Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.7 LAccepted-AOC | ₹27.7 L | L1 | Accepted-AOC Awarded |
| 2 | L2₹29.5 L+₹1.7 L (6.25%)Rejected-Finance | ₹29.5 L+₹1.7 L (6.25%) | L2 | Rejected-Finance Refer to Financial minutes. |
| 3 | L3₹31.0 L+₹3.3 L (11.9%)Rejected-Finance VILL P O HOJAI P S DIST HOJAI PIN 782435 | HOJAI | HOJAI | ASSAM | 782435 | ₹31.0 L+₹3.3 L (11.9%) | L3 | Rejected-Finance Refer to Financial minutes. |
| 4 | L4₹32.9 L+₹5.2 L (18.7%)Rejected-Finance | ₹32.9 L+₹5.2 L (18.7%) | L4 | Rejected-Finance Refer to Financial minutes. |
| 5 | Rejected-Technical AIR FORCE ROAD GORAIMARI PO HALESWAR PS TEZPUR DISTT SONITPUR ASSAM 784104 | SONITPUR | ASSAM | 784104 | - | - | Rejected-Technical Not Admitted. Refer to Technical minutes. |
Tender Value
₹34.7 L
EMD Value
₹69,359
Closing Date
26 Mar 2025, 6:00 pmClosed
Director of Soil Conservation
O/o The DSC, Bhumi sangrakshan bhanvan, RGB Road, Guwahati -05
Water Harvesting and Distribution Channel at Sam Bey, Borkok under RIDF-XXX
2025_SCD_43247_3
NoTender/ NIT/Pt/2024-25/4970
Open Tender
Civil Works
Item Rate
90 days
Hamren
Please refer Tender documents.
3 documents required · 3 mandatory
₹700
₹69,359
Yes
O/o The DSC
28 Jul 2025
5 Mar 2025
27 Mar 2025
6 Mar 2025
26 Mar 2025
15 Mar 2025
11 Mar 2025
Amount
Water Harvesting Structure
Clearing & grubbing road land including uprooting vegetation, grass bushed, saplings, tree etc. as per directed
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
PCC 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed , placed in foundation and compacted by vibration including curing for 14 days.
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork
Supplying of reinforcement (TMT) in position to reinforce cement concrete work as per specification etc.
Plastering with cement mortar (1:4) in sub-structure as per Technical specifications including cleaning the surface & curing etc. complete as directed.
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301
Providing and laying of filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2 of MoRTH specifications to the thickness of not less than 600mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind the abutment, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification
Earthwork by head load in filling embankment in layers not exceeding 20cm thick including breaking clods, dressing and sectioning and as per directed
Construction of diversion channel to divert the flow of water in upstream of the proposed structure
Filling in Diversion Channel
Cost of Tubewell including installation
Installation of Sign Board
Water Distribution Channel
Clearing & grubbing road land including uprooting vegetation, grass bushed, saplings, tree etc. as per directed
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Laying brick soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolliing the same with three wheel road roller 80-100 kN as per Technical Specification Clause 412
PCC 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed , placed in foundation and compacted by vibration including curing for 14 days.
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork
Supplying of reinforcement (TMT) in position to reinforce cement concrete work as per specification etc.
Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204
Plastering with cement mortar (1:4) in sub-structure as per Technical specifications including cleaning the surface & curing etc. complete as directed.
Installation of Sign Board
Earthen Bundh
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.50m , transportation to site , spreading, gradingto required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000m as per Technical specification Clause 301.5
Furnishing and laying of the live sods of perennial turf forming grass on embankment slopes or as directed
RCC Box Culvert
Site Preparation
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Laying brick soling layer on prepared sub-grade with brick on end edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolliing the same with three wheel road roller 80-100 kN as per Technical Specification Clause 412
PCC 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed , placed in foundation and compacted by vibration including curing for 14 days.
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork
Supplying of reinforcement (TMT) in position to reinforce cement concrete work as per specification etc.
Plastering with cement mortar (1:4) in sub-structure as per Technical specifications including cleaning the surface & curing etc. complete as directed.
Earthwork in filling in the guide bund by head load up to lead of 60m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10kg and falling from height of not less than 90cm and sprinkling with water if necessary. earth is to collected after removing the 1st 20cm of top soil and should be free from grass, shrubs and other foreign matter and rate will be including payment of land compensation.
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301
Installation of Sign Board
SHRI RAJESH SHUKLA (BID ID -263290)
Sri Gopal Ghosh (BID ID -262991)
J M ENTERPRISE (BID ID -263331)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .