| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.2 CrAccepted-AOC | ₹8.2 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹21.4 Cr+₹13.2 Cr (160.5%)Rejected-AOC | ₹21.4 Cr+₹13.2 Cr (160.5%) | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | S.D.DOUNDE INFRA PVT. LTD. L2 | CJ INFRA L1 |
|---|---|---|---|---|---|
| 1.00 | Cutting down trees including trunks and branches with girthsabove 30cm to 60cm and stacking the materials neatly with alllifts and lead as directed and earth filling in thedepression/pit if any. | 1 | Number | 1,200 ₹1,200 | 1,100 ₹1,100 Lowest |
| 2.00 | Cutting down trees including trunks and branches with girthsabove 30cm to 60cm and stacking the materials neatly with alllifts and lead as directed and earth filling in thedepression/pit if any. | 3,970 | Square Metre | 11 ₹43,670 | 6.5 ₹25,805 Lowest |
| 3.00 | Excavation for roadway in earth, soil of all sorts, sand, gravel orsoft murum including dressing section to therequiredgrade,camber and side slopes and conveying theexcavated materialswith all lifts and lead and spreading for embankmentor stacking as directed. By Mechanical Means. | 556.45 | Cubic Metre | 161 ₹89,588.45 | 160 ₹89,032 Lowest |
| 4.00 | Excavation for roadway in hard murum including dressingsection to the required grade, camber and side slopes and conveying the excavated materials with all lifts and lead and spreading for embankment or stacking as directed. By Mechanical Means. | 836.78 | Cubic Metre | 235 ₹1,96,643.3 | 230 ₹1,92,459.4 Lowest |
| 5.00 | Excavation for roadway in soft rock, including dressing sectionto the required grade, camber and side slopes and conveyingthe excavated materials with all lifts and lead and spreading or stacking as directed. By mechanical means | 267.91 | Cubic Metre | 260 ₹69,656.6 | 250 ₹66,977.5 Lowest |
| 6.00 | Excavation for roadway in hard rock by controlled blastingincluding dressingsection to the required grade, camber and side slopes and conveying the excavatedmaterials with all lifts and lead and spreading for embankment or stocking as directed. | 1,977.96 | Cubic Metre | 1,400 ₹27,69,144 | 1,100 ₹21,75,756 Lowest |
| 7.00 | Excavation for catch / side water gutter in all sorts of soils tothe specified section including stacking the excavated stuff in aregular bund and disposing of unsuitable or excess stuff asdirected all sorts of soils. By Mechanical Means | 226.8 | Cubic Metre | 170 ₹38,556 | 160 ₹36,288 Lowest |
| 8.00 | Excavation for catch / side water gutter in Hard murum strata tothe specified section including stacking the excavated stuff in aregular bund and disposing of unsuitable or excess stuff asdirected.By Mechanical Means | 4,410.9 | Cubic Metre | 225 ₹9,92,452.5 | 220 ₹9,70,398 Lowest |
| 9.00 | Excavation for catch / side water gutter in Soft rock strata tothe specified section including stacking the excavated stuff in aregular bund and disposing of unsuitable or excess stuff asdirected. by Mechanical Means | 108 | Cubic Metre | 280 ₹30,240 | 275 ₹29,700 Lowest |
| 10.00 | Watering & compacting of embankmentformed of materialsobtained from theroad cutting with all lifts and lead not lessthan 97% of standard Proctor density after laying them in layersof 20 cm. to 30 cm. with Power roller. | 3,604.32 | Cubic Metre | 125 ₹4,50,540 | 120 ₹4,32,518.4 Lowest |
Tender Value
₹9.5 Cr
EMD Value
₹4.8 L
Closing Date
23 Mar 2026, 4:00 pmClosed
Executive Engineer Public Works (West) Division CS
Executive Engineer Public Works (West) Division Chh.Sambhajinagar
IMPROVEMENT TO KHULTABAD MHAISMAL ROAD MDR - 23 KM 0/00 TO 11/500 TQ.KHULTABAD (KM 6/00 TO 10/500) (BALANCE WORK - ON RISK AND COST)
2026_PWR_1287381_1
E TENDER NOTICE NO 64 FOR 2025-26
Open Tender
Civil Works
Item Rate
365 days
KHULTABAD
N A
2 documents required · 2 mandatory
₹3,540
₹4.8 L
CHIEF ENGINEER P W REGION C.S.
14 Jul 2026
16 Mar 2026
24 Mar 2026
16 Mar 2026
23 Mar 2026
16 Mar 2026
16 Mar 2026 - 18 Mar 2026
18 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting down trees including trunks and branches with girthsabove 30cm to 60cm and stacking the materials neatly with alllifts and lead as directed and earth filling in thedepression/pit if any. | - | Number | - | - |
| 2 | Cutting down trees including trunks and branches with girthsabove 30cm to 60cm and stacking the materials neatly with alllifts and lead as directed and earth filling in thedepression/pit if any. | - | Square Metre | - | - |
| 3 | Excavation for roadway in earth, soil of all sorts, sand, gravel orsoft murum including dressing section to therequiredgrade,camber and side slopes and conveying theexcavated materialswith all lifts and lead and spreading for embankmentor stacking as directed. By Mechanical Means. | - | Cubic Metre | - | - |
| 4 | Excavation for roadway in hard murum including dressingsection to the required grade, camber and side slopes and conveying the excavated materials with all lifts and lead and spreading for embankment or stacking as directed. By Mechanical Means. | 1 | Cubic Metre | - | - |
| 5 | Excavation for roadway in soft rock, including dressing sectionto the required grade, camber and side slopes and conveyingthe excavated materials with all lifts and lead and spreading or stacking as directed. By mechanical means | - | Cubic Metre | - | - |
| 6 | Excavation for roadway in hard rock by controlled blastingincluding dressingsection to the required grade, camber and side slopes and conveying the excavatedmaterials with all lifts and lead and spreading for embankment or stocking as directed. | - | Cubic Metre | - | - |
| 7 | Excavation for catch / side water gutter in all sorts of soils tothe specified section including stacking the excavated stuff in aregular bund and disposing of unsuitable or excess stuff asdirected all sorts of soils. By Mechanical Means | - | Cubic Metre | - | - |
| 8 | Excavation for catch / side water gutter in Hard murum strata tothe specified section including stacking the excavated stuff in aregular bund and disposing of unsuitable or excess stuff asdirected.By Mechanical Means | 1 | Cubic Metre | - | - |
| 9 | Excavation for catch / side water gutter in Soft rock strata tothe specified section including stacking the excavated stuff in aregular bund and disposing of unsuitable or excess stuff asdirected. by Mechanical Means | - | Cubic Metre | - | - |
| 10 | Watering & compacting of embankmentformed of materialsobtained from theroad cutting with all lifts and lead not lessthan 97% of standard Proctor density after laying them in layersof 20 cm. to 30 cm. with Power roller. | - | Cubic Metre | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.07 MB
BOQ_2213649.xls
BOQ • 0.41 MB
MHAISMALROADTENDER.pdf
Tender Documents • 2.12 MB
CSD1.pdf
Other Document • 10.30 MB
1287381Lettar.pdf
PDF • 0.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .