGetextileinRailwayEmbankmentshillslop.pdf
ATTACHMENT
GE-G-0011guidelinesforGeotechnicalEngineeringOrginZonalrailways.pdf
ATTACHMENT
GE-G-0015guidelineforcivilEnggInsp.Maintenanceandsafetyinexistingtunnels.pdf
ATTACHMENT
GE-G-0016guidelinesforsafetyintunnelsduringconstruction.pdf
ATTACHMENT
GE-G-0017guidelinesfordesignconstructionoftunnels.pdf
ATTACHMENT
IRBM2024_compressed_1.pdf
ATTACHMENT
IRCM-Part1.pdf
ATTACHMENT
IRCM-Part2.pdf
ATTACHMENT
IRS_Bridge_Rule_ACS_53.pdf
ATTACHMENT
IRS-B1IRSspecifnforfabricationerectionofsteelgirderbrloco-turntables.pdf
ATTACHMENT
IRSConcreteBridgeCode_compressed.pdf
ATTACHMENT
IRSFoundationSubstructureCode.pdf
ATTACHMENT
IRSOD_INCORPORATED_New.pdf
ATTACHMENT
IRSPileWellfoundation_Manual.pdf
ATTACHMENT
IRSSeismicCode-2020__compressed.pdf
ATTACHMENT
IRSSteelBridgeCode.pdf
ATTACHMENT
IRSWeldedBridgeCode.pdf
ATTACHMENT
IRWMCSUPTO12dtd.23.08.24.pdf
ATTACHMENT
M-0001.pdf
ATTACHMENT
RailwayboardletterforuseofstandardRDSOdrawing.pdf
ATTACHMENT
RDSO-10152-Allmerged.pdf
ATTACHMENT
RDSO10162.pdf
ATTACHMENT
RDSO-B-11760-R1_COMPRESSED.pdf
ATTACHMENT
RDSOletterforflooringonPfstairramp.pdf
ATTACHMENT
RevisedQualityAssurancePlanQAPforExpansionJoint.pdf
ATTACHMENT
Schedulefortechnicalrequirementforfebricationofsteelgirderpart-B.pdf
ATTACHMENT
ScheduleofTechnicalRequirementforFabricationofHighStrengthFrictionGripBoltingAssemblieswithDirectTensionIndicatorWasherSuitableforpreloading.pdf
ATTACHMENT
SchematicarrangementforPlatformutilityductsregarding.pdf
ATTACHMENT
SPECIF.FORFABRICATIONANDERECTIONOFSTEELGIRDER.pdf
ATTACHMENT
Specificationforboltingassemblieswithdirectortensionindicatorwashers.pdf
ATTACHMENT
SPECIFICATIONFORHIGHER-STRENGTHMARTENSITICSTAINLESSSTEELFORBRIDGEANDASSOCIATEDSTRUCTURALAPPLICATIONS.pdf
ATTACHMENT
SpecificationforPhasedArrayUltrasonicTestingProcedureforButtWeldedjointsinBridgeGirders.pdf
ATTACHMENT
SpecificationsforTrackBallastuptoACS-1.pdf
ATTACHMENT
StandardLayoutofStationBuilding21062024_compressed.pdf
ATTACHMENT
STRFORMANUFACTUREANDSUPPLYOFELASTOMERICBEARING.pdf
ATTACHMENT
STRFORMANUFACTUREANDSUPPLYOFPOT-PTFEbearings.pdf
ATTACHMENT
StructuraldrawingofvariousheightsofRetainingwall.1_compressed.pdf
ATTACHMENT
SurfaceFinishCOPOpenAreaImportantOtherStnsigned.pdf
ATTACHMENT
TectileTilelayoutarrangement.pdf
ATTACHMENT
RDSO17182ROWG.pdf
ATTACHMENT
RDSO17161ROWG.pdf
ATTACHMENT
RDSO17181ROWG.pdf
ATTACHMENT
10280PSCSLAB.pdf
ATTACHMENT
SH-06-1.pdf
ATTACHMENT
10280PSCSLAB_1.pdf
ATTACHMENT
WeldedCompositeGirderRDSO_compressed.pdf
ATTACHMENT
CompositeGirder_compressed.pdf
ATTACHMENT
RDSO11753-R3SERIESCG_compressed.pdf
ATTACHMENT
ST-QUALITY-CHECK-SECR.pdf
ATTACHMENT
ST-PT-MC-SPEC1.pdf
ATTACHMENT
ST-DL-SPEC1.pdf
ATTACHMENT
ST-CIVIL-KAVACHSAMPLEDRAWINGS-1-10.pdf
ATTACHMENT
ST-CIVIL-KAVACHSAMPLEDRAWINGS-11-21.pdf
ATTACHMENT
26616Detailed_list_of_PSC_and_UHPC_SLABs.pdf
ATTACHMENT
29.StandardBridgeProtectionDrawing.pdf
ATTACHMENT
26.rdsoboundarywall.pdf
ATTACHMENT
30.TypeIVdrawings_compressed.pdf
ATTACHMENT
2661626525REPOSITORY_FOB_ramp.pdf
ATTACHMENT
30.b.TypeIIdrawing_compressed.pdf
ATTACHMENT
2661626525RCC_BOX_CULVERT.pdf
ATTACHMENT
31.PumpHousedrawing.pdf
ATTACHMENT
41.Provisionofamenitiesatstationforpersonswithdisabilities.pdf
ATTACHMENT
42.PassengerAmenitiesatstation.pdf
ATTACHMENT
2661626525RDSO_std_OWG.pdf
ATTACHMENT
44.MasterListofDrawingsofBridgesStructures.pdf
ATTACHMENT
71-2020TypicalDiagramofCentralEIEndGoomtyBuildingfor3rdor4thlinesectionTypical71-2020.pdf
ATTACHMENT
2661626525REPOSITORY_Composite.pdf
ATTACHMENT
85.2026TypicalforSTServiceBuildingEIforCentralizedandDistributedEI.pdf
ATTACHMENT
2661626525REPOSITORY_FOB.pdf
ATTACHMENT
2661626525REPOSITORY_FOB_ramp_1.pdf
ATTACHMENT
2661626525REPOSITORY_PF_Shelter1.pdf
ATTACHMENT
GADOFTOWERWAGONSHEDOFBHILAISTATIONYARD.pdf
ATTACHMENT
IRspecificationsforsleeperstrackfittingandothermaterials.pdf
ATTACHMENT
2661626525REPOSITORY_PF_Shelter.pdf
ATTACHMENT
SILLESTNUNDERPASS.pdf
ATTACHMENT
StdDrawingofTowerWagonShed.pdf
ATTACHMENT
2662910468FOBDrawing_.pdf
ATTACHMENT
GADofBIAOHEDEPOT1.pdf
ATTACHMENT
NonStandardapproveddrawinglist.pdf
ATTACHMENT
DesignBasisReportDBRandTechnicalAdvisoryGroupTAGfornewimportantbridges.pdf
ATTACHMENT
ImprovingtheplanningandconstructionofmajororImportantbridgesandopeningthereof.pdf
ATTACHMENT
31_01_2026_CompliancewithCodalProvisionsforPileFoundationTesting.pdf
ATTACHMENT
11_03_2026_ClassificationofBridgesRevisedDefinition.pdf
ATTACHMENT
19_05_2026_CoreTestPermeabilityTestNDTTestinadditiontoCubeTestforconcreteworksinBridges.pdf
ATTACHMENT
09_06_2026_CoreTestPermeabilityTestandNDTUPVTestinadditiontoCubeTestforconcreteworksinBridges-Strictcomplianceandmonitoringthereof.pdf
ATTACHMENT
ST-SIP-PARAMALKASA-ALT.pdf
ATTACHMENT
ST-SIP-BHANPURI-Y-NEW.pdf
ATTACHMENT
ST-SIP-BHANSOJ-NEW.pdf
ATTACHMENT
ST-SIP-GIRHOLA-NEW.pdf
ATTACHMENT
ST-SIP-GUJRA-NEW.pdf
ATTACHMENT
ST-SIP-KHARORA-NEW.pdf
ATTACHMENT
ST-SIP-LAKHOLI-ALT.pdf
ATTACHMENT
ST-SIP-MARODA-Y-NEW.pdf
ATTACHMENT
ST-SIP-NEWABHANPUR-NEW.pdf
ATTACHMENT
ST-SIP-PARASWANI-NEW.pdf
ATTACHMENT
ST-SIP-PATAN-NEW.pdf
ATTACHMENT
ST-SIP-PURAI-NEW.pdf
ATTACHMENT
STSIPRISDA.pdf
ATTACHMENT
ST-SIP-BHANPURI-NEW.pdf
ATTACHMENT
9SpecificationsforTrackBallast-IS-RDSO-GE-00012023.pdf
ATTACHMENT
1ESPofRisda.pdf
ATTACHMENT
2ESPofParswani.pdf
ATTACHMENT
3ESPofKharora.pdf
ATTACHMENT
4ESPofBhansuj.pdf
ATTACHMENT
5ESPOFLAKHOLI.pdf
ATTACHMENT
6ESPofGujra.pdf
ATTACHMENT
7ESPofGirhola.pdf
ATTACHMENT
8ESPofNewAbhanpur.pdf
ATTACHMENT
9ESPofpatan.pdf
ATTACHMENT
10ESPofPurai.pdf
ATTACHMENT
11ESPOFMARAUDACABIN.pdf
ATTACHMENT
12ESPOFNEWBHANPURICABIN.pdf
ATTACHMENT
13ESPofBhanpuri.pdf
ATTACHMENT
14ESPOFPARMALKASA.pdf
ATTACHMENT
10ComprehensiveGuidelineRDSO-2020-GE-IRS-0004-1-100_1.pdf
ATTACHMENT
10ComprehensiveGuidelineRDSO-2020-GE-IRS-0004-101-223_compressed.pdf
ATTACHMENT
10ComprehensiveGuidelineRDSO-2020-GE-IRS-0004-101-223_2.pdf
ATTACHMENT
MethodStatement_EarthworkinBank1.pdf
ATTACHMENT
Rivisionofplinthareanorms08_04_2024.pdf
ATTACHMENT
26.02.2026_RevisedApprovedlistofBrandsandMakes2026withallenclosures11-2-22.pdf
ATTACHMENT
DivyangjanguidelinesGazette.pdf
ATTACHMENT
PS110-135.pdf
ATTACHMENT
PS135-160.pdf
ATTACHMENT
PS160-185.pdf
ATTACHMENT
PS185-210.pdf
ATTACHMENT
PS210-235.pdf
ATTACHMENT
PS235-260.pdf
ATTACHMENT
PS260-278.pdf
ATTACHMENT
PSPMSROR.pdf
ATTACHMENT
PSYConnectionMarodaandLakholi.pdf
ATTACHMENT
CAO-C-BSP-26-27-13DraftEPCAgreementPt2ST-SCOPE-EX-BZR-PMS.pdf
ATTACHMENT
CAO-C-BSP-26-27-13RFPDocument.pdf
ATTACHMENT
StonePitching.pdf
ATTACHMENT
CAO-C-BSP-26-27-13DraftEPCAgreementPt1_1.pdf
ATTACHMENT
KMZFILE.pdf
ATTACHMENT
GeotechandHyrdologyReport.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].