Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.8 LAccepted-AOC | ₹43.8 L | L1 | Accepted-AOC QUOTED LOWEST |
| 2 | L2₹44.2 L+₹43,757.87 (1.00%)Rejected-Finance | ₹44.2 L+₹43,757.87 (1.00%) | L2 | Rejected-Finance QUOTED SECOND LOWEST |
| 3 | L3₹44.4 L+₹65,636.80 (1.50%)Rejected-Finance MANCYBHANIYANG P S SUKHIAPOKHARI DARJEELING | DARJEELING | DARJEELING | WEST BENGAL | ₹44.4 L+₹65,636.80 (1.50%) | L3 | Rejected-Finance QUOTED THIRD LOWEST |
Tender Value
₹43.8 L
EMD Value
₹87,516
Closing Date
16 Mar 2026, 6:55 pmClosed
EXECUTIVE ENGINEER
KURSEONG IRRIGATION DIVISION
RESTORATION OF JHORA AT RAJA HATTA, 8TH MILE BUSTY, G.P. UPPER SONADA-I IN SONADA, G.T.A
2026_GTA_1017314_8
GTA/EE/KSID/NIeT-11/2025-26
Open Tender
CIVIL WORKS
Percentage
120 days
KURSEONG
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹87,516
23 Jul 2026
2 Mar 2026
19 Mar 2026
2 Mar 2026
16 Mar 2026
2 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches,levelling, dressing and ramming the bottom, bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm. | - | Cum | 119.27 | - |
| 2 | Plum concrete work with 40% cement concrete with 30 mm down graded stone metal and 60% stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any (1:3:6) | - | Cum | 3,304 | - |
| 3 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In- Charge. | - | Sqm | 334 | - |
| 4 | Add 18% GST | - | ADD | 6,60,884 | - |
| 5 | Add 1% Cess | - | ADD | 43,324.62 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
Tendernotice_2.pdf
PDF • 0.12 MB
BOQ_2500084.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .