Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 398 CHANAKAYAPURI COLONY KAHUWA NALA AURI MORE ANPARA ANPARA SONBHADRA UTTAR PRADESH 231225 | SONBHADRA | UTTAR PRADESH | 231225 | Admitted-Finance |
Tender Value
₹5.5 L
EMD Value
₹10,000
Closing Date
9 Oct 2020, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Office of SE OandMC-III 2X250MW CTPS
Office of SE OandMC-III 2X250MW CTPS, PARICHHA JHANSI
Overhauling of station CandI System and instruments of SWAS, BTG , FO area in unit6 of 2x250MW, CTPS, Parichha
2020_RVUNL_509695_1
T07/OandMCIII/CIMDII/CTPS20-21
Open Tender
Power/Energy Projects/Products
Lump-sum
30 days
Units 6 of 2x250MW CTPS
Tender Fees, Earnest Money, PQC etc
2 documents required · 2 mandatory
₹1,000
Dy.C.A.O,A/c 2935002100017509IFSC Code PUNB0293500
₹10,000
16 Oct 2020
9 Sept 2020
10 Oct 2020
9 Sept 2020
9 Oct 2020
9 Sept 2020
9 Sept 2020 - 9 Oct 2020
120 days
Amount
(A) Over Hauling of Electrical Actuator
Safely removal of electrical actuators from vales / damper, dismantling, complete overhauling / servicing, re-assembling and re-installation of the different make and various models of electrical actuators including limit switches and motor of various services, of the actuators installed in BTG,AHP&CW pump area.(Details scope of work given in annexure-1)
(B)Overhauling & servicing C&I field instrument of BTG & FO Area.
Dismantling, cleaning, servicing, checking, testing, recalibration and re-commissioning of pressure transmitters, vacuum transmitter & flow transmitter and ensure working satisfactory.Change the transmitters (if defective)
Dismantling, cleaning, testing, recalibration and re-commissioning of pressure switch, DP switch and ensure working satisfactory. Change the switch (if defective)
Dismantling, cleaning, testing, recalibration and re-commissioning of pressure Gauges, temperature gauges, DP gauges and ensure working satisfactory.Change the pressure Gauges, temperature gauges, DP gauges (if defective)
Dismantling, cleaning, testing, recalibration and re-commissioning of Level transmitter ensure working satisfactory. Change the Level transmitter (if defective)
Disconnection from site, cleaning, testing checking, repairing & re-commissioning of thermocouple / RTD s along with their compensating cables ensure working satisfactory. Change the thermocouple / RTD s along with their compensating cables (if defective).
(C) Overhauling miscellaneous work
Replacement / Repairing of defective root / isolating valve of transmitter, gauges, presser switch, temp switch.
Cleaning, purging, repairing, and replacement of broken impulse lines
(D) Overhauling of Alarm Annunciation, HMS &VMS system
(i) Checking, cleaning & calibration of vibration probes, cables and their related panels with cards etc. change the probe/cable/cards if found defective (ii) Overhauling & servicing of hart management system & its modules cards etc. change the card or modules if found defective.
Checking, cleaning & servicing of Alarms & annunciation panel & its associated cards etc. Change the card/ bulb if defective or damaged large video screen (LVS).
(E) Overhauling of SWAS system, Gas Analyzer, & Chemical dosing system
Steam & Water analysis (SWAS) system:- 1. Disconnecting, Cleaning, Checking, Repairing, Replacement of damaged spare parts, recalibration & re-commissioning of SWAS system. 2. The firm has to call the service engineer from OEM Forbes Marshall/Yokogawa during commissioning of the system. Details of equipment as below:-
Sample cooler
Rota meter
Regulating valve/Pr. Relief valve
Solenoid valve
Flow Switch
Temperature/ pressure gauges and switches
½ “ Sample & Cooling isolating valve
2NB isolating valve
Coolant Flow Indicator
Sample Filter
3- way ball valve
S.S. Tubing, connectors, fittings & wirings etc. of Primary, Secondary rack & wet penal .
Cat ion Exchange column (Dual type)
Conductivity cell, pH electrode & DO2 Sensor
Ph/ Conductivity flow through chamber
Ph, Conductivity, DO2, Silica, Hydrazine and Phosphate Analyzer/ Transmitter
Gas Analyzer:- 1. Disconnecting, cleaning, checking, repairing, replacement, of damaged spare parts, recalibration & re commissioning.2. The firm has to call the service engineer from OEM Forbes Marshall/Yokogawa during commissioning of the system. Details of equipment as below:-
Oxygen Analyzer
Convert unit
Detector unit
Calibration unit
Sox/Nox Analyzer
Probe assembly
Power supply unit
Micro processor controller
Co Analyzer
Transmitter/receiver unit
Power supply unit
Micro processor controller
Dust Monitor
Transmitter/receiver unit
Power supply unit
Micro processor controller
Blower unit
Monitor unit
Hydrogen purity analyzer
Transmitter/receiver unit
Calibration unit
Hydrazine, Phosphate, & Ammonia Dosing system: Disconnecting, cleaning, repairing, replacement, of damaged spare parts, recalibration & re commissioning of following:
Control panel equipment & Electronics stroke control card
Temp/Pressure Gauges
Level switches
Level gauge
M/S SANJAY ELECTRONICS
M/S A.K.CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .