Loading…
Loading…
Tender Value
₹3.0 L
EMD Value
₹5,960
Closing Date
30 Jul 2026, 6:55 pm4d left
Executive Engineer REW Division Poonch
Executive Engineer REW Division Poonch
Please refer to Boq
2026_RDPR_316322_10
e-NIT 14 of REW Poonch 2026-27 Date 16-07-2026
Open Tender
Civil Works
Percentage
30 days
POONCH
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Division Poonch
₹5,960
30 Jul 2026
16 Jul 2026
31 Jul 2026
16 Jul 2026
30 Jul 2026
16 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth,leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil : | - | sqm | 91.75 | - |
| 2 | Dry stone pitching including cost of stone in horizontal level | - | cum | 1,235.55 | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6graded stone aggregate 20 mm nominal size) | - | cum | 5,733.6 | - |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for:
Foundations, footings, bases for columns | 41.4 | sqm | 286.35 | ₹11,854.89 |
| 5 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete.Non-pressure NP-3 class (Medium duty) R.C.C. pipes 600 mm dia. R.C.C. pipe | 5 | Mtr. | 2,415.8 | ₹12,079 |
| 6 | Carriage of HP Pipe 600 mm dia by 150 Km. by MT | 5 | Mtr. | 673.03 | ₹3,365.15 |
| 7 | Carriage of Stone by 05 Km. by MT | 31.05 | Cum | 236.16 | ₹7,332.77 |
| 8 | Carriage of Sand/Agg. by 15 Km. by MT | 42.23 | Cum | 344.49 | ₹14,547.81 |
| 9 | Add Cost of CIB | 1 | No | 1,000 | ₹1,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.89 MB
BOQ_1031365.xls
BOQ • 0.32 MB
Extentionofdate14to16NIT.pdf
PDF • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].