| 1 | L1₹16.1 LAdmitted-Finance 1BR COLONY POST BACHRA P S PIPARWAR DISTT CHATRA JHARKHAND | CHATRA | JHARKHAND | 825103 | L1 | Admitted-Finance | |
| 2 | Rejected-Technical AAHIYANA GARDEN PHASE 3 FLAT NO K 13 C O RAJESH KUMAR SINGH KALIKA VIHAR SRI RAM TOWER CHIRA CHAS BOKARO STEEL CITY 827013 JHARKHAND | BOKARO | JHARKHAND | 827013 | - | Rejected-Technical Technically dis qualified | |
| 3 | Rejected-Technical 268 KARGALI BAZAR BERMO BOKARO 829104 JHARKHAND | BOKARO | JHARKHAND | 829104 | - | Rejected-Technical Technically dis qualified |
| Sl No | Description | Qty | Unit | M/S SHAILESH KUMAR SINGH L1 |
|---|---|---|---|---|
| 1.00 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width of 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. : Ordinary rock. | 121.2 | cum | 400 ₹48,480 Lowest |
| 2.00 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in-charge : Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) . | 44 | cum | 1,250 ₹55,000 Lowest |
| 3.00 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable materials within 50 meters lead as per direction of Engineer-In-Charge. | 57.32 | cum | 2,250 ₹1,28,970 Lowest |
| 4.00 | Supplying and filling in plinth with Jamuna sand under floors including, watering, ramming consolidating and dressing complete. | 13.8 | cum | 2,000 ₹27,600 Lowest |
| 5.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level : 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | 18.4 | cum | 6,500 ₹1,19,600 Lowest |
| 6.00 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work upto plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 61.21 | cum | 7,500 ₹4,59,075 Lowest |
| 7.00 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. : Mild steel and medium tensile steel bars | 5,508.9 | Kgs. | 82 ₹4,51,729.8 Lowest |
| 8.00 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns etc. for mass concrete. | 38.04 | Sqm | 300 ₹11,412 Lowest |
| 9.00 | Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached plasters butteresses plinth and string courses etc. | 114.6 | sqm | 550 ₹63,030 Lowest |
| 10.00 | Centering and shuttering including strutting, propping etc. and removal of form for : Columns, pillers, piers, abutments, posts & struts. | 17.28 | sqm | 650 ₹11,232 Lowest |
Tender Value
₹17.6 L
EMD Value
₹22,000
Closing Date
4 Dec 2025, 11:00 amClosed
PE(EnM)
Office of Project Officer, AKKOCP, Sunday Bazar, Bokaro, Jharkhand-829127
Renovation of WB No.02 of JRD Siding, PF-1 of AKKOCP, BnK Area.
2025_CCL_347906_1
PE(EnM)/AKK OCP/e-tender/25-26/35
Open Tender
Miscellaneous Works
Item Rate
21 days
AKK OCP
As per NIT
2 documents required · 2 mandatory
₹22,000
7 Jan 2026
22 Nov 2025
5 Dec 2025
22 Nov 2025
4 Dec 2025
24 Nov 2025
22 Nov 2025 - 28 Nov 2025
Amount
Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width of 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. : Ordinary rock.
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in-charge : Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) .
Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable materials within 50 meters lead as per direction of Engineer-In-Charge.
Supplying and filling in plinth with Jamuna sand under floors including, watering, ramming consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level : 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size).
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work upto plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. : Mild steel and medium tensile steel bars
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns etc. for mass concrete.
Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached plasters butteresses plinth and string courses etc.
Centering and shuttering including strutting, propping etc. and removal of form for : Columns, pillers, piers, abutments, posts & struts.
Providing and fixing M.S. round holding down bolts with nuts and washer plates complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work upto plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size).
labour charge + mechanic charge for opening of weighbridge & re-fixing of same at Jarangdih siding
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Document
1.39 MB
BOQ
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .