Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAccepted-AOC | ₹5.7 L Quoted ₹5.1 L | L1 | Accepted-AOC AOC |
| 2 | L2₹5.5 L+₹38,798 (7.65%)Rejected-Finance | ₹5.5 L+₹38,798 (7.65%) | L2 | Rejected-Finance L2 |
| 3 | L3₹5.6 L+₹55,063 (10.9%)Rejected-Finance | ₹5.6 L+₹55,063 (10.9%) | L3 | Rejected-Finance L3 |
| 4 | L4₹5.6 L+₹55,910 (11.0%)Rejected-Finance | ₹5.6 L+₹55,910 (11.0%) | L4 | Rejected-Finance L4 |
| 5 | L5₹5.7 L+₹59,214 (11.7%)Rejected-Finance | ₹5.7 L+₹59,214 (11.7%) | L5 | Rejected-Finance L5 |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
10 Jul 2026, 4:00 pmClosed
Executive Engineer
PMGSY Division Kupwara
Permanent restoration of Laderwan Ladernag road Package No. JK0853
2026_KSRRD_148575_7
04/EE/PMGSY/KUP/eNIT of 2026-27
Open Tender
Civil Works - Roads
Percentage
30 days
Kupwara
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
₹20,000
Yes
6 Aug 2026
4 Jul 2026
11 Jul 2026
4 Jul 2026
10 Jul 2026
4 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. | 111.12 | Cum | 164.23 | ₹18,249.24 |
| 2 | P/L of stone soling | 23.24 | Cum | 613.77 | ₹14,264.01 |
| 3 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 17.36 | Cum | 5,277.19 | ₹91,612.02 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering.1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 96.36 | cum | 6,055.99 | ₹5,83,555.2 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form workfor:4.6.1 Foundations, footings, bases for columns | 309.6 | sqm | 251.07 | ₹77,731.27 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) (Flooring) | 1.96 | cum | 6,379 | ₹12,502.84 |
| 7 | Providing weepholes in brick masonry/ stone masonry, plain / reinforced concrete abutments, wing wall. Return wall with 100mm dia AC pipe extending through the full width of the structures with slope of 1(V) : 20(H) towards drawing face complete as per drawings and technical specifications clause 614, 709, 1204.3.7. | 80 | No | 254.51 | ₹20,360.8 |
| 8 | Back filling with Granural material back side of walls ( incl cost of material but excluding carriage) as per directions of engineer in charge | 43.2 | Cum | 667.65 | ₹28,842.48 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_233153.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .