Loading…
Loading…
Tender Value
₹1.8 L
EMD Value
₹3,520
Closing Date
28 Jul 2026, 6:00 pm2d left
Executive Engineer REW Samba
Office of The Executive Engineer REW Samba
Please Refer as per BOQ
2026_RDPR_316058_11
21 REW Samba of 2026-27, Dated 14.07.2026
Open Tender
Civil Works
Percentage
30 days
Rajpura
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer REW Samba
₹3,520
15 Jul 2026
15 Jul 2026
29 Jul 2026
15 Jul 2026
28 Jul 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m
in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed for a lead upto 1 meter from cutting edge. All kinds of soil | 1.98 | cum | 479.3 | ₹949.01 |
| 2 | Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 15.96 | cum | 276.6 | ₹4,414.54 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 5.89 | cum | 4,826.5 | ₹28,428.09 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 5.9 | cum | 5,733.6 | ₹33,828.24 |
| 5 | Supply of stone boulders for plum concrete | 1.48 | cum | 700 | ₹1,036 |
| 6 | Providing and laying Ceramic glazed floor tiles 300x300 mm (thickness to be specified by the manufacturers) of 1st quality conforming to IS:15622 of approved make, laid on 20 mm thick bed of cement mortar 1: 4( 1 cement : 4 coarse sand) including pointing the joints with white cement and matching pigment etc., complete. In all colours, shades, except White, Ivory, Fume Red Brown | 84.24 | sqm | 1,170.75 | ₹98,623.98 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for foundations, footings, bases of columns etc. for mass concrete. | 18.8 | sqm | 286.35 | ₹5,383.38 |
| 8 | Carriage of Sand within av. Lead of 3 km by M.T. | 6.64 | cum | 165.84 | ₹1,101.18 |
| 9 | Carriage of bajri/stone agg. within av. Lead of 3 km by M.T. | 10.49 | cum | 165.84 | ₹1,739.66 |
| 10 | Provision for CIB | 1 | nos | 1,000 | ₹1,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.96 MB
BOQ_1028652.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].