| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹96,138.80Accepted-Finance PLOT NO 06 SHIV VIHAR KALYANPUR KANPUR | KANPUR | KANPUR | UTTAR PRADESH | ₹96,138.80 | L-1 | Accepted-Finance L-1 |
| 2 | L-2₹9.7 L+₹8.7 L (904.7%)Rejected-Finance 561 8 | KANPUR | KANPUR NAGAR | UTTAR PRADESH | ₹9.7 L+₹8.7 L (904.7%) | L-2 | Rejected-Finance L-2 |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance 00 BHUSAR FARM KE PASS K K PURI NANDANPURA JHANSI UTTAR PRADESH 284003 | JHANSI | UTTAR PRADESH | 284003 | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹9.7 L
EMD Value
₹97,075
Closing Date
5 May 2026, 3:00 pmClosed
ce knn
ce knn moti jheel
Improvement of drain and C.C road from Pappu gupta house to Kishor gupta house via Rahul house in Abhilasa sani centre lane in nawabganj ward-43 Under Zone 6.
2026_NNKAN_1145291_1
892/AA-6/2025-26
Open Tender
Civil Works
Percentage
45 days
kanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹97,075
31 Jul 2026
5 May 2026
5 May 2026
5 May 2026
5 May 2026
5 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavating Supplying, and filling of local earth (including royaity) by mechanical upto 1km also including ramming and watering of the earth in layers not 20 cm in trenches, plinth sides foundation etc complete. Add extra on above item no-2.25(b) a for 3km cartage including all complete. | 97.2 | sqm | 125 | ₹12,150 |
| 2 | Earth work in excavation by mechanical means hydraulic excavator in trenches for foundation pipe cable etc in ordinary soil (Loan clay or sand)including lift up to 1.5 m. lead up to 50m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer i/c within a lead of 50m. | 86.4 | cum | 215 | ₹18,576 |
| 3 | Laying of base concrete 1:6:12 with cement C.Sand & 40mm Brick ballast including mat.Lab.T&P,etc all complete.) Providing and laying in cement concrete in 1:6:12 (1 cement: 6 fine sand: 12 graded brick aggregate 40 mm. nominal size) and curing complete, including cost of formwork in foundation and floors. | 16.41 | cum | 4,380 | ₹71,875.8 |
| 4 | Class-150 brick work in 1:4 cement & coarse sand mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. required for proper completion of the work, etc all complete. | 41.25 | cum | 6,600 | ₹2,72,250 |
| 5 | 12mm. Thick plaster in single coat on fair side of single or half brick wall for interior plastering up to floor two level including internal rounded angles chamfers and/or rounded angles not exceeding 80 mm. in girth and finished evenand smooth No extra for mixing any additive and 1:3 cement:coarse sand etc all complete. | 310.5 | sqm | 182 | ₹56,511 |
| 6 | R.C.C works with1:1.5:3 cement approved coarse sand and 2 cm (3/4") gauge approved stone ballast in the proportion 1:1.5:3 (1 cement:6 aggregate) in lintels of doors and windows excluding supply of reinforcement and its bending the same with 24 BWG binding wire and necessary centring and shuttering etc. and also including supply of all materials labours and tools and plants etc. required for proper completion of work. stone ballast but for slab including shuttering mat. Lab etc. All complete | 0.97 | cum | 8,720 | ₹8,458.4 |
| 7 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not include in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authrized overlapping shall be measured up to floor two level(over all Rate) 12 mm to 32 mm. tor etc.all complete. | 0.76 | qtl | 7,200 | ₹5,472 |
| 8 | construction of gsb granular sub base by providing well graded material spreding in uniform layers with mortar grader on prepared surface complete as per mort&h etc all complete | 25.92 | cum | 3,671 | ₹95,152.32 |
| 9 | Providing and laying in cement concrete 1:1.5:3 of not less than strength of M-20 (1 cement: 1.5 approved coarse: 3 stone ballast 20 mm nominal size) and curring complete including cost of formwork in foundation and floors etc all complete.Ch-5(279a) | 38.88 | cum | 7,160 | ₹2,78,380.8 |
| 10 | providing and fixing of sign board etc all complete. | 1 | nos | 3,840 | ₹3,840 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 14.60 MB
BOQ_2140674.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .