| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.9 LAccepted-AOC | ₹11.9 L Quoted ₹13.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹15.0 LRejected-AOC | ₹15.0 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Malavika Enterprises | M/s Xavier Engineering Enterprises |
|---|---|---|---|---|---|
| 1.00 | Dismantling the existing RCC for the required width & depth as per the instructions of engineer in charge and disposing the debris 1 Km. away from the site including cost of labours, lead, lift, etc. complete. | 10.24 | M3 | 57,651.2 ₹68,028.42 | 62,668.8 ₹73,949.18 |
| 2.00 | Dismantling the existing damaged doors including removal of frames, hinges & fastenings, including cost of labours, lead, lift, devolution to stores, etc. complete. | 6.64 | M2 | 1,314.72 ₹1,551.37 | 1,434.24 ₹1,692.40 |
| 3.00 | Clean removal of cement plaster from walls and providing plastering with C.M 1:5, 12 mm thick including cost of all materials, labours, lead, lift, curing, etc. complete. | 99.5 | M2 | 35,422 ₹41,797.96 | 38,506.5 ₹45,437.67 |
| 4.00 | Providing shuttering arrangements for placing concrete using steel members and wooden props including cost of all materials, lead, lift, etc, complete. | 64 | M2 | 40,192 ₹47,426.56 | 43,712 ₹51,580.16 |
| 5.00 | Supplying fabricating and fixing in position of RTS rod for reinforcement including cutting bending tying and fixing in position including cost of all materials, labour, binding wire, lead, lift etc., complete. | 2,048 | Kg | 2,21,184 ₹2.6 L | 2,39,616 ₹2.8 L |
| 6.00 | Providing RCC 1:1.5:3 using OP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work. | 25.6 | M3 | 2,93,043.2 ₹3.5 L | 3,18,540.8 ₹3.8 L |
| 7.00 | Providing and fixing steel door of required size with single leaf, frame using 30x30x5mm M.S.angle shutters with 30x20x3mm M.S.angle and flat 4x5mm for door sfiffner center portion 20x5mm for shutter stiffner horizontal and 16x5mm for door stiffner outer vertical and horizontal with 2mm thick M.S.Sheet both sides made with 2 no. tower bolt, 1 no. aldrop, 2 no. handles, 3 nos. hinges with cost of all materials lead lift etc., complete including two coats of approved quantity enamel paint over the prining coat of red oxide. | 6.64 | M2 | 35,982.16 ₹42,458.95 | 39,116.24 ₹46,157.16 |
| 8.00 | Removing the spalled / distressed concrete for an average thickness of 75mm including disposal of debris with a lead of 1km and roughening the surface thoroughly with Reebaklens fosroc acid/equivalent with all lead, lift, labour etc., complete. | 21.73 | M2 | 13,450.87 ₹15,872.03 | 14,602.56 ₹17,231.02 |
| 9.00 | Supplying Cutting, bending & tying in position secondary reinforcement wherever using GI weld mesh of size 75 X 50mm 10gauge to the existing concrete surface prepared as per specification including transporting, fabricating bending & tying in position as per the engineer at site including cost of all materials labours, lead, lift, etc, complete | 108.63 | M2 | 71,369.91 ₹84,216.49 | 77,561.82 ₹91,522.95 |
| 10.00 | Gunitting the prepared concrete surface at an average thickness of 50mm in two layers of 25mm each using op/pp cement mortar (1:3) by volume as per ISI 9082/1978 using guniting equipment the mixture being ejected and shot in to the surface by means of compressed air including treating the existing concrete surface before guniting with watering and applying cement slurry including cost of all materials, labour, lead, lift, T&P, staging, transport etc. complete. | 108.63 | M2 | 4,42,558.62 ₹5.2 L | 4,81,013.64 ₹5.7 L |
Tender Value
Refer Docs
EMD Value
₹10,600
Closing Date
9 Feb 2026, 2:00 pmClosed
Chief Engineer TTPS Tuticorin
Office of the Superintending Engineer Civil TTPS
Rectification Works to the Damaged Column, Slab in Fire Hydrant Jet Monitor Platform in FOPH are
2026_EB_646627_1
CE SE C TTPS Spec.No. 372 25 26
Open Tender
Civil Works - Others
90 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,600
Yes
26 Mar 2026
23 Jan 2026
10 Feb 2026
23 Jan 2026
9 Feb 2026
23 Jan 2026
Dismantling the existing RCC for the required width & depth as per the instructions of engineer in charge and disposing the debris 1 Km. away from the site including cost of labours, lead, lift, etc. complete.
Dismantling the existing damaged doors including removal of frames, hinges & fastenings, including cost of labours, lead, lift, devolution to stores, etc. complete.
Clean removal of cement plaster from walls and providing plastering with C.M 1:5, 12 mm thick including cost of all materials, labours, lead, lift, curing, etc. complete.
Providing shuttering arrangements for placing concrete using steel members and wooden props including cost of all materials, lead, lift, etc, complete.
Supplying fabricating and fixing in position of RTS rod for reinforcement including cutting bending tying and fixing in position including cost of all materials, labour, binding wire, lead, lift etc., complete.
Providing RCC 1:1.5:3 using OP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work.
Providing and fixing steel door of required size with single leaf, frame using 30x30x5mm M.S.angle shutters with 30x20x3mm M.S.angle and flat 4x5mm for door sfiffner center portion 20x5mm for shutter stiffner horizontal and 16x5mm for door stiffner outer vertical and horizontal with 2mm thick M.S.Sheet both sides made with 2 no. tower bolt, 1 no. aldrop, 2 no. handles, 3 nos. hinges with cost of all materials lead lift etc., complete including two coats of approved quantity enamel paint over the prining coat of red oxide.
Removing the spalled / distressed concrete for an average thickness of 75mm including disposal of debris with a lead of 1km and roughening the surface thoroughly with Reebaklens fosroc acid/equivalent with all lead, lift, labour etc., complete.
Supplying Cutting, bending & tying in position secondary reinforcement wherever using GI weld mesh of size 75 X 50mm 10gauge to the existing concrete surface prepared as per specification including transporting, fabricating bending & tying in position as per the engineer at site including cost of all materials labours, lead, lift, etc, complete
Gunitting the prepared concrete surface at an average thickness of 50mm in two layers of 25mm each using op/pp cement mortar (1:3) by volume as per ISI 9082/1978 using guniting equipment the mixture being ejected and shot in to the surface by means of compressed air including treating the existing concrete surface before guniting with watering and applying cement slurry including cost of all materials, labour, lead, lift, T&P, staging, transport etc. complete.
Providing two coats with ready mixed plastic emulsion (interior walls) of first class quality paint & approved colour over a priming coat including cost of all materials, labours, lead, lift, etc. complete.
Providing two coats with ready mixed plastic emulsion (exterior walls) of first class quality paint & approved colour over a priming coat including cost of all materials, labours, lead, lift, etc. complete.
Painting two coats with ready mixed enamel paint for the old steel surface including cost of all materials, scaffolding charges, labours, lead, lift, etc. Complete.
Providing two coats of anticorrosive black paint with one coat white cement primer to the newly plastered surface over a one coat of primer including cost of all materials, labour, lead, lift, etc., complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_775085.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid