| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹4.5 LAccepted-Finance | ₹4.5 L | H1 | Accepted-Finance The highest Amount Quoted by F D Enterprises |
| 2 | H2₹4.3 L−₹16,805.47 (3.77%)Rejected-Finance | ₹4.3 L−₹16,805.47 (3.77%) | H2 | Rejected-Finance The highest Amount Quoted by F D Enterprises. |
| 3 | H3₹3.6 L−₹90,056.50 (20.2%)Rejected-Finance | ₹3.6 L−₹90,056.50 (20.2%) | H3 | Rejected-Finance The highest Amount Quoted by F D Enterprises |
| 4 | H4₹3.3 L−₹1.2 L (26.0%)Rejected-Finance | ₹3.3 L−₹1.2 L (26.0%) | H4 | Rejected-Finance The highest Amount Quoted by F D Enterprises |
Tender Value
₹81,495
EMD Value
₹20,000
Closing Date
8 Feb 2024, 3:00 pmClosed
Executive Engineer
Karkardooma Court Division PWD Akshar Dham Setu, Delhi-110091
Demolition of Old MS water tank platform in Kasturba Kustha Ashram Tahirpur Delhi.
2024_PWD_252787_1
91/EE/KKD Court Divn./PWD/NIT/2023-24
Open Tender
Civil Works - Buildings
Item Rate
30 days
KASTURBA KUSTHA ASHRAM
Please refer Tender documents.
12 documents required · 12 mandatory
₹0
₹20,000
8 Feb 2024
31 Jan 2024
8 Feb 2024
31 Jan 2024
8 Feb 2024
31 Jan 2024
Amount
Demolishing cement concrete manually/ by mechanical means including disposal of material to dumping ground beyond 5.00 km lead as per direction of Engineer - in - charge : Nominal concrete 1:4:8 or leaner mix (including equivalent design mix)
Dismantling steel work in built up sections in angles, tees, flats and channels, rafters, trusses including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead for all heights etc. complete as per direction of Engineer-in-charge.
Providing and erecting 2.00 metre high temporary barricading at site; each panel of size 2.50 m x2.00 m made of 40x40x6 mm angle iron or 50x50x3 mm hollow MS tube posts/horizontal members/bracings covered with 1.63 mm thick MS sheet. The sheet shall be fixed with 30x5 mm MS flat by suitable welding/riveting. The panels shall be made so that gap of 50cm above the ground is available making overall height as 2.5 m. MS channel ISLC 75 @ 5.70 kg/m, 50 cm long shall be provided at the bottom having oval shaped holes of size 50x25 mm at both ends with 50 cm long MS angle 40x40x6 mm bracing. Suitable arrangement shall be made to fix the barricading to avoid from overturning by providing 250 mm long expansion fasteners at both ends. The work shall be executed as per drawing/direction of Engineer-in-Charge which includes writing and painting, arrangement for traffic diversion such as traffic signals during construction at site for day and night, glow lamps, reflective signs, marking, flags, caution tape as directed by the Engineer-in-Charge. The barricading provided shall be retained in position at site continuously including shifting of barricading from one location to another location as many times as required during the execution of the entire work till its completion. Rate include its maintenance for damages, painting, all incidentals, labour materials, equipments and works required to execute the job. The barricading shall not be removed without prior approval of Engineer-in-Charge. (Note :- One time payment shall be made for providing barricading from start of work till completion of work including shifting. The barricading provided shall remain to be the property of the contractor on completion of the work).
Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works.
Credit and disposal of old damaged and dismantled Steel/Iron/M.S/G.I and other similar articles (The material will be the property of contractor) Note: Actual weight of the material to be measured for payment.
SONU CONSTRUCTION
Ejad Construction Co.
F D Enterprises
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .