Loading…
Loading…
Tender Value
₹139.9 Cr
EMD Value
₹2.8 Cr
Closing Date
23 Oct 2026, 5:00 pm
Yes (up to 4 members)
Yes (up to 4 members)
Two Packet System
EPC [ Single Stage ]
No
Not Applicable
Lowest to Highest
180 days
Expenditure
Capital (Works)
PROJECT
Design/Modification, Supply, Erection, Testing and Commissioning of 132kV/2X25 kV Scott connected Traction Sub Station and switching posts with AT between ET to KNW section of Bhopal Division of W C Railway to meet 3000MT loading target.
BPL-PROJECT-EPC-2026-03~WCR
BPL-PROJECT-EPC-2026-03
Open
Works - General
18 Months
Jabalpur, Madhya Pradesh
₹0
₹2.8 Cr
18 Sept 2026
18 Sept 2026
9 Oct 2026
3 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 1,39,92,06,893 | ||
| — | — | — | 1,39,92,06,893 | ||
| Erection, Bhopal | Design/Modification, Supply, between ET to KNW section of | Testing and Commissioning Division of W C Railway | Sub Station and |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
ProvisionofAdditionalstoreroomibTSSSPSSP_2.pdf
ATTACHMENT
RFPforET-KNW_uptoAmendmentNo_2_18092026.pdf
ATTACHMENT
EPCagreementETKNWwithoutscheduleG118092026.pdf
ATTACHMENT
GPSDETKNWPSI2x25kV.pdf
ATTACHMENT
2026-07-22-TI-SPC-PSI-AUTOTR-1200withAandCSlipNo01to031_compressed1.pdf
ATTACHMENT
TI_SPC_PSI_TRNPWR_5200_with_A__C_Slip_No_04_compressed.pdf
ATTACHMENT
8-12.3MVAAutoTR.pdf
ATTACHMENT
batteryspecification.pdf
ATTACHMENT
finalearthingspecificationof25kVand2x25kVsystem.pdf
ATTACHMENT
OHEguideline.pdf
ATTACHMENT
RDSOcrossapprovalprocedureTIIN044.pdf
ATTACHMENT
Revised160kmphPSIguidelines.pdf
ATTACHMENT
SeriesreactorandshuntcapacitorbankRDSOspecification.pdf
ATTACHMENT
spsspbuildings.pdf
ATTACHMENT
SpcTI-SPC-PSI-PROTCT-7101CRpanel.pdf
ATTACHMENT
TI-SPC-PSI-40-150-CHGR-1210.pdf
ATTACHMENT
TI-SPC-PSI-200-250-CHGR-0210.pdf
ATTACHMENT
Specno-TI-SPC-PSI-LVCBIN-0121.pdf
ATTACHMENT
FinaldraftspecificationNoTI-SPC-PSI-AFL-02401.pdf
ATTACHMENT
controlroomofTSSdrawing.pdf
ATTACHMENT
outerviewofControlroombuildingofTSS.pdf
ATTACHMENT
controlroombuildingsTSSSPSSP.pdf
ATTACHMENT
b237_336controlroomSPSSP.pdf
ATTACHMENT
a227_362RelaycontrolTSSSPSSP.pdf
ATTACHMENT
33TypicallayoutofcabletrenchfoundationcablescheduleofSwitchingstation2x25kVATSystemforfourlinesection..pdf Typicallayoutofcabletrench
ATTACHMENT
CablerootplanOFCETKNWsectionpart2.pdf
ATTACHMENT
33TypicallayoutofcabletrenchfoundationcablescheduleofSwitchingstation2x25kVATSystemforfourlinesection..pdf
ATTACHMENT
CablerootplanOFCETKNWsectionpart1.pdf
ATTACHMENT
132KV2x55KVscottTR.pdf
ATTACHMENT
132KV-25KVCT.pdf
ATTACHMENT
132KV-25KVPT.pdf
ATTACHMENT
132KV-50KV-25KVSPI-DPI-TPImannualoperated.pdf
ATTACHMENT
132KVoutdoorSF6CB_11zon_1.pdf
ATTACHMENT
GADFORSSPwithATSmall.pdf
ATTACHMENT
SectiondiagramET-KNWmerge.pdf
ATTACHMENT
ETKNWApprovedlocationplan.pdf
ATTACHMENT
Cablerootplan6QETKNWsection1Part1.pdf
ATTACHMENT
Cablerootplan6QETKNWsection1Part2.pdf
ATTACHMENT
2x252LTSSSPSSPRDSODiagrammerged.pdf
ATTACHMENT
EPCAmendmentmerged2.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .