| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAccepted-AOC SCRPI BARDHAMAN BARDHAMAN 713363 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713363 | ₹9.2 L | L1 | Accepted-AOC tcr |
| 2 | L2₹9.6 L+₹36,873.97 (4.00%)Rejected-Finance S O PO PADAVESWAR PADAVESWAR PASCHIM BARDHAMAN WEST BENGAL INDIA 713346 | PADAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | ₹9.6 L+₹36,873.97 (4.00%) | L2 | Rejected-Finance tcr |
| 3 | L3₹9.7 L+₹46,461.20 (5.04%)Rejected-Finance MADHAIPUR NATUNDANGA BURDWAN BARDHAMAN 713381 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713381 | ₹9.7 L+₹46,461.20 (5.04%) | L3 | Rejected-Finance tcr |
| Sl No | Description | Qty | Unit | PRASHANTA KABIRAJ L2 | HAREKRISHNA ENTERPRISE L1 | PRANAB KUMAR SEN L3 |
|---|---|---|---|---|---|---|
| 1.00315kVA, 3.3kV/550V FLP TSU No.1 | ||||||
| 2.00 | Collection of trolleys and lifting to surface from RVIIA
seam near bonbahal pump to workshop for loading of
TSU and its breaker | 1 | LS | 10,848.24 ₹10,848.24 | 10,431 ₹10,431 Lowest | 10,956.72 ₹10,956.72 |
| 3.00 | Dismantling of Primary breaker from TSU and loading the same on two sets of trolleys lifted from underground and transporting the same to pit top for lowering | 1 | LS | 27,872.77 ₹27,872.77 | 26,800.74 ₹26,800.74 Lowest | 28,151.49 ₹28,151.49 |
| 4.00 | Dismantling of cage and lowering of transwitch unit and its breaker from pit top to pit bottom of pit no.3 (in RVII seam) and again refitting of cage after lowering | 1 | LS | 29,495.2 ₹29,495.2 | 28,360.77 ₹28,360.77 Lowest | 29,790.15 ₹29,790.15 |
| 5.00 | Transportation of transwitch unit and its breaker i) from pit bottom of pit no 3 to 4L/4WD (in RVII seam) over track line manually . Then from 4L/4WD (in at on floor. transportation from 16L/5WD to 18L/12WD manually 9L/4WD to 16L/5WD over track line & haulage (v)and haulage (iv) then transportation from drift bottomRVII seam) to 9L/4WD (in RVII A seam)drift over track line | 1 | LS | 1,40,986.27 ₹1,40,986.27 | 1,35,563.72 ₹1,35,563.72 Lowest | 1,42,396.13 ₹1,42,396.13 |
| 6.00 | Assembling of TSU's primary breaker and placing it in position | 1 | LS | 10,848.24 ₹10,848.24 | 10,431 ₹10,431 Lowest | 10,956.72 ₹10,956.72 |
| 7.00 | 315kVA, 3.3kV/550V FLP TSU No.2 Collection of trolleys and lifting to surface from RVIIA seam near bonbahal pump to workshop for loading of TSU and its breaker | 1 | LS | 10,848.24 ₹10,848.24 | 10,431 ₹10,431 Lowest | 10,956.72 ₹10,956.72 |
| 8.00 | Dismantling of Primary breaker from TSU and loading the same on two sets of trolleys lifted from underground and transporting the same to pit top for lowering | 1 | LS | 17,024.52 ₹17,024.52 | 16,369.74 ₹16,369.74 Lowest | 17,194.77 ₹17,194.77 |
| 9.00 | Dismantling of cage and lowering of transwitch unit and its breaker from pit top to pit bottom of pit no.3 (in RVII seam) and again refitting of cage after lowering | 1 | LS | 29,495.2 ₹29,495.2 | 28,360.77 ₹28,360.77 Lowest | 29,790.15 ₹29,790.15 |
| 10.00 | Transportation of transwitch unit and its breaker i) from pit bottom of pit no 3 to 4L/4WD (in RVII seam) over track line manually . Then from 4L/4WD (in RVII seam) to 9L/4WD (in RVII A seam)drift over track line and haulage (iv) then transportation from drift bottom at 9L/4WD to 16L/5WD over track line & haulage (v) transportation from 16L/5WD to 18L/9WD manually on floor. | 1 | LS | 1,11,491.07 ₹1,11,491.07 | 1,07,202.95 ₹1,07,202.95 Lowest | 1,12,605.98 ₹1,12,605.98 |
Tender Value
₹9.2 L
EMD Value
₹11,600
Closing Date
3 Jul 2026, 4:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Installation of 3.3kV/550V UG Electrical substation at 18L/12WD for CM packages in RVIIA seam at Shyamsundarpur colliery under Bankola area.
2026_ECL_361313_1
ECL/GM/BA/E TENDER/26-27/ENM/02 Dt 23.06.2026
Open Tender
Electrical and Maintenance Works
Item Rate
45 days
Shyamsundarpur Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹11,600
10 Aug 2026
23 Jun 2026
4 Jul 2026
23 Jun 2026
3 Jul 2026
23 Jun 2026
23 Jun 2026 - 27 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 315kVA, 3.3kV/550V FLP TSU No.1 | - | - | - | - |
| 2 | Collection of trolleys and lifting to surface from RVIIA
seam near bonbahal pump to workshop for loading of
TSU and its breaker | 1 | LS | - | - |
| 3 | Dismantling of Primary breaker from TSU and loading the same on two sets of trolleys lifted from underground and transporting the same to pit top for lowering | 1 | LS | - | - |
| 4 | Dismantling of cage and lowering of transwitch unit and its breaker from pit top to pit bottom of pit no.3 (in RVII seam) and again refitting of cage after lowering | 1 | LS | - | - |
| 5 | Transportation of transwitch unit and its breaker i) from pit bottom of pit no 3 to 4L/4WD (in RVII seam) over track line manually . Then from 4L/4WD (in at on floor. transportation from 16L/5WD to 18L/12WD manually 9L/4WD to 16L/5WD over track line & haulage (v)and haulage (iv) then transportation from drift bottomRVII seam) to 9L/4WD (in RVII A seam)drift over track line | 1 | LS | - | - |
| 6 | Assembling of TSU's primary breaker and placing it in position | 1 | LS | - | - |
| 7 | 315kVA, 3.3kV/550V FLP TSU No.2 Collection of trolleys and lifting to surface from RVIIA seam near bonbahal pump to workshop for loading of TSU and its breaker | 1 | LS | - | - |
| 8 | Dismantling of Primary breaker from TSU and loading the same on two sets of trolleys lifted from underground and transporting the same to pit top for lowering | 1 | LS | - | - |
| 9 | Dismantling of cage and lowering of transwitch unit and its breaker from pit top to pit bottom of pit no.3 (in RVII seam) and again refitting of cage after lowering | 1 | LS | - | - |
| 10 | Transportation of transwitch unit and its breaker i) from pit bottom of pit no 3 to 4L/4WD (in RVII seam) over track line manually . Then from 4L/4WD (in RVII seam) to 9L/4WD (in RVII A seam)drift over track line and haulage (iv) then transportation from drift bottom at 9L/4WD to 16L/5WD over track line & haulage (v) transportation from 16L/5WD to 18L/9WD manually on floor. | 1 | LS | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.81 MB
Tendernotice_2.pdf
PDF • 1.28 MB
BOQ_374191.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .