| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.7 LAccepted-Finance | ₹26.7 L | L1 | Accepted-Finance Lowest bidder |
| 2 | L2₹28.0 LRejected-Finance | ₹28.0 L | L2 | Rejected-Finance Not lowest bidder |
| 3 | L3₹28.5 LRejected-Finance | ₹28.5 L | L3 | Rejected-Finance Not lowest bidder |
| 4 | L4₹30.0 LRejected-Finance SHOP NO 18 1ST FLOOR NORTH LAND BUILDING SECTOR NO 1 BACK SIDE OF BANK OF MAHARASHTRA INDRAYANI NAGAR BHOSARI PUNE 411039 | PUNE | MAHARASHTRA | 411039 | ₹30.0 L | L4 | Rejected-Finance Not lowest bidder |
| 5 | L5₹30.5 LRejected-Finance SR NO 281 3 7 ANAND NAGAR NEAR DHANORI JAKAT NAKA LOHEGAON PUNE 411047 | PUNE | PUNE | MAHARASHTRA | 411047 | ₹30.5 L | L5 | Rejected-Finance Not lowest bidder |
| Sl No | Description | Qty | Unit | L.K.R.TIWARI CONSTRUCTION L6 | S.R.M.K Enterprises L7 | RK ENTERPRISES L8 | VP DEVELOPERS AND CONTRACTOR L5 | ShreHari Civil Enginneering and Contractors L4 | DARSHAN ENTERPRISES L3 | M/S K.D.MATE L1 | MANIYA CONSTRUCTION CO L2 | BSK Construction L9 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00NOTE FOR ALL PAINITNG ITEMS :- The following precautionary measures shall be ensured by the contractor during execution of work :- (i) Contractor shall deposit entire quantity of materials (proprietory materials) in sealed containers required for painting works covered under subject contract in the custody of Engineer-In-Charge/ Office in charge of unit. (ii) The materials as required shall be issued to contractor by JE/ Engineer-In-Charge on daily basis and the empty containers/ bags shall be deposited in the store of Engineer -In-Charge by the contractor, for verification as per standard consumption/ coverage prescribed by the manufacturers. (iii) Before applying cement base paint/weather proof acrylic emulsion paint contractor shall use the wire brush for the removal of loose paint, dust, algae, moss and filling of crack using crack sealent and cleaning of surface by spray jet. (iv) Application of cement base paint strictly done by spray/mechanical spray machine only, otherwise 30% cost shall be reecovered from the respective item. (v) After completion of painting work contractor shall remove and clean all the droplets/stain of paint left on the floor, glasses and joinery. | ||||||||||||
| 2.00NOTE FOR PLUMBING AND SANITARY ITEMS:- (i) Contractor shall deposit entire quantity of plumbing and sanitary wares materials required / covered under subject contract in the custody of Engineer-In-Charge/ Office in charge of unit. (ii) The materials as required shall be issued to contractor by JE/ Engineer-In-Charge on daily basis. (iii) make specified in BOQ will supersede to all. | ||||||||||||
| 3.00 | Dismantling of precast interlocking tiles/ paver blocks, chequered tiles of any description thickness & size complete all as specified and as directed. | 58.7 | 10 Sqm | 160 ₹9,392 | 300 ₹17,610 | 350 ₹20,545 | 200 ₹11,740 | 60 ₹3,522 | 300 ₹17,610 | 50 ₹2,935 | 369 ₹21,660.30 | 600 ₹35,220 |
| 4.00 | Demolition of unreinforced cement concrete of any description and in any position not otherwise specifically provided for complete all as specified and as directed. (below or above GL) | 63.9 | Cum | 300 ₹19,170 | 300 ₹19,170 | 250 ₹15,975 | 150 ₹9,585 | 70 ₹4,473 | 299 ₹19,106.10 | 500 ₹31,950 | 369 ₹23,579.10 | 150 ₹9,585 |
| 5.00 | Material and labour for 25 mm thick sand filling under floors or foundations including watering and consolidation complete all as specified and as directed. | 10 | Cum | 900 ₹9,000 | 1,500 ₹15,000 | 2,200 ₹22,000 | 1,000 ₹10,000 | 1,600 ₹16,000 | 2,100 ₹21,000 | 1,000 ₹10,000 | 1,369 ₹13,690 | 250 ₹2,500 |
| 6.00 | Material and labour for 75 mm thick PCC 1:3:6 type C2 and as in Plinth protection to prevent moisture from entering in building through its base complete all as specified and as directed. | 65 | Sqm | 290 ₹18,850 | 150 ₹9,750 | 275 ₹17,875 | 230 ₹14,950 | 225 ₹14,625 | 300 ₹19,500 | 150 ₹9,750 | 369 ₹23,985 | 400 ₹26,000 |
| 7.00 | Material and labour for 75 mm thick, PCC (1:4:8) type D-2 using 40 mm graded stone aggregates as in sub base complete all as specified and as directed. | 587 | Sqm | 250 ₹1.5 L | 150 ₹88,050 | 150 ₹88,050 | 220 ₹1.3 L | 195 ₹1.1 L | 100 ₹58,700 | 200 ₹1.2 L | 136 ₹79,832 | 300 ₹1.8 L |
| 8.00 | Material and labour for providing 60 mm thick machine pressed precast concrete interlocking paver blocks of any shape and size conforming to IS-15658-2006,with grey cement and pigment, rubber moulded tiles M-35 Grade as in floors, paving, path etc.complete all as specified and as directed. | 400 | Sqm | 660 ₹2.6 L | 850 ₹3.4 L | 920 ₹3.7 L | 750 ₹3 L | 650 ₹2.6 L | 700 ₹2.8 L | 550 ₹2.2 L | 639 ₹2.6 L | 800 ₹3.2 L |
| 9.00 | Material and labour chequered cement concrete tiles rubber moulded 30cm x 30cm x 25mm thick set, jointed and pointed in near cement slurry in floors, with grey cement and pigments over and including 15 mm thick screed bedding in CM 1:6 complete all as specified and as directed. | 187 | Sqm | 660 ₹1.2 L | 750 ₹1.4 L | 820 ₹1.5 L | 660 ₹1.2 L | 650 ₹1.2 L | 600 ₹1.1 L | 800 ₹1.5 L | 396 ₹74,052 | 800 ₹1.5 L |
| 10.00 | Material and labour for PCC 1:2:4 type B0 (using 12.5mm graded crushed stone aggregate) as in copings, including weathering, slightly rounded or chamfered angles and throating, as directed as in copings, including form work complete all as specified and as directed. | 1.5 | Cum | 4,000 ₹6,000 | 8,000 ₹12,000 | 7,000 ₹10,500 | 5,000 ₹7,500 | 5,000 ₹7,500 | 2,000 ₹3,000 | 1,500 ₹2,250 | 3,696 ₹5,544 | 4,500 ₹6,750 |
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
25 Apr 2026, 6:00 pmClosed
GE CENTRAL KHADKI
GE CENTRAL KHADKI RANGE HILLS ROAD KHADKI PUNE PIN-411003
COMPREHENSIVE MAINT TO EXTERNAL B/R SERVICES AT YPH, MRS AND OTHER INSTALLATIONS AT TB-II DIGHI COMPLEX, DUNKIRK LINE UNDER AGE B/R-II IN GE(C) KHADKI.
2026_MES_759159_1
8353/E8 OF 2025-2026
Open Tender
Civil Works - Others
270 days
DUNKRIK LINE area
Class D category a(i)
7 documents required · 7 mandatory
₹500
GE CENTRAL KHADKI
₹98,000
Yes
25 Jun 2026
4 Apr 2026
2 May 2026
4 Apr 2026
25 Apr 2026
18 Apr 2026
4 Apr 2026 - 11 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Dismantling of precast interlocking tiles/ paver blocks, chequered tiles of any description thickness & size complete all as specified and as directed. | - | 10 Sqm | - | - | |
Demolition of unreinforced cement concrete of any description and in any position not otherwise specifically provided for complete all as specified and as directed. (below or above GL) | - | Cum | - | - | |
Material and labour for 25 mm thick sand filling under floors or foundations including watering and consolidation complete all as specified and as directed. | - | Cum | - | - | |
Material and labour for 75 mm thick PCC 1:3:6 type C2 and as in Plinth protection to prevent moisture from entering in building through its base complete all as specified and as directed. | - | Sqm | - | - | |
Material and labour for 75 mm thick, PCC (1:4:8) type D-2 using 40 mm graded stone aggregates as in sub base complete all as specified and as directed. | - | Sqm | - | - | |
Material and labour for providing 60 mm thick machine pressed precast concrete interlocking paver blocks of any shape and size conforming to IS-15658-2006,with grey cement and pigment, rubber moulded tiles M-35 Grade as in floors, paving, path etc.complete all as specified and as directed. | - | Sqm | - | - | |
Material and labour chequered cement concrete tiles rubber moulded 30cm x 30cm x 25mm thick set, jointed and pointed in near cement slurry in floors, with grey cement and pigments over and including 15 mm thick screed bedding in CM 1:6 complete all as specified and as directed. | - | Sqm | - | - | |
Material and labour for PCC 1:2:4 type B0 (using 12.5mm graded crushed stone aggregate) as in copings, including weathering, slightly rounded or chamfered angles and throating, as directed as in copings, including form work complete all as specified and as directed. | - | Cum | - | - | |
Material and labour 100mm thick PCC type B2 (1:2:4) 40 mm graded stone agg in floor finished fair, even and smooth without using extra cement.as in hardstanding complete all as specified and as directed. | - | Sqm | - | - | |
Demolition of precast concrete block /brick work walling built in cement mortar complete all as specified and as directed. | - | Cum | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
BOQ_850323.xls
BOQ • 0.35 MB
8353Tender.pdf
Tender Documents • 0.47 MB
Download all tender documents and submit your bid