Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | -12.61% | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.1 Cr+₹3.4 L (3.11%)Admitted-Finance | -9.89% | ₹1.1 Cr+₹3.4 L (3.11%) | L2 | Admitted-Finance |
| 3 | L3₹1.2 Cr+₹8.4 L (7.60%)Admitted-Finance | -5.97% | ₹1.2 Cr+₹8.4 L (7.60%) | L3 | Admitted-Finance |
| 4 | L4₹1.2 Cr+₹10.0 L (9.04%)Admitted-Finance | -4.71% | ₹1.2 Cr+₹10.0 L (9.04%) | L4 | Admitted-Finance |
Tender Value
₹1.3 Cr
EMD Value
₹2.5 L
Closing Date
1 Jun 2026, 6:00 pmClosed
Superintending Engineer PWD Circle Sawai Madhopur
Superintending Engineer PWD Circle Sawai Madhopur
Beautification, Restoration, and Development Works of Kushal Lake, Gangapur City
2026_CEPWD_562130_4
E-NIT No. 02/2026-27 SE PWD Circle Sawai Madhopur
Open Tender
Civil Works
Percentage
180 days
Sawai Madhopur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
Egras Office ID 11247
₹2.5 L
Yes
3 Jun 2026
25 May 2026
2 Jun 2026
25 May 2026
1 Jun 2026
25 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds of soil | 1 | Cum | 175 | ₹174.83 |
| - | Filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift. | 1 | Cum | 64 | ₹63.94 |
| - | CARRIAGE OF MATERIALS:Earth, Sand, Lime, Morrum manure or sludge:For 5 Km. | 1 | Cum | 125 | ₹124.88 |
| - | Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead and including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/ vertical or curved surfaces) excluding the cost of purlins, rafters and trusses and including cutting to size and shape whenever required. 1.00 mm thick with zinc coating not less than 275 gm/m2 | - | Sqm | 904 | - |
| - | Providing and fixing steel gate, grating , and grills made of angles, tees, square bars, flats,or black pipe with holdfast and fittings complete as per design and drawing including cutting welding and fabrication with priming coat of red oxide. Extra if square,rectangular hollow tubelar sections are used or grill made by flats only | - | Kg. | 106 | - |
| - | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work | - | Sqm | 69 | - |
| - | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in: Cement Mortar 1:6 ( 1-Cement : 6-Sand). | - | Cum | 2,838 | - |
| - | Plaster on new surface on walls in cement sand mortar 1:3 including racking of joints etc. complete fine finish : 20mm thick . | - | Sqm | 211 | - |
| - | Painting exterior surface of Wall with 100% acrylic exterior paint of approved brand and manufacture to give an even shade with two or more coats including prepartion of base with sand papering, primer, putty, etc complete in all respect including scaffolding and safety provision | - | Sqm | 123 | - |
| - | Providing and fixing Granite stone slab mirror polished and machine edge cut in walls, pillars, steps, Shelves, Sills Counters, Floors etc. laid on 12mm (Av.) thick base of cement mortar 1:3 (1 cement : 3 coarse sand) jointing with white cement mortar 1:2 (1white cement : 2 marble dust) with pigment to match the shade of the marble slab including grinding, rubbing and polishing complete. | - | Sqm | 1,850 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.94 MB
Tendernotice_2.pdf
PDF • 1.40 MB
Tendernotice_3.pdf
PDF • 15.98 MB
BOQ_1000290.xls
BOQ • 0.35 MB
Componant-Kusal-Lake.pdf
Tender Documents • 0.06 MB
Rate-Analysis-Kusal-Lake.pdf
Tender Documents • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .