Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.9 LAccepted-AOC ALIGARH UTTAR PRADESH | ALIGARH | UTTAR PRADESH | 202001 | ₹44.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹45.4 LRejected-AOC ALIGARH | UTTAR PRADESH | 202001 | ₹45.4 L | L2 | Rejected-AOC L2 |
| 3 | L3₹47.1 LRejected-AOC GRAM KHAMINI POST PADAM DISTRICT FIROZABAD UTTAR PRADESH PIN 283130 | FIROZABAD | UTTAR PRADESH | 283130 | ₹47.1 L | L3 | Rejected-AOC L3 |
| 4 | L4₹51.1 LRejected-AOC | ₹51.1 L | L4 | Rejected-AOC L4 |
| 5 | Not Admitted-Fee/PreQual/Technical FLAT NO 02 KAPIL VIHAR NEAR BANAVEDI DHANA ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | DEVENDRA KUMAR SHARMA L2 | M/s VINAY KUMAR CONTRACTOR L3 | KAMLESH KUMAR CONTRACTOR L4 | S F INFRA PROJECTS L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in road diversion and making bundha U/s & down stream of site Removing after competion of work | 1,190 | M3 | 20 ₹23,800 | 18 ₹21,420 | 250 ₹3.0 L | 50 ₹59,500 |
| 2.00 | Earth work in making ramp Earth work in cutting embankment in ordinary soil ,excavation to be in form of regular pit and E/W in embankment to be in 20 cm layer including ramming and dressing the surface to the required level and slope and also including 1.50 m lift and 30 m lead | 817 | M3 | 40 ₹32,680 | 50 ₹40,850 | 180 ₹1.5 L | 100 ₹81,700 |
| 3.00 | Supply & fixing of informatory board /caution board including painting wirtting and fixing with CC 1:2:4 including all cost of material, labour and T&P etc. complete | 2 | Nos | 3,000 ₹6,000 | 5,000 ₹10,000 | 800 ₹1,600 | 3,000 ₹6,000 |
| 4.00 | Earth work in foundation in dry ordinary soil i/c lift up to 1.50m and lead up to 30.m and filling, watering and ramming etc | 1,118 | M3 | 25 ₹27,950 | 50 ₹55,900 | 426 ₹4.8 L | 50 ₹55,900 |
| 5.00 | Providing and laying Plain Cement concrete (1:2:4) in with stone ballast 20mm to 40mm granite stone grit, cement , coarse sand including cost of all material, labour and T&P etc.complete. | 77.9 | M3 | 5,500 ₹4.3 L | 6,000 ₹4.7 L | 100.76 ₹7,849.20 | 4,800 ₹3.7 L |
| 6.00 | Providing and laying RCC M15(1:2:4) with cement , coarse sand and stone grit including cost of all material, labour and T&P etc.complete. | 165 | M3 | 6,400 ₹10.6 L | 6,100 ₹10.1 L | 132.78 ₹21,908.70 | 5,900 ₹9.7 L |
| 7.00 | Ordinary centering & shuttering for CC/R.C.C. work including all cost of material, labour and T&P etc. complete | 900 | M2 | 200 ₹1.8 L | 300 ₹2.7 L | 860 ₹7.7 L | 400 ₹3.6 L |
| 8.00 | Steel Reinforcement including cutting, bending, binding, placing in position including cost of all material, labour and T&P etc.complete. | 8.5 | MT | 70,000 ₹6.0 L | 75,000 ₹6.4 L | 74,784.04 ₹6.4 L | 69,000 ₹5.9 L |
| 9.00 | Supplying and laying one layer of tarfelt or any other equivalent approved material at the junction of wall and roof or at any place as per dirction of E/I including neccessary over lap giving one coat of approved mastic paint below the tarfelt and including supply of all material, labour and T&P etc. required for proper completion of work as per direction of Engineer in charge. | 54.8 | Sqm | 100 ₹5,480 | 200 ₹10,960 | 285 ₹15,618 | 200 ₹10,960 |
| 10.00 | Supplying and Fixing 75 mm Dia PVC pipe i/c all Material Labour , T&P etc. including all cost of material, labour and T&P etc. complete | 56 | RM | 100 ₹5,600 | 100 ₹5,600 | 161 ₹9,016 | 100 ₹5,600 |
Tender Value
₹61.7 L
EMD Value
₹1.2 L
Closing Date
12 Mar 2026, 1:00 pmClosed
Suprentending Engineer
Drainage Circle Phoolbagh Kanpur
CONSTRUCTION OF NEW VRB AT KM 11.850 OF SOMNA DRAIN
2026_UPIDC_1121479_2
04/SE/2025-26
Open Tender
Civil Works
90 days
Aligarh
Please Refer Tender Document
2 documents required · 2 mandatory
₹2,354
₹1.2 L
21 Apr 2026
5 Mar 2026
12 Mar 2026
5 Mar 2026
12 Mar 2026
5 Mar 2026
Earth work in road diversion and making bundha U/s & down stream of site Removing after competion of work
Earth work in making ramp Earth work in cutting embankment in ordinary soil ,excavation to be in form of regular pit and E/W in embankment to be in 20 cm layer including ramming and dressing the surface to the required level and slope and also including 1.50 m lift and 30 m lead
Supply & fixing of informatory board /caution board including painting wirtting and fixing with CC 1:2:4 including all cost of material, labour and T&P etc. complete
Earth work in foundation in dry ordinary soil i/c lift up to 1.50m and lead up to 30.m and filling, watering and ramming etc
Providing and laying Plain Cement concrete (1:2:4) in with stone ballast 20mm to 40mm granite stone grit, cement , coarse sand including cost of all material, labour and T&P etc.complete.
Providing and laying RCC M15(1:2:4) with cement , coarse sand and stone grit including cost of all material, labour and T&P etc.complete.
Ordinary centering & shuttering for CC/R.C.C. work including all cost of material, labour and T&P etc. complete
Steel Reinforcement including cutting, bending, binding, placing in position including cost of all material, labour and T&P etc.complete.
Supplying and laying one layer of tarfelt or any other equivalent approved material at the junction of wall and roof or at any place as per dirction of E/I including neccessary over lap giving one coat of approved mastic paint below the tarfelt and including supply of all material, labour and T&P etc. required for proper completion of work as per direction of Engineer in charge.
Supplying and Fixing 75 mm Dia PVC pipe i/c all Material Labour , T&P etc. including all cost of material, labour and T&P etc. complete
Providing and laying RCC M20(1:1.5:3) with cement , coarse sand stone grit including cost of all material, labour and T&P etc.complete.
Providing and laying C.C. M25 (1:1:2) in wearing coat with cement , coarse sand , and stone grit including cost of all material, labour and T&P etc.complete.
Brick on edge soiling on Ramp
Finishing wall (two coat) with water proofing cement paint of approved make such as super snowcem, Durocem, Robine, Guttucem, Supercem quality and of required shade on undecorated wall surface over and including one coat shite cement primer to give even shade after thoroughly brushing the surface including cost of all material and labour ,T&p etc required for proper completion of work.
S/F of year mark marble plate size 300x300x25mm
Supply & Fixing of Wheel Gard size 750x200x200 mm including all cost of material, labour and T&P etc. complete
stage.html
html • 0.05 MB
techsummary_2086796.pdf
BOQ Comparative Chart
xlsx
finsummary_2086796.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.25 MB
BOQ_2086796.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid