Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹109.6 CrAccepted-AOC 4B TOWN SQUARE CHINAR PARK RAJARHAT KOLKATA 700 136 | ₹109.6 Cr | L1 | Accepted-AOC AWARDED |
| 2 | L2₹114.4 Cr+₹4.8 Cr (4.42%)Rejected-AOC BADRI RAI COMPANY ARUN KUMAR RAI DULIAJAN STATION ROAD P O DULIAJAN P S DULIAJAN DIBRUGARH PIN 786602 | DULIAJAN | DIBRUGARH | ASSAM | 786602 | ₹114.4 Cr+₹4.8 Cr (4.42%) | L2 | Rejected-AOC NOT AWARDED |
| 3 | L3₹125.7 Cr+₹16.1 Cr (14.7%)Rejected-AOC 21 JANAPATH LANE 2ND FLOOR BR ARCADE GHY 78100 | 78100 | ₹125.7 Cr+₹16.1 Cr (14.7%) | L3 | Rejected-AOC NOT AWARDED |
| 4 | L4₹133.0 Cr+₹23.4 Cr (21.4%)Rejected-AOC 14 BILASIPARA P O P S BILASIPARA DIST DHUBRI ASSAM PIN 783348 | DHUBRI | ASSAM | 783348 | ₹133.0 Cr+₹23.4 Cr (21.4%) | L4 | Rejected-AOC NOT AWARDED |
| 5 | Rejected-Technical BHASKAR NAGAR BYE LANE NO 2 GUWAHATI 21 | SOUTH SALMARA MANCACHAR | ASSAM | 783127 | - | - | Rejected-Technical Non-Responsive |
| Sl No | Description | Qty | Unit | Tribeni Constructions Limited L1 | M/S Badri Rai & Company L2 | M/s M.P. Khaitan L3 | SHREE GAUTAM CONSTRUCTION CO. LTD. L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Planning, Designing, and Construction on EPC Basis RCC framed structure building ADMINSTRATIVE BLOCK (G.F+2), with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms & IS Codes and guidelines complete in all respect.
Note :- Plinth Area shall be measured for the actual constructed. | 1,920 | Sqm | 47,000 ₹9,02,40,000 | 34,200 ₹6,56,64,000 Lowest | 40,000 ₹7,68,00,000 | 47,500 ₹9,12,00,000 |
| 2.00 | Planning, Designing, and Construction on EPC Basis RCC framed structure building ACADEMIC BLOCK (G+2), with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms & IS Codes and guidelines complete in all respect.
Note :- Plinth Area shall be measured for the actual constructed. | 6,477 | Sqm | 45,000 ₹29,14,65,000 | 34,000 ₹22,02,18,000 Lowest | 40,000 ₹25,90,80,000 | 47,500 ₹30,76,57,500 |
| 3.00 | Planning, Designing, and Construction on EPC Basis RCC framed structure building MULTIPURPOSE HALL (G), with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms & IS Codes and guidelines complete in all respect.
Note :- Plinth Area shall be measured for the actual constructed. | 600 | Sqm | 39,000 ₹2,34,00,000 | 49,000 ₹2,94,00,000 | 37,500 ₹2,25,00,000 Lowest | 47,500 ₹2,85,00,000 |
| 4.00 | Planning, Designing, and Construction on EPC Basis RCC framed structure building BOYS HOSTEL BLOCK (1 Block) - (G+2), with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms & IS Codes and guidelines complete in all respect.
Note :- Plinth Area shall be measured for the actual constructed. | 1,614 | Sqm | 38,000 ₹6,13,32,000 | 32,500 ₹5,24,55,000 Lowest | 37,500 ₹6,05,25,000 | 42,500 ₹6,85,95,000 |
| 5.00 | Planning, Designing, and Construction on EPC Basis RCC framed structure building GIRLS HOSTEL DOUBLE SEATER (1 Block) - (G+2),with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms & IS Codes and guidelines complete in all respect.
Note :- Plinth Area shall be measured for the actual constructed. | 1,614 | Sqm | 38,000 ₹6,13,32,000 | 32,500 ₹5,24,55,000 Lowest | 37,500 ₹6,05,25,000 | 42,500 ₹6,85,95,000 |
| 6.00 | Planning, Designing, and Construction on EPC Basis RCC framed structure building COMMON MESS (2 BLOCKS)_(G), with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms & IS Codes and guidelines complete in all respect.
Note :- Plinth Area shall be measured for the actual constructed. | 544 | Sqm | 38,000 ₹2,06,72,000 | 30,500 ₹1,65,92,000 Lowest | 37,500 ₹2,04,00,000 | 40,000 ₹2,17,60,000 |
| 7.00 | Planning, Designing, and Construction on EPC Basis RCC framed structure building FIELD LAB (5 BLOCKS)- (G), with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms & IS Codes and guidelines complete in all respect.
Note :- Plinth Area shall be measured for the actual constructed. | 475 | Sqm | 39,000 ₹1,85,25,000 | 31,500 ₹1,49,62,500 Lowest | 37,500 ₹1,78,12,500 | 38,000 ₹1,80,50,000 |
| 8.00 | Planning, Designing, and Construction on EPC Basis RCC framed structure building CANTEEN-(G), with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms & IS Codes and guidelines complete in all respect.
Note :- Plinth Area shall be measured for the actual constructed. | 540 | Sqm | 39,000 ₹2,10,60,000 | 30,000 ₹1,62,00,000 Lowest | 37,500 ₹2,02,50,000 | 40,000 ₹2,16,00,000 |
| 9.00 | Planning, Designing, and Construction on EPC Basis RCC framed structure building DEAN BUNGALOW (G+1), with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms & IS Codes and guidelines complete in all respect.
Note :- Plinth Area shall be measured for the actual constructed. | 320 | Sqm | 42,000 ₹1,34,40,000 | 31,000 ₹99,20,000 Lowest | 37,500 ₹1,20,00,000 | 42,500 ₹1,36,00,000 |
| 10.00 | Planning, Designing, and Construction on EPC Basis RCC framed structure building GUEST HOUSE - (G), with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms & IS Codes and guidelines complete in all respect.
Note :- Plinth Area shall be measured for the actual constructed. | 440 | Sqm | 45,000 ₹1,98,00,000 | 28,500 ₹1,25,40,000 Lowest | 37,500 ₹1,65,00,000 | 42,500 ₹1,87,00,000 |
Tender Value
₹124.6 Cr
EMD Value
₹2.5 Cr
Closing Date
9 Feb 2026, 2:00 pmClosed
CE, PWD(Bldg), Assam, Chandmari, Ghy-3
O/O The CE, PWD(Bldg), Assam, Chandmari, Ghy-3
Construction of College of Agriculture, Patharkandi, Sribhumi District, Assam
2026_PWBNH_50433_1
Tech-I(H_E)/26/2025/8 dated Guwahati the 2nd January 2026
Open Tender
Civil Works - Building
Item Rate
730 days
Patharkandi
Please refer Tender documents.
5 documents required · 5 mandatory
₹30,000
₹2.5 Cr
Yes
O/O The CE, PWD(Bldg), Assam, Chandmari, Ghy-3
30 Mar 2026
21 Jan 2026
9 Feb 2026
21 Jan 2026
9 Feb 2026
30 Jan 2026
28 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Planning, Designing, and Construction on EPC Basis RCC framed structure building ADMINSTRATIVE BLOCK (G.F+2), with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms & IS Codes and guidelines complete in all respect.
Note :- Plinth Area shall be measured for the actual constructed. | - | Sqm | - | - |
| 2 | Planning, Designing, and Construction on EPC Basis RCC framed structure building ACADEMIC BLOCK (G+2), with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms & IS Codes and guidelines complete in all respect.
Note :- Plinth Area shall be measured for the actual constructed. | - | Sqm | - | - |
| 3 | Planning, Designing, and Construction on EPC Basis RCC framed structure building MULTIPURPOSE HALL (G), with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms & IS Codes and guidelines complete in all respect.
Note :- Plinth Area shall be measured for the actual constructed. | - | Sqm | - | - |
| 4 | Planning, Designing, and Construction on EPC Basis RCC framed structure building BOYS HOSTEL BLOCK (1 Block) - (G+2), with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms & IS Codes and guidelines complete in all respect.
Note :- Plinth Area shall be measured for the actual constructed. | - | Sqm | - | - |
| 5 | Planning, Designing, and Construction on EPC Basis RCC framed structure building GIRLS HOSTEL DOUBLE SEATER (1 Block) - (G+2),with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms & IS Codes and guidelines complete in all respect.
Note :- Plinth Area shall be measured for the actual constructed. | - | Sqm | - | - |
| 6 | Planning, Designing, and Construction on EPC Basis RCC framed structure building COMMON MESS (2 BLOCKS)_(G), with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms & IS Codes and guidelines complete in all respect.
Note :- Plinth Area shall be measured for the actual constructed. | - | Sqm | - | - |
| 7 | Planning, Designing, and Construction on EPC Basis RCC framed structure building FIELD LAB (5 BLOCKS)- (G), with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms & IS Codes and guidelines complete in all respect.
Note :- Plinth Area shall be measured for the actual constructed. | - | Sqm | - | - |
| 8 | Planning, Designing, and Construction on EPC Basis RCC framed structure building CANTEEN-(G), with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms & IS Codes and guidelines complete in all respect.
Note :- Plinth Area shall be measured for the actual constructed. | - | Sqm | - | - |
| 9 | Planning, Designing, and Construction on EPC Basis RCC framed structure building DEAN BUNGALOW (G+1), with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms & IS Codes and guidelines complete in all respect.
Note :- Plinth Area shall be measured for the actual constructed. | - | Sqm | - | - |
| 10 | Planning, Designing, and Construction on EPC Basis RCC framed structure building GUEST HOUSE - (G), with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms & IS Codes and guidelines complete in all respect.
Note :- Plinth Area shall be measured for the actual constructed. | - | Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
BOQ_80295.xls
BOQ • 0.35 MB
SBD.pdf
Tender Documents • 3.80 MB
APPENDIX-IB.pdf
Additional Documents • 0.25 MB
VOLUME_I_II_III_IV.rar
Additional Documents • 18.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .