| 1.00Name of the Work :1.Construction of Compound Wall at PU Ele School at Chinnathadagam H/O Chinnathadagam panchayat in Periyanaickenpalayam Block in Coimbatore Dist under MLACD Fund 2025-26 | |||||
| 2.00 | Earth work excavation for foundation in all soils and sub-including levelling the site complete complying with standard specifications and as directed . | 42.44 | Cum | 263.5 ₹11,182.94 | 270 ₹11,458.80 |
| 3.00 | Cement concrete 1:4:8 (One of cement, four of sand and eight of hard broken stone) using 40mm size hard broken stone inclusive of shoring, strutting, bailing out water, ramming, curing etc., complete in all respects as directed by the departmental officers | 5.03 | Cum | 5,615.5 ₹28,245.97 | 5,700 ₹28,671 |
| 4.00 | FLY Ash Brick work in cement mortar 1:5 (One of cement and five of sand) using Fly Ash Brick in including scaffolding, proper setting, curing, etc., complete in all respects. | 48.72 | Cum | 7,544.5 ₹3.7 L | 8,000 ₹3.9 L |
| 5.00 | Supplying and erecting centering for sides and soffits including supports for all reinforced cement concrete works all floors etc., complete as directed by the departmental officers complying with relevant standard specifications | 62.35 | Sqm | 547.5 ₹34,136.63 | 600 ₹37,410 |
| 6.00 | Supplying and erecting centering for sides and soffits including supports for all reinforced cement concrete works all floors etc., complete as directed by the departmental officers complying with relevant standard specifications | 50.23 | Sqm | 1,095 ₹55,001.85 | 1,100 ₹55,253 |
| 7.00 | Fabricating and placing the steel grills for reinforcement for all reinforced cement concrete works such as plinth beam, lintels, beams, sunshade, roof and floor slabs etc., including cost of steel and fabricating the reinforcement grills in position etc., complete in all floors (The rate to include the cost of binding wire steel also) | 1.06 | Cum | 91,969 ₹97,487.14 | 92,000 ₹97,520 |
| 8.00 | Reinforced Cement concrete 1:1½:3 (One of cement, one and a half of sand and three of hard broken granite stones ) using 20mm gauge hard broken granite stones for all reinforced cement concrete works excluding the cost and fabrication of reinforcement grills in position, shuttering, centering but including laying, vibrating, curing, finishing and providing Mild steel fan hooks in the RCC slab wherever necessary as directed by the departmental officers etc., complete in all respects | 18.13 | Cum | 9,367.5 ₹1.7 L | 9,400 ₹1.7 L |
| 9.00 | Plastering the walls with cement mortar 1:5 (One of cement and five of sand) 12mm thick including finishing smooth, scaffolding, setting, curing etc., complete as directed by the departmental officers. | 488.61 | Cum | 285.5 ₹1.4 L | 290 ₹1.4 L |
| 10.00 | Painting the walls and ceiling two coats with approved exterior emulsion paint over one coat of priming coat of emulsion including cost and conveyance of all materials to site, through scrapping of old plastered surface, preparing the surface, curing etc., complete in all respects (S.I. No. 359B) | 381.81 | Cum | 262 ₹1.0 L | 280 ₹1.1 L |
Tender Value
₹12 L
EMD Value
₹12,000
Closing Date
13 Feb 2026, 3:00 pmClosed
Block Development Officer (BP), P.N.Palayam
Block Development Office, Periyanaickenpalayam, Coimbatore
Construction of Compound Wall in PU Ele School at Chinnathadagam H.O. Chinnathadagam Panchayat under MLACDS 2025-26
2026_RDTN_652376_1
Roc No.1123/2025/A2 Dt.05.02.2026
Open Tender
Construction Works
Block Development Office, P.N.Palayam
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹12,000
31 Mar 2026
6 Feb 2026
13 Feb 2026
6 Feb 2026
13 Feb 2026
6 Feb 2026
Name of the Work :1.Construction of Compound Wall at PU Ele School at Chinnathadagam H/O Chinnathadagam panchayat in Periyanaickenpalayam Block in Coimbatore Dist under MLACD Fund 2025-26
Earth work excavation for foundation in all soils and sub-including levelling the site complete complying with standard specifications and as directed .
Cement concrete 1:4:8 (One of cement, four of sand and eight of hard broken stone) using 40mm size hard broken stone inclusive of shoring, strutting, bailing out water, ramming, curing etc., complete in all respects as directed by the departmental officers
FLY Ash Brick work in cement mortar 1:5 (One of cement and five of sand) using Fly Ash Brick in including scaffolding, proper setting, curing, etc., complete in all respects.
Supplying and erecting centering for sides and soffits including supports for all reinforced cement concrete works all floors etc., complete as directed by the departmental officers complying with relevant standard specifications
Supplying and erecting centering for sides and soffits including supports for all reinforced cement concrete works all floors etc., complete as directed by the departmental officers complying with relevant standard specifications
Fabricating and placing the steel grills for reinforcement for all reinforced cement concrete works such as plinth beam, lintels, beams, sunshade, roof and floor slabs etc., including cost of steel and fabricating the reinforcement grills in position etc., complete in all floors (The rate to include the cost of binding wire steel also)
Reinforced Cement concrete 1:1½:3 (One of cement, one and a half of sand and three of hard broken granite stones ) using 20mm gauge hard broken granite stones for all reinforced cement concrete works excluding the cost and fabrication of reinforcement grills in position, shuttering, centering but including laying, vibrating, curing, finishing and providing Mild steel fan hooks in the RCC slab wherever necessary as directed by the departmental officers etc., complete in all respects
Plastering the walls with cement mortar 1:5 (One of cement and five of sand) 12mm thick including finishing smooth, scaffolding, setting, curing etc., complete as directed by the departmental officers.
Painting the walls and ceiling two coats with approved exterior emulsion paint over one coat of priming coat of emulsion including cost and conveyance of all materials to site, through scrapping of old plastered surface, preparing the surface, curing etc., complete in all respects (S.I. No. 359B)
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_782280.xls
BOQ • 0.24 MB
BHCitech.pdf
Tender Documents • 0.54 MB
BHCprice.pdf
Tender Documents • 0.92 MB
Download all tender documents and submit your bid