Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹95.4 LAccepted-AOC | ₹95.4 L Quoted ₹95.5 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹95.9 L+₹37,926 (0.40%)Rejected-AOC | ₹95.9 L+₹37,926 (0.40%) | L2 | Rejected-AOC L2 bidder |
| Sl No | Description | Qty | Unit | AKSHYA SIRPAKALAI H1 | V.Anbukarasu H2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling Weathering Course and pressed tiles clearing carefully away from site etc,complete complying with standard specifications and as directed by the departmental officers.(T.N.B.P.No:16&17) | 1,580 | 1 M2 (One Square Metre) | 48 ₹75,840 | 45 ₹71,100 Lowest |
| 2.00 | Dismantling clearing carefully away from site Brick / Stone Masonry in cement mortar walls under 3m high etc,complete complying with standard specifications and as directed by the departmental officers.(T.N.B.P.No:16&17) | 5 | 1 M3 ( One Cubic Metre ) | 285 ₹1,425 | 280 ₹1,400 Lowest |
| 3.00 | Labour charges for removing the cut stone wall of required size ,numbering and stocking carefully as directedincluding scaffolding ,etc complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : 16,17 &special) | 110 | 1 M2 (One Square Metre) | 1,735 ₹1,90,850 | 1,730 ₹1,90,300 Lowest |
| 4.00 | Labour charges for refixing the cut stone ulvari of required size ,numbering and stocling carefully including scaffolding ,etc complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : Special and similar to 35) | 398 | 1 Sft ( One Square Feet ) | 325 ₹1,29,350 | 320 ₹1,27,360 Lowest |
| 5.00 | Restoration by providing herbal water wash(Combination of Venthayam powder 20%, Siyakai Powder 10%, Arapu powder 5%, Boonthi kottai powder 50%, Arugampul powder 3%, Nannari ver powder 3%, Vettiver powder 3%, Korai kizhangu powder 3%, and sembaruthi leaf powder 3% total 100%) are used for removel of lime wash on stone and oil smudge) and approrimats methodology to restore the originalities of the existing granite structure inclusive of hire charges scaffolding arrangements conveyance charges for tools & plants and machinaries to the workship spot and cleaning the site after completion of work etc complete complying with standard specification and as directed by the departmental officers. (TNBP. Specification.No : special) | 1,990 | 1 Sft ( One Square Feet ) | 4 ₹7,960 Lowest | 4 ₹7,960 Lowest |
| 6.00 | Pointing with Lime mortar 1:1.5 ( One of Lime and One and Half of M.sand ) with neat finishing including all tools and plants and labour etc for cut stone masonry.etc complete complying with standard specification and as directed by the departmental officers. (TNBP. Specification.No : 60) | 245 | 1 M2 (One Square Metre) | 280 ₹68,600 | 270 ₹66,150 Lowest |
| 7.00 | Earthwork excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting inclusive of shoring shuttering, baling out water wherever necessary, refilling the foundation with excavated earth and depositing the surplus earth within compound in places shown by the departmental officers with an initial lead of 10 metre and initial lift of 2 metre and clearing and leveling the site etc., complete complying with standard specification and as directed by the departmental officers. SS20 B.(TNBP. Specification.No : 23) | 67 | 1 M3 ( One Cubic Metre ) | 220 ₹14,740 | 215 ₹14,405 Lowest |
| 8.00 | Supplying and filling in foundation, basement, etc with filling crushed stone sand ( M.Sand) in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. (TNBP. Specification.No : 24&25 ) | 96 | 1 M3 ( One Cubic Metre ) | 1,595 ₹1,53,120 | 1,590 ₹1,52,640 Lowest |
| 9.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : 28) | 20 | 1 M3 ( One Cubic Metre ) | 5,050 ₹1,01,000 | 5,045 ₹1,00,900 Lowest |
| 10.00Brick Work in Cement Mortar 1:5 (one of Cement and Five of M.sand) using best quality of country bricks of size 8 3/4"x4 1/4"x 2 3/4" including neat finishing curing etc., complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : 31-C) | |||||
Tender Value
₹95.7 L
EMD Value
₹58,000
Closing Date
13 Mar 2025, 12:30 pmClosed
Executive Officer
Arulmigu Vedhapuriswarar Thirukoil, Thiruvathipuram, Cheyyar Taluk,Tiruvannamalai District
Repairs and Renovation of Arulmigu Vedhapuriswarar Thirukoil, Thiruvathipuram, Cheyyar Taluk of Tiruvannamalai District
2025_HRCE_526778_1
28/2024-2025
Open Tender
Civil Works
Lump-sum
Thiruvathipuram, Cheyyar Taluk
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹58,000
13 Aug 2026
21 Feb 2025
13 Mar 2025
21 Feb 2025
13 Mar 2025
21 Feb 2025
Amount
Dismantling Weathering Course and pressed tiles clearing carefully away from site etc,complete complying with standard specifications and as directed by the departmental officers.(T.N.B.P.No:16&17)
Dismantling clearing carefully away from site Brick / Stone Masonry in cement mortar walls under 3m high etc,complete complying with standard specifications and as directed by the departmental officers.(T.N.B.P.No:16&17)
Labour charges for removing the cut stone wall of required size ,numbering and stocking carefully as directedincluding scaffolding ,etc complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : 16,17 &special)
Labour charges for refixing the cut stone ulvari of required size ,numbering and stocling carefully including scaffolding ,etc complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : Special and similar to 35)
Restoration by providing herbal water wash(Combination of Venthayam powder 20%, Siyakai Powder 10%, Arapu powder 5%, Boonthi kottai powder 50%, Arugampul powder 3%, Nannari ver powder 3%, Vettiver powder 3%, Korai kizhangu powder 3%, and sembaruthi leaf powder 3% total 100%) are used for removel of lime wash on stone and oil smudge) and approrimats methodology to restore the originalities of the existing granite structure inclusive of hire charges scaffolding arrangements conveyance charges for tools & plants and machinaries to the workship spot and cleaning the site after completion of work etc complete complying with standard specification and as directed by the departmental officers. (TNBP. Specification.No : special)
Pointing with Lime mortar 1:1.5 ( One of Lime and One and Half of M.sand ) with neat finishing including all tools and plants and labour etc for cut stone masonry.etc complete complying with standard specification and as directed by the departmental officers. (TNBP. Specification.No : 60)
Earthwork excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting inclusive of shoring shuttering, baling out water wherever necessary, refilling the foundation with excavated earth and depositing the surplus earth within compound in places shown by the departmental officers with an initial lead of 10 metre and initial lift of 2 metre and clearing and leveling the site etc., complete complying with standard specification and as directed by the departmental officers. SS20 B.(TNBP. Specification.No : 23)
Supplying and filling in foundation, basement, etc with filling crushed stone sand ( M.Sand) in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. (TNBP. Specification.No : 24&25 )
Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : 28)
Brick Work in Cement Mortar 1:5 (one of Cement and Five of M.sand) using best quality of country bricks of size 8 3/4"x4 1/4"x 2 3/4" including neat finishing curing etc., complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : 31-C)
For Basement
For Super Structure (Ground Floor)
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including neat finishing curing etc. complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : 56&57)
Supplying & Paving flooring with cut stone of size 600 mm X 600 mm and another sizes suitable for site conditions with machine cut edges and not less than 100mm thick and fully dressed as directed by the departmental officers,and set in Combination morter 1:1:5 ( one of Cement ,One of lime and Five of M.sand ) and pointing withCombination morter 1:1:5 ( one of Cement ,One of lime and Five of M.sand ) including cost and conveyance of all materials etc., complete Complying with standard specifications. and directed by the departmental officers (The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.)(TNBP. Specification.No : 4&35 and special )
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.(TNBP. Specification.No : 44 )
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Lime Mortar 1:1.5 (One of Lime and One & half of M.sand)12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : 44-H)
Sub Total
V.Anbukarasu (BID ID -1262811)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .