Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | H1₹24.8 LAdmitted-Finance | +3.42% | ₹24.8 L | H1 | Admitted-Finance |
| 2 | H2₹23.4 L−₹1.4 L (5.54%)Admitted-Finance | -2.31% | ₹23.4 L−₹1.4 L (5.54%) | H2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹24.0 L
EMD Value
₹47,960
Closing Date
31 May 2026, 6:00 pmClosed
executive officer
nagar palika dudu
Construction Of Tin Shed And Other Repair Work At Nagar Palika Office Dudu
2026_DLB_562052_1
enitnirmandudu3
Open Tender
Civil Works
Percentage
dudu
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
executive officer
₹47,960
Yes
15 Jun 2026
23 May 2026
1 Jun 2026
23 May 2026
31 May 2026
23 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m | 96.19 | cum | 229.5 | ₹22,075.61 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | 23.63 | cum | 4,575 | ₹1,08,107.25 |
| 3 | Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of compensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km) | 1,155 | cum | 178.5 | ₹2,06,167.5 |
| 4 | Carriage of Materials by mechanical transport including loading, unloading and stacking ::EARTH (5 KM) | 1,251.19 | cum | 254.76 | ₹3,18,753.16 |
| 5 | Random rubble stone masonry work in cement mortar with mechanical mixer in foundation (at any level) complete as per drawing and technical specification and as per clause 1000 and 1400 of MoRT&H specification including all scaffolding material, labour, machinery but excluding pointing and plastering.In cement mortar 1:4 (1 cement : 4 coarse sand) | 27 | cum | 5,270 | ₹1,42,290 |
| 6 | Brick work with FPS bricks of class designation 75 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) | 25.88 | cum | 5,400 | ₹1,39,752 |
| 7 | Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 2,000 | kg | 144.5 | ₹2,89,000 |
| 8 | Plastering with cement mortar (1:3) on Brick/stone work in substructure/ super structure at any height complete as per clause 1312 of MoRT&H specification including all material, labour, scaffolding etc.20 mm plaster on stone work | 1,125 | sqm | 262.5 | ₹2,95,312.5 |
| 9 | Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete | 1,125 | sqm | 204.5 | ₹2,30,062.5 |
| 10 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade New work (Two or more coats applied @ 1.43 ltr/ 10 sqm. over and including base coat of water proofing cement paint applied @ 2.20 kg/ 10 sqm). | 1,125 | sqm | 132.5 | ₹1,49,062.5 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_1000108.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .