| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC BAZARPURA NOWROZABAD MADHYA PRADESH 484555 DIST UMARIA M P | NOWROZABAD | UMARIA | MADHYA PRADESH | 484555 | L1 | Accepted-AOC Accepted being L1 | |
| 2 | L2₹4.5 L+₹75,189.54 (20.1%)Rejected-Finance WARD NO 11 NEAR CENTRAL SCHOOL MOUHARPARA MANENDRAGARH DIST MCB C G 497442 | MANENDRAGARH | MCB | C G | 497442 | L2 | Rejected-Finance Rejected being L2 | |
| 3 | Rejected-Technical 12 69 NEAR BLOCK OFFICE GAYATRI MANDIR LINE WARD NO 12 BIRSINGHPUR PALI BIRSINGHPUR PALI UMARIA MADHYA PRADESH 484551 UDYAM MP 50 0001263 | UMARIA | MADHYA PRADESH | 484551 | - | Rejected-Technical Shortfall not responded |
| Sl No | Description | Qty | Unit | SURESH ELECTRICALS L1 | GURU ENTEREPRISES L2 |
|---|---|---|---|---|---|
| 1.00Part A: Details: Make- Electric Corporation, 33KV/3.3KV, 750KVA, 50C/S, Oil Cooled, Serial No. 249/1, Local No.-TFR 14 of Birsinghpur Mine, Pali Sub Area.(Power Transformer) | |||||
| 2.00Partial Repairing, rewinding, &Testing of Power Transformer by Replacement of damaged Primary coil of one limb and all Primary & secondary winding reinsulation of three Paper insulated as per original sample and size. Replacement of Gasket packing, insulating materials for overall insulation, dehumifying of core and coil assembly. Dismantaling, replacement of damaged parts i.e.Tap-changer insulators & Others and refitting including connection and filteration of Oil, cleaning and painting with single coat of primer and two Coats of approved make synthetic enamel paints. (WITH TAXES GST 18%) | |||||
| 3.00a) Total Core plus copper winding weight = 2400kg, Total Copper Winding Weight(Primary +secondary) = 2400X0.35= 840kg | |||||
| 4.00 | b) Copper wire for Primary core of transformer(60% of total copper winding wieght/3) | 168 | kg | 1,000 ₹1,68,000 Lowest | 1,050 ₹1,76,400 |
| 5.00 | c) Insulating Material and varnish for all primary and secondary windings of Transformer | 1 | job | 28,700 ₹28,700 Lowest | 34,000 ₹34,000 |
| 6.00 | d) Providing and Fixing breather of desired size | 1 | job | 2,460 ₹2,460 Lowest | 2,800 ₹2,800 |
| 7.00 | e) Labour Charges 10% of sl. No. 4(b) | 1 | job | 14,581.24 ₹14,581.24 Lowest | 17,700 ₹17,700 |
| 8.00 | f) Less Scrap Copper(60% of sl. No. 4 (b)) | 1 | job | 1,06,693.78 ₹-1,06,693.78 | 1,05,840 ₹-1,05,840 Lowest |
| 9.00Part B. Details: Make- Andrew Yule ,33KV/3.3KV, 1000KVA, 50C/S, Oil Cooled, Serial No. Name Plate Missing, Local No.-TFR 34 of Umaria Mine,Umaria Sub Area. (Power Transformer) | |||||
| 10.00Partial Repairing, rewinding, &Testing of Power Transformer by Replacement of one damaged Primary winding coil and all Primary & secondary winding reinsulation of three Paper insulated as per original sample and size. Replacement of Gasket packing, insulating materials for overall insulation, dehumifying of core and coil assembly.Dismantaling, replacement of damaged parts i.e.Tap-changer insulators & Others and refitting including connection and filteration of Oil, cleaning and painting with single coat of primer and two Coats of approved make synthetic enamel paints. (WITH TAXES GST 18%) | |||||
Tender Value
₹5.4 L
EMD Value
₹6,800
Closing Date
31 Jul 2025, 10:00 amClosed
SO EnM Johilla Area
EnM Department Johilla Area
Rewinding and Repairing of power transformers Rating 33KV 3.3KV Capacity 750 KVA and 1000 KVA and transformers Rating 3.3KV 440V. Capacity 250 KVA of different units of Johilla Area.
2025_SECL_339937_1
SECL/JHL/SO(EM)/25-26/et/40 dt.19.07.2025
Open Tender
Electrical and Maintenance Works
Item Rate
60 days
Regional Workshop Johilla Area
5 documents required · 5 mandatory
₹6,800
29 Sept 2025
19 Jul 2025
1 Aug 2025
19 Jul 2025
31 Jul 2025
21 Jul 2025
19 Jul 2025 - 24 Jul 2025
Amount
Part A: Details: Make- Electric Corporation, 33KV/3.3KV, 750KVA, 50C/S, Oil Cooled, Serial No. 249/1, Local No.-TFR 14 of Birsinghpur Mine, Pali Sub Area.(Power Transformer)
Partial Repairing, rewinding, &Testing of Power Transformer by Replacement of damaged Primary coil of one limb and all Primary & secondary winding reinsulation of three Paper insulated as per original sample and size. Replacement of Gasket packing, insulating materials for overall insulation, dehumifying of core and coil assembly. Dismantaling, replacement of damaged parts i.e.Tap-changer insulators & Others and refitting including connection and filteration of Oil, cleaning and painting with single coat of primer and two Coats of approved make synthetic enamel paints. (WITH TAXES GST 18%)
a) Total Core plus copper winding weight = 2400kg, Total Copper Winding Weight(Primary +secondary) = 2400X0.35= 840kg
b) Copper wire for Primary core of transformer(60% of total copper winding wieght/3)
c) Insulating Material and varnish for all primary and secondary windings of Transformer
d) Providing and Fixing breather of desired size
e) Labour Charges 10% of sl. No. 4(b)
f) Less Scrap Copper(60% of sl. No. 4 (b))
Part B. Details: Make- Andrew Yule ,33KV/3.3KV, 1000KVA, 50C/S, Oil Cooled, Serial No. Name Plate Missing, Local No.-TFR 34 of Umaria Mine,Umaria Sub Area. (Power Transformer)
Partial Repairing, rewinding, &Testing of Power Transformer by Replacement of one damaged Primary winding coil and all Primary & secondary winding reinsulation of three Paper insulated as per original sample and size. Replacement of Gasket packing, insulating materials for overall insulation, dehumifying of core and coil assembly.Dismantaling, replacement of damaged parts i.e.Tap-changer insulators & Others and refitting including connection and filteration of Oil, cleaning and painting with single coat of primer and two Coats of approved make synthetic enamel paints. (WITH TAXES GST 18%)
a) Total Core plus copper winding weight = 1377kg, Total Copper Winding Weight(Primary +secondary) =35% of core plus copper wieght= 1377kgx0.35= 482kg
b) Copper wire for One Primary Winding of transformer(60% of total copper winding weight /3)
c) Insulating Material and varnish for all primary and secondary windings of Transformer
d) Providing and Fixing breather of desired size
e) Labour Charges 10% of sl. No. 12(b)
f) Less Scrap Copper(60% of sl. No. 12 (b))
Part C: Details: Make- Kirloskar, 33KV/3.3KV, 1000KVA, Oil Cooled, Serial No., Local No. TFR 22 , Birsingpur Mine, Johilla Area
Partial Repairing, rewinding, &Testing of Power Transformer by Replacement of damaged one coil of Primary and all Primary & secondary winding reinsulation of three Paper insulated as per original sample and size. Replacement of Gasket packing, insulating materials for overall insulation, dehumifying of core and coil assembly.Dismantaling, replacement of damaged parts i.e.Tap-changer insulators & Others and refitting including connection and filteration of Oil, cleaning and painting with single coat of primer and two Coats of approved make synthetic enamel paints. (WITH TAXES GST 18%)
a) Total Core plus copper winding weight = 2400kg, Total Copper Winding Weight(Primary +secondary) = 2400X0.35= 840kg
b) Copper wire for Primary core of transformer(60% of total copper winding weight/3)
c) Insulating Material and varnish for all primary and secondary windings of Transformer
d) Providing and Fixing breather of desired size
e) Labour Charges 10% of sl. No. 20(b)
f) Less Scrap Copper(60% of sl. No. 20(b))
Part D: Details: Make- GEC, 3.3KV/440V , 250KVA, 50C/S, Oil Cooled, Serial No., Local No. TFR 07 of Nowrozabad Mine, NSA.
Partial Repairing, rewinding, & Testing of Transformer by Replacement of all Primary winding coil and Re Inulsation of all primary & secondary winding of Paper insulated copper strip as per original sample and size. Replacement of Gasket packing, insulating materials for overall insulation, dehumifying of core and coil assembly.Dismantaling, replacement of damaged parts and refitting including connection and filteration of Oil, cleaning and painting with single coat of primer and two Coats of approved make systhetic enamel paints.
a) Super enamelled Copper wire for transformer, Core plus copper winding weight = 515kg, Copper Winding Weight = 515X0.35= 180kg, Primary Winding Weight (Copper Winding Weight x60%)=108 Kg
b) Insulating Material and varnish for all primary and secondary windings of Transformer
c) Labour Charges 10% of sl. No. 27(a)
d) Less Scrap Copper(60% of sl. No. 27 (a)
Part E: Details: Make- GEC, 3.3KV/440 , 250KVA, 50C/S, Oil Cooled, Serial No. 22892, Local No. TFR 5 of Pali Mine Pali Sub Area
Partial Repairing, rewinding, &Testing of Power Transformer by Replacement of one Primary winding coil and Re-Insulation all Primary & secondary winding of Paper insulated copper strip as per original sample and size. Replacement of Gasket packing, insulating materials for overall insulation, dehumifying of core and coil assembly.Dismantaling, replacement of damaged parts and refitting including connection and filteration of Oil, cleaning and painting with single coat of primer and two Coats of approved make systhetic enamel paints
a) Super enamelled Copper wire for transformer, Core plus copper winding weight = 364, Copper Winding Weight = 364X0.35= 127kg, Primary Copper Winding Weight (Total Weight of Winding x.60%)=76 KG, Copper for One limb of Primary Winding (76/3)
b) Insulating Material and varnish for all primary and secondary windings of Transformer
c) Labour Charges 10% of sl. No. 33(a)
d) Less Scrap Copper(60% of sl. No. 33 (a)
Part F: Details: Make- GEC, 3.3KV/440V , 250 KVA, 50C/S, Oil Cooled, Serial NoB22624., Local No. TFR 37, Umaria Colliery, USA
Partial Repairing, rewinding, &Testing of Power Transformer by Replacement of one Primary winding coil and Re-Insulation all Primary & secondary winding of Paper insulated copper strip as per original sample and size. Replacement of Gasket packing, insulating materials for overall insulation, dehumifying of core and coil assembly.Dismantaling, replacement of damaged parts and refitting including connection and filteration of Oil, cleaning and painting with single coat of primer and two Coats of approved make systhetic enamel paints
a) Super enamelled Copper wire for transformer, Core plus copper winding weight = 364, Copper Winding Weight = 364X0.35= 127kg, Primary Copper Winding Weight (Total Weight of Winding x.60%)=76 KG, Copper for One limb of Primary Winding (76/3)
b) Insulating Material and varnish for all primary and secondary windings of Transformer
c) Labour Charges 10% of sl. No. 39(a)
d) Less Scrap Copper(60% of sl. No. 39 (a)
Total impact of GST for the purpose of CTC
GURU ENTEREPRISES (BID ID -1171575)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .