| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAdmitted-Finance | ₹2.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.4 Cr+₹41.4 L (20.7%)Admitted-Finance | ₹2.4 Cr+₹41.4 L (20.7%) | L2 | Admitted-Finance |
| 3 | L3₹2.4 Cr+₹42.3 L (21.1%)Admitted-Finance AT PAHUR POST JAMGAON TEL ROHA DIST RAIGAD | ₹2.4 Cr+₹42.3 L (21.1%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | R K CHANDNANI L1 | ASHCONS INFRASTRUCTURE PVT. LTD. L3 | RENUKA CONSTRUCTION L2 |
|---|---|---|---|---|---|---|
| 1.00 | Item No.1 :-Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader/Paver on prepared surface and compacting with vibratory roller to achieve the desired density, complete as per clause401-Plant Mix Method and Grading -II Material | 79.5 | Per Cubic Meter | 1,626 ₹1,29,267 Lowest | 1,800 ₹1,43,100 | 2,980 ₹2,36,910 |
| 2.00 | Item No.2 Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen with sprayer on Dry/Hungry B.T. surface 3kg/10sqm.(VG-10 bulk bitumen rates are considered to arrive at rates) | 24,780 | Per Square Meter | 13 ₹3,22,140 Lowest | 15 ₹3,71,700 | 25 ₹6,19,500 |
| 3.00 | Item no.3 :- Proving and laying bituminous macadam using crushed aggregates of Grading 1, premixed with bituminous binder, transported to site with VTS, laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction for 80/100 mm compacted thickness with 3.3% using specified grade of Bitumen.--USING Batch mix type hot mix plant with SCADA, Sensor Paver, vibratory roller.(VG-40 bulk bitumen rates are considered to arrive at rates) | 1,239 | Per Cubic Meter | 5,300 ₹65,66,700 Lowest | 6,800 ₹84,25,200 | 6,650 ₹82,39,350 |
| 4.00 | Item No.4 :- Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen set footed in bitumen boller on B.T. surface 2.5kg/10sqm. (VG-10 bulk bitumen rates are considered to arrive at rates) | 41,265 | Per Square Meter | 11 ₹4,53,915 Lowest | 15 ₹6,18,975 | 25 ₹10,31,625 |
| 5.00 | Item No.5:-Providing and laying bituminous concrete using crushed aggregates of grading 1, premixed with bituminous binder @5.20 percent by weight of total mix and filler, transported to site with VTS, laid over apreviously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction for 50 mm compacted thickness with specified grade of Bitumen, Excluding prime/tack coat. For Bitumen of specified grade--USING Batch mix type hot mix plant with SCADA, Sensor Paver, Vibratory roller with Stone Dust filler.(VG-40 bulk bitumen rates are considered to arrive at rates) | 1,650.6 | Per Cubic Meter | 7,600 ₹1,25,44,560 Lowest | 8,900 ₹1,46,90,340 | 8,500 ₹1,40,30,100 |
Tender Value
₹2.4 Cr
EMD Value
₹4.9 L
Closing Date
12 Nov 2020, 5:30 pmClosed
Executive Engineer, NH, Pen
Executive Engineer, NH, Pen
Rehabilitation and Up-gradation to 2 lane road with paved shoulders configuration for Pacharal-MandangadlRajewadi section of NH-965DD Pot hole filling and damaged stretches maintenance work at Risk and Cost Third Time. 2nd Call
2020_MoRTH_587912_2
NIT No. 03/EENHD/PEN/2040/2020-21/
Open Tender
Civil Works - Others
Works
120 days
Pen
Tender fee Rs.2,000/- to be submitted online through the portal bharatkosh.gov.in (receipt / document in support of online payment to be submitted online on eporcure.gov.in
6 documents required · 6 mandatory
₹360
Executive Engineer
₹4.9 L
SE office, NH, Belapur
27 Nov 2020
29 Oct 2020
17 Nov 2020
29 Oct 2020
12 Nov 2020
29 Oct 2020
6 Nov 2020
Amount
Item No.1 :-Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader/Paver on prepared surface and compacting with vibratory roller to achieve the desired density, complete as per clause401-Plant Mix Method and Grading -II Material
Item No.2 Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen with sprayer on Dry/Hungry B.T. surface 3kg/10sqm.(VG-10 bulk bitumen rates are considered to arrive at rates)
Item no.3 :- Proving and laying bituminous macadam using crushed aggregates of Grading 1, premixed with bituminous binder, transported to site with VTS, laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction for 80/100 mm compacted thickness with 3.3% using specified grade of Bitumen.--USING Batch mix type hot mix plant with SCADA, Sensor Paver, vibratory roller.(VG-40 bulk bitumen rates are considered to arrive at rates)
Item No.4 :- Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen set footed in bitumen boller on B.T. surface 2.5kg/10sqm. (VG-10 bulk bitumen rates are considered to arrive at rates)
Item No.5:-Providing and laying bituminous concrete using crushed aggregates of grading 1, premixed with bituminous binder @5.20 percent by weight of total mix and filler, transported to site with VTS, laid over apreviously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction for 50 mm compacted thickness with specified grade of Bitumen, Excluding prime/tack coat. For Bitumen of specified grade--USING Batch mix type hot mix plant with SCADA, Sensor Paver, Vibratory roller with Stone Dust filler.(VG-40 bulk bitumen rates are considered to arrive at rates)
RENUKA CONSTRUCTION
ASHCONS INFRASTRUCTURE PVT. LTD.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .