| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹8.6 LAccepted-Finance | L2 | Accepted-Finance This indicates possible cattle formation as per Works Department O.M Letter No.30294 dated.19.08.2026 of Chief Engineer (Buildings-II) | |
| 2 | L2₹8.6 LAccepted-Finance | L2 | Accepted-Finance This indicates possible cattle formation as per Works Department O.M Letter No.30294 dated.19.08.2026 of Chief Engineer (Buildings-II) | |
| 3 | L2₹8.6 LAccepted-Finance | L2 | Accepted-Finance This indicates possible cattle formation as per Works Department O.M Letter No.30294 dated.19.08.2026 of Chief Engineer (Buildings-II) | |
| 4 | L2₹8.6 LAccepted-Finance | L2 | Accepted-Finance This indicates possible cattle formation as per Works Department O.M Letter No.30294 dated.19.08.2026 of Chief Engineer (Buildings-II) | |
| 5 | L2₹8.6 LAccepted-Finance | L2 | Accepted-Finance This indicates possible cattle formation as per Works Department O.M Letter No.30294 dated.19.08.2026 of Chief Engineer (Buildings-II) |
Tender Value
₹8.6 L
EMD Value
₹8,700
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Divisional Officer
S.E R and B Division Koraput
Building repair work.
2026_EICCL_143152_1
SE (R and B) KPT-11/2026-27
Open Tender
Civil Works - Buildings
Percentage
30 days
Koraput
2 documents required · 2 mandatory
₹4,000
₹8,700
Yes
5 Nov 2026
10 Oct 2026
22 Oct 2026
10 Oct 2026
21 Oct 2026
10 Oct 2026
10 Oct 2026 - 21 Oct 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentalling of old lime or cement plaster from walls including stacking of raking out joints 12mm deep and removing the debris within 50m lead including cost of all labour cess and T and P required for the work etc. complete in all respect and as per direction of Engineer in charge. | 66.87 | sqm | 58.95 | ₹3,941.99 |
| 2 | Dismentalling and removing of old RCC work and removing the debries within 50m lead including cost conveyance royalty and texes of all materials with labour and T and P required for the work etc. complete as per direction of Engineer in charge. | 0.31 | cum | 877.15 | ₹271.92 |
| 3 | Dismantling brick or stone masonary in lime or cement mortar under 3 mtr height including stacking the useful materials for reuse and removing the debris within 50m lead including cost of all labour cess and T and P required for the work etc. complete in all respect and as per direction of Engineer in charge. | 1.55 | cum | 1,646.6 | ₹2,552.23 |
| 4 | Earth work in excavation of foundation of structures in all types of soil as per drawing and technical specification including setting out shoring strutting and bracing removal of stumps and other deleterious matter dressing of sides and bottom to required level and line backfilling the excavated earth to the extent required including compaction and utilising the remaining earth locally for road work including all Cost Conveyance royalties of all materials labour T and P cess and machinaries required for the work etc. complete as per direction of the Engineer In Charge. | 4.16 | cum | 311.53 | ₹1,295.96 |
| 5 | Supplying and filling in foundation and plinth with well watered and ramming complete with all leads and lifts including cost conveyance cess and royalities DMF EMF additional charges of all materials with labour and T and P required for the work complete and as per direction of Engineer in charge. | 0.4 | cum | 1,001.7 | ₹400.68 |
| 6 | Cement concrete of prop (1:4:8) using 4cm size H.G. metal of approved quality from approved quarry including hoisting lowering and laying concrete in layers watering and curing etc. complete including cost conveyance cess and royalities DMF EMF additional charges of all materials with labour and T and P required for the work complete and as per direction of Engineer in charge. | 3.27 | cum | 5,955.7 | ₹19,475.14 |
| 7 | Flyash brick masonary in C.M.(1:6) in Foundation and Plinth using 9 size flyash bricks including splays cutting circular moulding champering and corbelling watering and curing etc. complete including cost conveyance cess and royalities DMF EMF additional charges of all materials with labour and T and P required for the work complete and as per direction of Engineer in charge. | 3.76 | cum | 5,796.39 | ₹21,794.43 |
| 8 | 2.5cm (1 ) thick DPC in C. C. (1:2:4) using 12mm size H. G. chips of approved quality from approved quarry including hoisting lowering and laying concrete in layers watering and curing etc. complete including cost conveyance cess and royalities DMF EMF additional charges of all materials with labour and T and P required for the work complete and as per direction of Engineer in charge. | 2.7 | sqm | 394.5 | ₹1,065.15 |
| 9 | Flyash brick masonary in C.M.(1:6) in superstructure using 9 size flyash bricks including splays cutting circular moulding champering and corbelling watering and curing etc. complete including cost conveyance cess and royalities DMF EMF additional charges of all materials with labour and T and P required for the work complete and as per direction of Engineer in charge. | 19.38 | cum | 5,829.7 | ₹1,12,979.59 |
| 10 | 12mm thick cement plaster in C.M. (1:6) over brick work finished smooth after raking out joints including watering and curing etc. complete including cost conveyance cess and royalities DMF EMF additional charges of all materials with labour and T and P required for the work complete and as per direction of Engineer in charge. | 174.24 | sqm | 199.45 | ₹34,752.17 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
finance_613328.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.95 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.49 MB
Tendernotice_1.pdf
PDF • 1.68 MB
BOQ_613328.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .