Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.5 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹46.9 L+₹2.4 L (5.45%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹47.0 L+₹2.5 L (5.70%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹47.6 L+₹3.1 L (6.97%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹48.1 L+₹3.6 L (8.16%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | A K DUTTA CHOWDHURY AND CO L4 | M/S AK SINGH L5 | M/S RK SAHA AND CO L7 | MS J B CONSTRUCTION AND CO L1 | RAJGURU AND COMPANY L8 | SUBHAS CONSTRUCTIONS L2 | M/S D J ENTERPRISE L6 | M/S M R CONSTRUCTION & CO L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.00NOTE:- (i) The bidders/contractors are advised to read tender document & all corrigendum / amendments and General conditions of contracts before entrying/quoting the rates. (ii) It is highlighted that the certain condition of General Condition of Contracts (IAFW-2249) has been modified as per direction of MoD i.e. inclusssion of Performance Security, deletion of Risk & Cost Provisions and increase in defect liability period all as per tender documents. The tenderers should keep in mind while quoting their offer. (iii) (Applicable for all items/parts):- The bidders/contractors are advised to refer Notes on BOQ/SCH'A' before entry/quoting the rates. | |||||||||||
| 1.00 | Demolition of brick work or stone/boulder masonry, built in cement mortar including all quions, arches, pillers etc complete all as specified and as directed. | 10 | Cum | 360 ₹3,600 | 355 ₹3,550 | 365 ₹3,650 | 350 ₹3,500 Lowest | 365 ₹3,650 | 360 ₹3,600 | 370 ₹3,700 | 360 ₹3,600 |
| 2.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified and as directed. | 80 | Sqm | 90 ₹7,200 | 85 ₹6,800 | 98 ₹7,840 | 80 ₹6,400 Lowest | 95 ₹7,600 | 90 ₹7,200 | 100 ₹8,000 | 90 ₹7,200 |
| 3.00 | Dismantling plain or corrugated steel sheeting, any gauge, thickness including Nainital or similar pattern roof covering complete all as specified and as directed. | 90 | Sqm | 30 ₹2,700 | 25 ₹2,250 | 40 ₹3,600 | 20 ₹1,800 Lowest | 45 ₹4,050 | 30 ₹2,700 | 40 ₹3,600 | 30 ₹2,700 |
| 4.00 | Dismantling Wall and ceiling boards (fibre,pulp, insulation, etc.) or insulation boards/slabs/blankets, any thickness, including cover fillets complete all as specified and as directed. | 75 | Sqm | 50 ₹3,750 | 45 ₹3,375 | 50 ₹3,750 | 40 ₹3,000 Lowest | 50 ₹3,750 | 50 ₹3,750 | 55 ₹4,125 | 50 ₹3,750 |
| 5.00 | Taking down wooden chowkats or frames with shutters with exceeding 1.50 Sqm but not exceeding 4.00 Sqm each (without taking of shutters from the frames) complete all as specified and as directed. | 2 | Each | 190 ₹380 | 187 ₹374 | 190 ₹380 | 180 ₹360 Lowest | 190 ₹380 | 190 ₹380 | 195 ₹390 | 190 ₹380 |
| 6.00 | Taking down wooden chowkats or frames with shutters with not exceeding 1.50 Sqm each (without taking of shutters from the frames) complete all as specified and as directed. | 2 | Each | 190 ₹380 | 187 ₹374 | 195 ₹390 | 180 ₹360 Lowest | 195 ₹390 | 190 ₹380 | 195 ₹390 | 190 ₹380 |
| 7.00 | Taking down cement plaster of any description built in cement mortar on brick or stone walls etc including racking out joints, hacking for Key, scrubbing down with water etc. complete all as specified and as directed. | 50 | Sqm | 90 ₹4,500 | 97 ₹4,850 | 97 ₹4,850 | 80 ₹4,000 Lowest | 97 ₹4,850 | 90 ₹4,500 | 100 ₹5,000 | 90 ₹4,500 |
| 8.00 | Demolition of cement concrete (unreinforced) in ground floors and paving not exceeding 15cm thick (below or above ground level) and removal of rubbish from the site complete all as specified and as directed. | 11.25 | Cum | 910 ₹10,237.5 | 905 ₹10,181.25 | 905 ₹10,181.25 | 900 ₹10,125 Lowest | 910 ₹10,237.5 | 910 ₹10,237.5 | 920 ₹10,350 | 910 ₹10,237.5 |
| 9.00 | Dismantling structural steel work including doors, gates but excluding framed truss etc. complete all as specified and as directed. | 2 | Qtl | 710 ₹1,420 | 710 ₹1,420 | 710 ₹1,420 | 700 ₹1,400 Lowest | 710 ₹1,420 | 710 ₹1,420 | 720 ₹1,440 | 710 ₹1,420 |
Tender Value
₹43.3 L
EMD Value
₹87,000
Closing Date
25 Sept 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GARRISON ENGINEER JORHAT
GARRISON ENGINEER JORHAT
SPECIAL REPAIR TO AMN DUMP AND BOUNDARY WALL SECURITY FENCING AND PROVN OF DRAINAGE SYSTEM AROUND OF BLDG NO P27 TO BATHING POINT AT BHALUKMARA UNDER GE JORHAT
2026_MES_784966_1
8340/GE/E8
Open Tender
Civil Works
Item Rate
180 days
GE JORHAT
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GARRISON ENGINEER JORHAT
₹87,000
Yes
26 Oct 2026
18 Aug 2026
30 Sept 2026
7 Sept 2026
25 Sept 2026
11 Sept 2026
7 Sept 2026 - 10 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of brick work or stone/boulder masonry, built in cement mortar including all quions, arches, pillers etc complete all as specified and as directed. | 10 | Cum | - | - |
| 2 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified and as directed. | 80 | Sqm | - | - |
| 3 | Dismantling plain or corrugated steel sheeting, any gauge, thickness including Nainital or similar pattern roof covering complete all as specified and as directed. | 90 | Sqm | - | - |
| 4 | Dismantling Wall and ceiling boards (fibre,pulp, insulation, etc.) or insulation boards/slabs/blankets, any thickness, including cover fillets complete all as specified and as directed. | 75 | Sqm | - | - |
| 5 | Taking down wooden chowkats or frames with shutters with exceeding 1.50 Sqm but not exceeding 4.00 Sqm each (without taking of shutters from the frames) complete all as specified and as directed. | 2 | Each | - | - |
| 6 | Taking down wooden chowkats or frames with shutters with not exceeding 1.50 Sqm each (without taking of shutters from the frames) complete all as specified and as directed. | 2 | Each | - | - |
| 7 | Taking down cement plaster of any description built in cement mortar on brick or stone walls etc including racking out joints, hacking for Key, scrubbing down with water etc. complete all as specified and as directed. | 50 | Sqm | - | - |
| 8 | Demolition of cement concrete (unreinforced) in ground floors and paving not exceeding 15cm thick (below or above ground level) and removal of rubbish from the site complete all as specified and as directed. | 11.25 | Cum | - | - |
| 9 | Dismantling structural steel work including doors, gates but excluding framed truss etc. complete all as specified and as directed. | 2 | Qtl | - | - |
| 10 | Dismantling posts or struts (wood, steel or R.C.C.) any section, including taking out embedded portion from Concrete, brick work, masonry, etc. and making good to disturbed ground as in natural ground/ concrete level complete all as specified and as directed. | 630 | RM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
1_CONTENT_TO_NOTE_8340.pdf
Tender Documents • 0.72 MB
2_General_Condition_8340.pdf
Tender Documents • 0.78 MB
3_Spl_Con_8340.pdf
Tender Documents • 0.38 MB
4_PS_8340.pdf
Tender Documents • 1.61 MB
BOQ_879583.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .