Loading…
Loading…
Tender Value
₹1.9 Cr
EMD Value
₹2.4 L
Closing Date
27 Feb 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
TRACK 1
14 conditions · 2 needing a document upload
Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N or V whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. Non submission of the documents shall lead to summarily rejection of the offer.
(a)The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender. (b) (1)In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii)One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b)(2)In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfillment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract.
Defination of Similar Work :- Thermit welding of rails.
12 conditions · 2 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Indian Railways Standard General Conditions of Contract, April 2022 (IRGCC, April 2022) with correction slips issued up to date of inviting tender will be applicable for this tender.
As per Advance Correction Slip No. 5 dated 20.10.2023 "The Original Bank Guarantee should be delivered in person in this office (i.e. in Receive and Dispatch Section of DRM office, Engineering Branch, West Central Railway, Jabalpur) before closing date for submission of bids (i.e. excluding the last date of submission of bids).
Welding of 52kg/60Kg/90UTS/R-260 rails in-situ with single shot crucible fitted in connection with various track renewal works under Sr. DEN (C) section.
DRMW-JBP-18-2026
DRMW-JBP-18-2026
Open
Works - General
18 Months
Jabalpur, Madhya Pradesh
₹0
₹2.4 L
27 Feb 2026
3 Feb 2026
13 Feb 2026
8 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 71,46,515.73 | ||
| "AT welding portion for 52 Kg/ 90 (UTS) rails in situ with compressed Air petrol pre- heating 3 piece pre-fabricated mould (ZIRCON - WASHED) Manually pressed, single shot crucible fitted with Auto tapping Thimble. Note:- This work including in situ welding of 52 Kg 90 UTS rails with contractor's welding portion, including trimming, grinding, finishing etc., as per the specifications with all labour, materials, T&P, all leads, lifts transport, taxes etc., complete with latest approved by RDSO Note: (i) Cutting of rail for welding to be carried out by contractor's own abrasive rail cutting machine which should not take more then 10 minutes per cut with contractor's fuel and own tools & plants, rail cuts should be perfect & truly square. (ii) Contractor should paint joint No. on each joint with black emulsion paint on base of 2"" x 4"" and joint No. of white paint with 1 3/4 "" x 2"". Black and white paint should be at contractor's cost including welds collars up to 100 mm on either sides of weld with paint to specification no. IS-9862-1981 or bituminous emulsion to IRS-P-30 Gr. I or equivalent as accepted by the railway." | — | — | — | 3,25,512.9 | |
| "AT welding portion for 60 Kg/R-260 rails in situ with compressed Air petrol pre- heating 3 piece pre-fabricated mould (ZIRCON - WASHED) Manually pressed, single shot crucible fitted with Auto tapping Thimble. Note:- This work including in situ welding of 60 Kg R-260 rails with contractor's welding portion, including trimming, grinding, finishing etc., as per the specifications with all labour, materials, T&P, all leads, lifts transport, taxes etc., complete with latest approved by RDSO Note: (i) Cutting of rail for welding to be carried out by contractor's own abrasive rail cutting machine which should not take more then 10 minutes per cut with contractor's fuel and own tools & plants, rail cuts should be perfect & truly square. (ii) Contractor should paint joint No. on each joint with black emulsion paint on base of 2"" x 4"" and joint No. of white paint with 1 3/4 "" x 2"". Black and white paint should be at contractor's cost including welds collars up to 100 mm on either sides of weld with paint to specification no. IS-9862-1981 or bituminous emulsion to IRS-P-30 Gr. I or equivalent as accepted by the railway." | — | — | — | 48,68,204.04 | |
| "AT welding portion for jointing of 60 Kg/90UTS and 60Kg/R-260 rails in situ with compressed Air petrol pre-heating 3 piece pre-fabricated mould (ZIRCON - WASHED) Manually pressed, single shot crucible fitted with Auto tapping Thimble. Note:- This work including in situ welding for jointing of 60 Kg 90UTS and 60Kg R-260 rails with contractor's welding portion, including trimming, grinding, finishing etc., as per the specifications with all labour, materials, T&P, all leads, lifts transport, taxes etc., complete with latest approved by RDSO Note: (i) Cutting of rail for welding to be carried out by contractor's own abrasive rail cutting machine which should not take more then 10 minutes per cut with contractor's fuel and own tools & plants, rail cuts should be perfect & truly square. (ii) Contractor should paint joint No. on each joint with black emulsion paint on base of 2"" x 4"" and joint No. of white paint with 1 3/4 "" x 2"". Black and white paint should be at contractor's cost including welds collars up to 100 mm on either sides of weld with paint to specification no. IS- 9862-1981 or bituminous emulsion to IRS-P-30 Gr. I or equivalent as accepted by the railway." | — | — | — | 7,19,060.81 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Tender document
ATTACHMENT
Weldingspecification.pdf
ATTACHMENT
SpecialConditions5.pdf
ATTACHMENT
2..letterforcredit.pdf
ATTACHMENT
1..Annexure-VIB.pdf
ATTACHMENT
3..SGCCApril22ACSNo.8to10.pdf ACS 8 to 10 of IRGCC April 2022
ATTACHMENT
Tenderdocument-Welding2025_1.pdf
ATTACHMENT
3..SGCCApril22ACSNo.8to10.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .