Loading…
Loading…
Tender Value
₹1.9 Cr
EMD Value
₹1.9 L
Closing Date
12 Jun 2026, 5:30 pm7d left
Chief Construction Engineer
Office of the CCE, LSP, Laltikra, Balangir
Construction of link road connecting Kusmel South RR Colony and Kusmel North RR Colony under LSIP, Balangir.
2026_CEEBO_129849_5
3/2026-27 of CCE,LSP, Balangir
Open Tender
Civil Works - Roads
183 days
Kusmel
Tender Cost, EMD, PAN, Valid RC, Valid GSTIN, Affidavit, No Relation Certificate, undertakings and any other document as per DTCN.
3 documents required · 3 mandatory
₹10,000
₹1.9 L
Yes
Office of the CCE, LSP, Laltikra, Balangir
28 May 2026
28 May 2026
16 Jun 2026
28 May 2026
12 Jun 2026
28 May 2026
28 May 2026 - 5 Jun 2026
5 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Construction of subgrade embankment with approved material obtained from borrow pits with all lifts and leads. Transporting to site by mechanical means within a lead of 5kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & Clause 305 of MORTH Specifications for Road & Bridge works (4th Revision) including cost & conveyance of all materials, royalty of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 8,062.15 | cum | 191.5 | ₹15,43,901.72 | BI01010001010000000000000515BI0100001113 |
| 2 | Providing granular sub-base (moroom -sand admixture) in layers not eceeding 22.5 cm well watered and compaction to the required density in O.M.C with Vibrater roller including cost & conveyance of all materials, royalty of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. (Measurement to be taken on level section). | 704.72 | cum | 656.8 | ₹4,62,860.1 | BI01010001010000000000000515BI0100001114 |
| 3 | Excavation, loading, unloading and carriage by mechanical means of all kinds of soil including stoney earth, gravle, moroom etc. interspread with boulders upto 1/2 cum size with all leads lifts and delifts including dressing, levelling the bed and depositing the excavated materials away from the work site including T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 2,084.8 | Cum | 86.6 | ₹1,80,543.68 | BI01010001010000000000000515BI0100001115 |
| 4 | Filling foundation and plinth with sand of approved quality,watered and rammed including cost & conveyance of all materials, royalty of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | - | cum | 508.7 | - | BI01010001010000000000000515BI0100001116 |
| 5 | Cement Concrete M15 with 40 mm hard granite crusher broken aggregates metal per 1 cum free from weathered skin surface, dust and any other deleterious materials including rigid smooth centering machine mixing, watering, compacting with vibrators, hoisting and laying in position for a finished smooth surface and curing with all leads, lifts and delifts, hire and running charges of machineries construction including cost & conveyance of all materials, royalty of materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge.(ground floor) | 1,278.01 | cum | 4,743 | ₹60,61,601.43 | BI01010001010000000000000515BI0100001117 |
| 6 | RCC M20 with HG (CB) 20 mm size aggregates metal per 1 cum free from weathered skin surface, dust and any other deleterious materials including rigid smooth centering machine mixing, watering, compacting with vibrators, hoisting and laying in position for a finished smooth surface and curing with all leads, lifts and delifts, hire and running charges of machineries construction including cost & conveyance of all materials, royalty of materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 446.51 | cum | 5,466.7 | ₹24,40,936.22 | BI01010001010000000000000515BI0100001118 |
| 7 | Supply, fitting, fixing, straightening, bending, binding and placing in position of uncoated HYSD bar reinforcement complete including cost & conveyance of all materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 745.89 | qntl | 9,316.8 | ₹69,49,307.95 | BI01010001010000000000000515BI01000011191 |
| 8 | Rigid smooth centering and shuttering for R.C.C works including false works and dismentalling there after casting including cost, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 3,265.46 | sqm | 249.1 | ₹8,13,426.09 | BI01010001010000000000000515BI01000011192 |
| 9 | Cement concrete (1:2:4) with 12 mm hard granite crusher broken aggregates metal per 1 cum free from weathered skin surface, dust and any other deleterious materials including rigid smooth centering machine mixing, watering, compacting with vibrators, hoisting and laying in position for a finished smooth surface and curing with all leads, lifts and delifts, hire and running charges of machineries construction including cost & conveyance of all materials, royalty of materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 25.38 | Cum | 6,990.3 | ₹1,77,413.81 | BI01010001010000000000000515BI01000011193 |
| 10 | Filling bitumen and cement and juit fibre in expansion joints inclusive of cost of materials and cement mortar (3:1) including cleanong before pouring 12 mm to 25 mm and 15 cm depath including cost & conveyance of all materials, royalty of materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge | 378 | Rmt | 14.25 | ₹5,386.5 | BI01010001010000000000000515BI01000011194 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
DTCNlinkroad.pdf
Tender Documents • 2.10 MB
BOQ_592773.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid