| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-Finance | L1 | Accepted-Finance Found OK | |
| 2 | L2₹5.1 L+₹13,543 (2.71%)Accepted-Finance | L2 | Accepted-Finance Found OK | |
| 3 | L3₹5.2 L+₹23,275 (4.66%)Accepted-Finance | L3 | Accepted-Finance Found OK | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
20 May 2020, 12:00 pmClosed
SE EDC-I ALIGARH
LAL DIGGI ALIGARH
Replacement of 33 KV/11KV/LT lines pole line, cable etc. damaged due to various reasons Deviya Aapda and restoration of supply under EDD-I, Aligarh
2020_DVVNL_470218_1
EDCA-01/2020-21
Open Tender
Electrical Works
Item Rate
60 days
EDD-I Aligarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
DVVNL AGRA
₹10,000
28 May 2020
15 May 2020
20 May 2020
15 May 2020
20 May 2020
15 May 2020
Amount
Cartage of following PCC poles Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.).
PCC poles 8.5 Mtr.
PCC poles 9 Mtr.
Cartage of line material viz Weasal Conductor, GI earth wire, Cross Arm, Angle, Channel, Insulator, Clamps & other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.).
Erection of single support including complete H.T/L.T fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.
PCC poles 8.5 Mtr.
PCC poles 9 Mtr.
Dismentling of old and damaged double pole after dismentling of all accessories.
11 KV line double pole
11 KV line single pole
Erection of double pole on PCC pole including the work of complete line as per RESPO norm manual and as per direction of Engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.
Laying , sagging, stringing, binding and jumpering etc. of old line conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
ACSR Weasal Condutor
LT 3x95+1x70+1x16 bunch conductor.
Retighting of stay complete with nozelling & binding including cost of labour T&P etc required for proper completion of work.
Re-sagging of loose HT/LT line conductor as per direction of superwising engineer. It includes the cost of labour T&P carrier etc. required for proper completion of work.
ACSR Weasal Condutor
ACSR Dog Condutor
Straightening of tilted pole at various places as per direction of JE.
PCC poles 8.5 Mtr.
Replacement of following damaged accessories:-
11 KV Disc Insulator
11 KV Pin Insulator
11 KV V-type Cross Arm
Drilling and cutting of tee off channel, V cross arms, Top channel, cross bracing angle, MS garding angle, Dropper chanel as per specification of UPPCL construction manual including including loading and unloading at the both ends.
Grouting of PCC poles as per RESPO norms including cost of grouting material (cement: sand: brick ballast) size 1500x450x450 mm). This qty also includes the additional work of old & existing LT line which has to be converted into HT line. Presently the supports of old line do not have grouting.
PCC poles 8.5 Mtr.
Chopping of tree branches which are touching to 11 KV/LT lines.
Demounting & installation of following capacity transformer due to damage of PCC poles in storm including the work of its loading & unloading, dragging etc. and also including the cost of labour and T&P etc. required for proper completion of work.
10/16 KVA T/F
25 KVA T/F
63 KVA T/F
Providing & fixing clamps for supporting various type accessories such as cross arm, F-clamps etc.
Guarding of old 11 KV line damaged due to storm by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 Mtr. as per RESPO manual and also including the cost of arragement of labour, T & P etc. required for proper completion of work.
Fixing of earthing rod as per RESPO manual and as per direction of supervising engineer including the cost of labour, T&P etc. Required for proper completion of work.
(a) Erection and grouting of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work
(b) Providing and fixing of stay insulator.
Erection of section Tee pole including fixing of all fittings as per RESPO norms.
Installation of extra “T”on the old erected poles wherever required alongwith all fitting as per direction of supervising engineer including the cost of labour, T&P etc. required for proper completion of work. The “T”pole shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement.
MS M.R.G.ENTERPRISES
K.D. (INDIA)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .