Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 12 LANDT HOUSE SHIVAJI NAGAR NORTH AMBAZARI ROAD NAGPUR MAHARASHTRA 440010 | NAGPUR | NAGPUR | MAHARASHTRA | 440010 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
16 May 2025, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Mr. JaydipPurkaystha- GM (SCM)
EIL GURUGRAM
CRACKER FURNACE PACKAGE FOR BINA PETCHEM AND REFINERY EXPANSION PROJECT(BPREP) OF M/S BHARAT PETROLEUM CORPORATION LIMITED (BPCL)
2024_EIL_839048_2
JP/B957-300-MC-T-7401/1005
Limited
Miscellaneous Works
Works
900 days
AS PER TENDER DOCUMENT
Please refer Tender documents.
11 documents required · 11 mandatory
₹0
Exempted
9 Jun 2025
8 Apr 2025
17 May 2025
8 Apr 2025
16 May 2025
17 Apr 2025
Amount
CRACKER FURNACE PACKAGE ON LUMPSUM TURNKEY BASIS WITH SINGLE POINT RESPONSIBILITY INCLUDING BUT NOT LIMITED TO THE FOLLOWING ACTIVITIES OF WORKS: FORM-SP-0 (Rev.1)
PRICE FOR CRACKER FURNACE PACKAGE ON LUMPSUM TURNKEY BASIS WITH SINGLE POINT RESPONSIBILITY INCLUDING BUT NOT LIMITED TO THE FOLLOWING ACTIVITIES OF WORKS: Residual process design including Thermal / hydraulic design, detailed engineering, preparation of Datasheets, Smart plant P&IDs (as applicable) , updating Licensor P&IDs, Structural and refractory design, specifications for procurement, GAD, & Layouts, 3D Model, Design & engineering of utility & Process Piping including flexibility analysis, engineering fabrication drawings, Procurement & Construction schemes, Electrical & Instrumentation design, static and rotary equipment design, civil foundation design etc, Statutory approval from various Statutory state & central Government bodies (if any), approval of drawings &documents from OWNER/EIL, submission of Final Technical documents, AS BUILT Documents and 3D Model, Pre-commissioning, Commissioning and Operating manuals for all units including packages as per Bidding Document requirements) Supply of all materials including - procurement , shop fabrication, refractory dryout, inspection, expediting, planning, scheduling, monitoring, transportation, all loading and unloading; payable in the Contractor’s country; insurance in Contractor’s scope; all type of freights including ocean freight / air freight and inland freight, custom clearance, all type of handling including port handling, stevedoring, handling at worksite etc. required for completing and establishing a fully functional Cracker Furnace Package as per Bidding Document requirements. Construction including loading/unloading of the materials at Contractor’s warehouse, transportation of the materials from Contractor’s workshop / Store to erection site, assembly / sub-assembly of the equipments, modularisation & erection, installation, testing, Inspection, Training, pre-commissioning / commissioning, Guarantees & PGTR, handing over to owner inlcluding all disciplines of work and supplly of material as per Tender requirements such as structural, civil, mechanical, piping, electrical, instrumentation, insulation, painting, supply of all accessories and materials for erection / testing; supply of all consumables, providing all construction plants, equipments, special tools and tackles; providing supervisory personnel, tradesman skilled / unskilled labour; insurance in Contractor’s scope; completing all works in all respects as per provisions of Bidding Document. • Completion of all works in all respects as per provisions of the Bidding Document and directions of the Engineer-in-Charge, including any other activity of work required to complete the Plant in all respects to make the Plant functional.
INDIAN CURRENCY COMPONENT (SP-0=INDIAN CURRENCY COMPONENT OF SP-1+SP-2+SP-3)
SCHEDULE OF PRICES (FORM SP-1)_Rev.1
BREAKUP OF TOTAL LUMPSUM PRICE - DETAILED DESIGN & ENGINEERING
B. NOTES:- 1. Bidder to quote Break-up of Charges for all services for Detailed Design & Detailed Engineering , as per scope defined in Technical Section of Bidding Document , included in Total Contract Price (SP-0) in this FORM SP-1. 2. Bidder to quote Charges for Detailed Design & Detailed Engineering for the respective Indian and/or Foreign currencies (i.e. USD/INR/Euro/JPY). 3. Bidder to furnish further breakup of Form SP-1 prices in Form SP-4 in terms of % of SP-1 prices in unpriced part of their Bid. 4. Foreign Currency of quote should be same as foreign currency indicated in FORM-SP-0, above. In case of discrepancy in Foreign Currency indicated in FORM-SP-0 & this FORM-SP-1 , then the Foreign Currency indicated in FORM-SP-0 shall prevail and the Foreign Currency Component quoted herein shall be converted to the respective Foreign Currency as per FORM-SP-0 ,considering foreign exchange rates mentioned in ITB as on date of Price Bid Opening, and same shall be considered for the purpose of evaluation and award.
Residual process design including Thermal / hydraulic design, detailed engineering, preparation of Datasheets, Smart plant P&IDs (as applicable) , updating Licensor P&IDs, Structural and refractory design, specifications for procurement, GAD, & Layouts, 3D Model, Design & engineering of utility & Process Piping including flexibility analysis, engineering fabrication drawings, Procurement & Construction schemes, Electrical & Instrumentation design, static and rotary equipment design, civil foundation design etc, Statutory approval from various Statutory state & central Government bodies (if any), approval of drawings &documents from OWNER/EIL, submission of Final Technical documents, AS BUILT Documents and 3D Model, Pre-commissioning, Commissioning and Operating manuals for all units including packages as per Bidding Document requirements)
INDIAN CURRENCY COMPONENT (AS BREAK-UP OF INDIAN CURRENCY COMPONENT OF FORM-SP-0)
SCHEDULE OF PRICES (FORM SP-2)_Rev.1
BREAKUP OF TOTAL LUMPSUM PRICE - SUPPLY PORTION
C. NOTES:- 1. Bidder to quote Break-up of Prices for Supply Portion included in Total Contract Price(SP-0) to be indicated in this FORM SP-2. 2. Bidder to quote prices for Supply Portion for the respective Indian and/or Foreign currencies (i.e.USD/INR/Euro/JPY). 3. Bidder to furnish further breakup of Form SP-2 prices in Form SP-5 in terms of % of SP-1 prices in unpriced part of their Bid. 4. Foreign Currency of quote should be same as foreign currency indicated in FORM-SP-0, above. In case of discrepancy in Foreign Currency indicated in FORM-SP-0 & this FORM-SP-2 , then the Foreign Currency indicated in FORM-SP-0 shall prevail and the Foreign Currency Component quoted herein shall be converted to the respective Foreign Currency as per FORM-SP-0 ,considering foreign exchange rates mentioned in ITB as on date of Price Bid Opening, and same shall be considered for the purpose of evaluation and award.
Supply of all materials including - procurement , shop fabrication, refractory dryout, inspection, expediting, planning, scheduling, monitoring, transportation, all loading and unloading; payable in the Contractor’s country; insurance in Contractor’s scope; all type of freights including ocean freight / air freight and inland freight, custom clearance, all type of handling including port handling, stevedoring, handling at worksite etc. required for completing and establishing a fully functional Cracker Furnace Package as per Bidding Document requirements
INDIAN CURRENCY COMPONENT (AS BREAK-UP OF INDIAN CURRENCY COMPONENT OF FORM-SP-0)
SCHEDULE OF PRICES (FORM SP-3)_Rev.1
BREAKUP OF TOTAL LUMPSUM PRICE -MODULARIZATION / CONSTRUCTION/INSTALLATION, START-UP, PRE-COMMISSIONING, COMMISSIONING, GUARANTEES & PGTR, TRAINING
D. NOTES:- 1. Bidder to quote Break-up of Charges for all services for Construction/Installation activities included in Total Contract Price(SP-0) to be indicated in this FORM SP-3. 2. Bidder to quote Charges for Construction/Installation activities in Indian Rupees Only (i.e. INR). 3. Bidder to furnish further breakup of Form SP-3 prices in Form SP-6 in terms of % of SP-3 prices in unpriced part of their Bid.
Construction including loading/unloading of the materials at Contractor’s warehouse, transportation of the materials from Contractor’s workshop / Store to erection site, assembly / sub-assembly of the equipments, modularisation & erection, installation, testing, Inspection, Training, pre-commissioning / commissioning, Guarantees & PGTR, handing over to owner inlcluding all disciplines of work and supplly of material as per Tender requirements such as structural, civil, mechanical, piping, electrical, instrumentation, insulation, painting, supply of all accessories and materials for erection / testing; supply of all consumables, providing all construction plants, equipments, special tools and tackles; providing supervisory personnel, tradesman skilled / unskilled labour; insurance in Contractor’s scope; completing all works in all respects as per provisions of Bidding Document.
INDIAN CURRENCY COMPONENT (AS BREAK-UP OF INDIAN CURRENCY COMPONENT OF FORM-SP-0)
SCHEDULE OF PRICES (FORM SP-7)_Rev.1
POST WARRANTY ANNUAL MAINTENANCE CONTRACT(PWAMC) [Note: Prices of PWCAMC shall not be included in prices of SP-0]
Lumpsum Annual charges for Post Warranty maintenance for LIFT as per technical portion of bidding document:
Total Lumpsum Charges for Post Warranty maintenance for LIFT for a period of 3 (Three) years as per technical portion of bidding document (Including all taxes & duties but excluding GST & GST Compensation cess).
Lumpsum Annual charges for Post Warranty maintenance for VFD of ID/FD fans as per technical portion of bidding document:
Total Lumpsum Charges for Post Warranty maintenance for VFD of ID/FD fans for a period of 5 (Five) years as per technical portion of bidding document (Including all taxes & duties but excluding GST & GST Compensation cess).
Larsen & Toubro Limited (BID ID -3203957)
US Dollar
European Euro
Japanese yen
Portion of Quoted Rate in Currency
US Dollar
US Dollar
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .