| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC Lowest Rate |
| 2 | L2₹1.4 Cr+₹3.7 L (2.65%)Rejected-Finance NO 13 273 FIRST FLOOR MIG MARUTHAM NEW HOUSING UNIT THANJAVUR 613005 | THANJAVUR | THANJAVUR | TAMIL NADU | 613005 | ₹1.4 Cr+₹3.7 L (2.65%) | L2 | Rejected-Finance Highest Rate |
Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
17 May 2023, 3:00 pmClosed
Additional Collector (Dev)/Project Director
DRDA Office, 2nd Floor, New Collectorate, Thanjavur
Thanjavur District - Strengthening and 5 years maintenance of 2 Road works - Package No. 97 in Pattukkottai Block under MGSMT 2022-2023.
2023_RDTN_309654_1
DIPR/2142/Tender/2023
Open Tender
Civil Works - Roads
Item Rate
180 days
Pattukkottai
As per Tender document
9 documents required · 9 mandatory
₹0
₹1.4 L
14 Jul 2023
2 May 2023
17 May 2023
2 May 2023
17 May 2023
2 May 2023
Amount
Part.1. Strengthening and 5 years maintenance of Sendakkottai-Maliyakkadu link Road in Sendakottai Panchayat Km 0/0-1/590.
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201 in all etc complete.
Picking the existing BT/ Mettaled surface and sectioning upto 50 mm - 100 mm thick including all labour charges including all labour charges etc,. complete.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A.
Providing & laying gravel soling to compacted thick including cost & conveyance of gravel from approved source to work site including labour for spreading and compacting by power roller to achieve the required Proctor density at 100% compaction of optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in Subbase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WBM/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete.
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete.
BITUMINOUS CONCRETE 25 MM THICK USING CMP (Grade-II) - Providing and laying Bituminious concrete to 25 mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory / phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Supplying and fixing Kilometer Metre stones including painting and lettering as directed by the departmental officers etc., complete.
Supplying and fixing Hecta Metre stones including painting and lettering as directed by the departmental officers etc., complete.
Supplying and fixing Name board including painting and lettering as directed by the departmental officers etc., complete.
Retro-Reflectorised Traflic Signs (with definition board) Type IV - Providing and erecting of Retro-Reflectorised Cautionary, Mandatory and Informatory signs (with definition board) made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2012 and ASTMD 4956-09, specification and fixed over 2mm thick Aluminium sheet fixed over a back supporting frame of 25mmx25mmx3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm with a clear height of not less than 2. lOm from the ground level to the bottom of the sign board and 0.60m below ground level. The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrète 45cmX45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in charge. High intensity Retro - Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67-2012. The retro - reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67:2012 (as per MORT&H Specification No.801)
60 cm equilateral triangle - Cautionary sign board
Providing and laying of hot applied Thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250 gms per sq.m area, thickness of 2.5 mm is exclusive of surface apllied glass beads as per IRC : 35. The finished surface to be level , uniform and free from streaks and holes etc complete as per MORT &H specification No.803.
Construction of 1.50 m RCC slab culvert @ Chainage 1455 m.
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Culvert at Ch. 1455m
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Culvert at Ch. 1455m
Cement concrete of grade CC 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Culvert at Ch. 1455m
Cement concrete of grade CC 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Culvert at Ch. 1455m
Supply and Erecting Steel Centering including cost and conveyance to worksite and all labour charges etc., completed. (Below Basement)
Culvert at Ch. 1455m
Supply and Erecting Steel Centering including cost and conveyance to worksite and all labour charges etc., completed. (Above Basement)
Culvert at Ch. 1455m
Cement concrete of grade CC 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Culvert at Ch. 1455m
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Culvert at Ch. 1455m
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Culvert at Ch. 1455m
Providing and fixing 6mm Bitumen felt for expansion joint Between Dirtwall & Deck slab
Culvert at Ch. 1455m
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Culvert at Ch. 1455m
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Culvert at Ch. 1455m
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Culvert at Ch. 1455m
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost.
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
Part.2. Strengthening and 5 years maintenance of Maliakkadu Village road in Maliyakadu Panchayat Km 0/0-2/250.
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201 in all etc complete.
Picking the existing BT / Mettaled surface and sectioning upto 50 mm - 100 mm thick including all labour charges including all labour charges etc,. complete.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A.
Providing & laying gravel soling to compacted thick including cost & conveyance of gravel from approved source to work site including labour for spreading and compacting by power roller to achieve the required Proctor density at 100% compaction of optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in Subbase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WBM/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete.
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete.
BITUMINOUS CONCRETE 25 MM THICK USING CMP (Grade-II) - Providing and laying Bituminious concrete to 25 mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory / phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Supplying and fixing Kilometer Metre stones including painting and lettering as directed by the departmental officers etc., complete.
Supplying and fixing Hecta Metre stones including painting and lettering as directed by the departmental officers etc., complete.
Supplying and fixing Name board including painting and lettering as directed by the departmental officers etc., complete.
Retro-Reflectorised Traflic Signs (with definition board) Type IV - Providing and erecting of Retro-Reflectorised Cautionary, Mandatory and Informatory signs (with definition board) made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2012 and ASTMD 4956-09, specification and fixed over 2mm thick Aluminium sheet fixed over a back supporting frame of 25mmx25mmx3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm with a clear height of not less than 2. lOm from the ground level to the bottom of the sign board and 0.60m below ground level. The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrète 45cmX45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in charge. High intensity Retro - Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67-2012. The retro - reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67:2012 (as per MORT&H Specification No.801)
60 cm equilateral triangle - Cautionary sign board
Providing and laying of hot applied Thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250 gms per sq.m area, thickness of 2.5 mm is exclusive of surface apllied glass beads as per IRC : 35. The finished surface to be level , uniform and free from streaks and holes etc complete as per MORT &H specification No.803.
Construction of 900 mm dia Pipe culvert @ Chainage 160m.
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Pipe Culvert at Ch. 160m
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with standard specification.
Pipe Culvert at Ch. 160m
Cement concrete of grade CC 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Pipe Culvert at Ch. 160m
Cement concrete of grade CC 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Pipe Culvert at Ch. 160m
Supply and Erecting Steel Centering including cost and conveyance to worksite and all labour charges etc., completed.
Pipe Culvert at Ch. 160m
Cement concrete of grade CC 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Pipe Culvert at Ch. 160m
Supply and fixing of NP3 Class 900mm dia RCC Pipe confirming to IS 458/2003 including cost of pipe as a finished work including all other incidental charges, testing charges including loading, unloading, transport and delivery in good condition at work site etc., complete, as directed by the Departmental Officers, as per standard specifications. (SOR pg 167 - S.No 6.c)
Pipe Culvert at Ch. 160m - 900mm dia RCC Pipe
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Pipe Culvert at Ch. 160m
Construction of 900mm dia Pipe culvert @ Chainage 1734m.
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Pipe Culvert at Ch. 1734m
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with standard specification.
Pipe Culvert at Ch. 1734m
Cement concrete of grade CC 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Pipe Culvert at Ch. 1734m
Cement concrete of grade CC 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Pipe Culvert at Ch. 1734m
Supply and Erecting Steel Centering including cost and conveyance to worksite and all labour charges etc., completed.
Pipe Culvert at Ch. 1734m
Cement concrete of grade CC 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Pipe Culvert at Ch. 1734m
Supply and fixing of NP3 Class 900mm dia RCC Pipe confirming to IS 458/2003 including cost of pipe as a finished work including all other incidental charges, testing charges including loading, unloading, transport and delivery in good condition at work site etc., complete, as directed by the Departmental Officers, as per standard specifications. (SOR pg 167 - S.No 6.c)
Pipe Culvert at Ch. 1734m
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Pipe Culvert at Ch. 1734m
Construction of 900mm dia Pipe culvert @ Chainage 1972m.
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Pipe Culvert at Ch. 1972m
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with standard specification.
Pipe Culvert at Ch. 1972m
Cement concrete of grade CC 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Pipe Culvert at Ch. 1972m
Cement concrete of grade CC 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Pipe Culvert at Ch. 1972m
Supply and Erecting Steel Centering including cost and conveyance to worksite and all labour charges etc., completed.
Pipe Culvert at Ch. 1972m
Cement concrete of grade CC 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Pipe Culvert at Ch. 1972m
Supply and fixing of NP3 Class 900mm dia RCC Pipe confirming to IS 458/2003 including cost of pipe as a finished work including all other incidental charges, testing charges including loading, unloading, transport and delivery in good condition at work site etc., complete, as directed by the Departmental Officers, as per standard specifications. (SOR pg 167 - S.No 6.c)
Pipe Culvert at Ch. 1972m
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Pipe Culvert at Ch. 1972m
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost.
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}.
Durairaj Jeevagan
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .