| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹73.6 LAccepted-AOC | ₹73.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹81.4 LRejected-Finance BHADOHI | UTTAR PRADESH | 221301 | ₹81.4 L | L2 | Rejected-Finance L2 |
| 3 | L3₹1.0 CrRejected-Finance 14 15 VINAY NAGAR VIJITEM PUBLIC SCHOOL QUARSI RAMGHAT ROAD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹1.0 Cr | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical 00 AGRA AGRA UTTAR PRADESH 282001 | AGRA | UTTAR PRADESH | 282001 | - | - | Rejected-Technical work experience is not as per requirement. |
| Sl No | Description | Qty | Unit | M/S KAMLA COMNUCATION L2 | MOHD. SHOEB KHAN L1 | GOMATINETRA CONSTRUCTIONS L3 |
|---|---|---|---|---|---|---|
| 1.00 | E/W in cutting bed of canal including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge. | 2,014 | M3 | 64 ₹1.3 L | 59 ₹1.2 L | 56.75 ₹1.1 L |
| 2.00 | E/W in restoration & strengthening of bank's for making canal section in all type of soil mixed with chharry, karail, black coton soil or moorum mixed soil including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge. | 12,476 | M3 | 82 ₹10.2 L | 65 ₹8.1 L | 200.74 ₹25.0 L |
| 3.00 | Dismantling of old C.R.S masonary including stakingof boulder ,all labour T&Pas per direc.of Er-in-charge | 1.28 | M3 | 425 ₹544 | 100 ₹128 | 381.15 ₹487.87 |
| 4.00 | Earth work Excavation in foundation in all type of soils including back filling of excavated earth ,all lead and lift and T&P etc. | 1,684.85 | M3 | 105 ₹1.8 L | 89 ₹1.5 L | 94.86 ₹1.6 L |
| 5.00 | Laying .C.C.(1:3:6) in foundation including cost of material, labour, T&P etc. | 554.09 | M3 | 3,150 ₹17.5 L | 2,900 ₹16.1 L | 3,863.02 ₹21.4 L |
| 6.00 | C.R.Stone masonry in 1:3 cement Coarse sand of F.M. more then 2.0 mortar and stone boulder of size 200 X 200 X 150 mm size including cost of all material labor and T&P etc . | 1,053.32 | M3 | 3,900 ₹41.1 L | 3,700 ₹39.0 L | 4,156.83 ₹43.8 L |
| 7.00 | Providing and Laying LDPE Film 200 Micron below in C.C. including cost of all material, labour and T&P etc. for proper completion of work. | 4,760.84 | M2 | 35 ₹1.7 L | 19 ₹90,455.96 | 33.46 ₹1.6 L |
| 8.00 | Deep struck cement pointing in 1:2 cement, sand mortar on stone masonry including cost of all materials labourT&P etc. | 3,546.92 | M2 | 139 ₹4.9 L | 148 ₹5.2 L | 125.41 ₹4.4 L |
| 9.00 | Laying C.C.1:1.5:3 including cost of material, labour, T&P etc. | 13.64 | M3 | 8,200 ₹1.1 L | 7,500 ₹1.0 L | 6,631.13 ₹90,448.61 |
| 10.00 | Dry Stone pitching the approach including cost of all material, labour and T&P etc. | 30 | M3 | 2,200 ₹66,000 | 600 ₹18,000 | 1,905.75 ₹57,172.50 |
Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
18 Mar 2026, 3:00 pmClosed
SE
SE IRRIIGATION WORK CIRCLE PRAYAGRAJ
Restoration and Pucca work of Meja dy. from km 10.400 to km 13.975
2026_UPIDC_1124343_9
07/SE/2025-26
Open Tender
Civil Works
365 days
Meja Dy
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹2.4 L
Yes
SE IRRIIGATION WORK CIRCLE PRAYAGRAJ
25 May 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
12 Mar 2026
E/W in cutting bed of canal including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge.
E/W in restoration & strengthening of bank's for making canal section in all type of soil mixed with chharry, karail, black coton soil or moorum mixed soil including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge.
Dismantling of old C.R.S masonary including stakingof boulder ,all labour T&Pas per direc.of Er-in-charge
Earth work Excavation in foundation in all type of soils including back filling of excavated earth ,all lead and lift and T&P etc.
Laying .C.C.(1:3:6) in foundation including cost of material, labour, T&P etc.
C.R.Stone masonry in 1:3 cement Coarse sand of F.M. more then 2.0 mortar and stone boulder of size 200 X 200 X 150 mm size including cost of all material labor and T&P etc .
Providing and Laying LDPE Film 200 Micron below in C.C. including cost of all material, labour and T&P etc. for proper completion of work.
Deep struck cement pointing in 1:2 cement, sand mortar on stone masonry including cost of all materials labourT&P etc.
Laying C.C.1:1.5:3 including cost of material, labour, T&P etc.
Dry Stone pitching the approach including cost of all material, labour and T&P etc.
Colour washing of two coat of parapet including cost of all materials,labour and T&P etc.
Fixing wheel guard stone inclding cost of all of all materials, labours and T&P etc.
E/W in embankment for restoration of canal section in all type of soil mixed including all lead ,lift dressing , etc.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
belanDOC.pdf
Tender Documents • 2.60 MB
BOQ_2095331.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid