| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.0 CrAccepted-AOC | ₹3.0 Cr | 1 | Accepted-AOC ok |
| 2 | 2₹3.2 Cr+₹16.5 L (5.53%)Rejected-Finance | ₹3.2 Cr+₹16.5 L (5.53%) | 2 | Rejected-Finance Reject |
Tender Value
₹3.6 Cr
EMD Value
₹3.6 L
Closing Date
23 Aug 2024, 3:00 pmClosed
Executive Officer
Seithur
Providing BT surface with Storm Water Drain at Ward 3, Valayar New street, Ward 4, Sri Mariamman Nagar, 11No Main Road, Ward 8, Manthai Street West side, Ward 9, Nadar New street in Seithur Town Panchayat.
2024_DTP_472763_1
TURIF - 2024-2025 Seithur TP - 80-1
Open Tender
Civil Works
Works
90 days
Seithur
Class I
3 documents required · 3 mandatory
₹0
₹3.6 L
Yes
Seithur
28 Aug 2024
13 Aug 2024
23 Aug 2024
13 Aug 2024
23 Aug 2024
13 Aug 2024
19 Aug 2024
Amount
Earth work excavation in all soils for foundation except hard rock requiring blasting with an initial lead of 10m and lift of 2m and depositing earth on bank for refilling as directed by department offices etc., complete as per standard specification
Plain Cement Concrete 1:4:8 mix using 40mm ISS HBG metal from approved Quarry including cost and conveyance of all materials and all labour charges for mixing, laying, compacting and curing the concrete and other incidental charges etc., complete. as per standard specification
Steel shuttering with MS Sheets and MS angels including fixing in position with country wood scantlings for drain side walls including cost and conveyance of all materials and all labour charges to site and other incidental charges etc., complete. as per standard specification 86 K, 86 A side wall :
Plain Cement Concrete 1:2:4 Mix (one part cement, three part M.sand and six part of aggrigate) using 20 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge.
Finishing the top of flooring with granothatic flooring with cement concrete 1:2:4 (one cement, two sand and four aggrigate) using 10 to 12mm stone chips – 25mm tk etc., Complete.
Supplying and fabrication of steel and placing in position of TMT steel rods for RCC works as per design given including cost of steel and GI binding wire in all floors etc., complete complying with standard specification in TNDSS NO:97 V,VI (S6) VII (S6), VII-3.
Construction of Granular Sub-base by providing close graded material,mixing in a machanical plant at OMC,carriage of mixed material to work site,spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to acheive the desired density,Complete as per clause 401.
Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456-2000 Using 20mm and down grade hard broken granite Stone jelly for all RCC items of works with mimimum cement contenet of 325 kg /cum and maximum water cement ratio of 0.55 incluting admixtur (plasticier /super plasticiser ) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workabillity without imparing strength and durabillity with about (5.0cum), 7730kg of 20mm machine crushed stone jelly and with about (3.3cum),5156 kg of 10- 12mm machine crushed stone jelly and with about (4.79 cum) 7670kg of sand but excluting cost of reinforcedment grill and fabricating charges centering and shuttering but incluting laying vibrating with machine vibrating ,finishing ,curring ,etc,,and providing fixtures like fan clamps in the RCC Floor /roof slabs wherever necessary without claiming extra cost etc., compete complying with standard specificaton and as directed by the departmental officer -The Coarse and Fine aggregates to be used should comply with the requirements of IS Standards. (No separate payments will be made by the depatment for the excess usage of materials )
Providing, laying, spreading and compacting stone aggregate to wet mix macadam 250mm thick specification including premixing the materials with water at omc in mechanical mix plant carriage of mixed materials by tipper to site laying in uniform layers with pavers in sult base / base course on well prepard surface and compacting with vibratory roller to achive the desired density including cost of materials labour rentals for machinery fuel and all other incidentals charges etc complete as per clause 406 of MORTH REV -5
Providing and laying Priming coat over WBM/WMM surface using 7Kg over WBM surface using of Emulsion Bitumen for 10 Sq.m and cost of Emulsion Bitumen will be borne by the contractor for procurement as per special condition appended including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and for applying the required quantity of bituminous by mechanical sprayer including hire and fuel for all tools and plants employed and other incidental charges etc., complete. as per standard specification 503,507 MORTH
Providing and laying Priming coat over WBM/WMM surface using 2.5Kg over WBM surface using of Emulsion Bitumen for 10 Sq.m and cost of Emulsion Bitumen will be borne by the contractor for procurement as per special condition appended including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and for applying the required quantity of bituminous by mechanical sprayer including hire and fuel for all tools and plants employed and other incidental charges etc., complete. as per standard specification 503,507 MORTH
Providing and laying 50mm Consolidated thick Dense Bituminous Mecadam using 0.24 cum of 26.50 – 13.20 mm Graded metal and 0.25 cum of 13.20 – 2.36 mm Grade metal and 0.23 cum of 2.36 mm & below with 53.20 kgs of 60/70 Grade Bulk bitumen for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 505 of MORTH Rev-5
Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 45.27 kgs of 60/70 Grade Bulk bitumen and 5.03kg of shredded Plastic waste for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
K Selvi (BID ID -1117137)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .