| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 CrAdmitted-Finance | ₹4.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.3 Cr+₹5.6 L (1.33%)Admitted-Finance | ₹4.3 Cr+₹5.6 L (1.33%) | L2 | Admitted-Finance |
| 3 | L3₹4.6 Cr+₹40.1 L (9.55%)Admitted-Finance | ₹4.6 Cr+₹40.1 L (9.55%) | L3 | Admitted-Finance |
| 4 | L4₹4.7 Cr+₹48.8 L (11.6%)Admitted-Finance | ₹4.7 Cr+₹48.8 L (11.6%) | L4 | Admitted-Finance |
| 5 | L5₹4.7 Cr+₹55.0 L (13.1%)Admitted-Finance | ₹4.7 Cr+₹55.0 L (13.1%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | A L NATNOO L1 | JAGDISH CHANDER SHARMA L2 | M/S ZARGAR CONSTRUCTION CO L3 | M/s Jalbir L4 | Pardeep Kumar Sharma L5 | MOHD SALEEM L6 | deepak const corp L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- All work above plinth level upto v floor level 1:1.5:3 (1 Cement: 1.5 Coarse sand: 3 graded stone aggregate 20mm nominal size) including water charges | 965.54 | cum | - | - | - | - | - | - | - |
| 2.00 | Brick work with common burnt clay F.P.S.(non-modular) bricks of class designation 75 upto Floor Five Level including cost of curing 1:6 mix of cement Mortar including water charges | 600.58 | cum | - | - | - | - | - | - | - |
| 3.00Centering and shuttering including strutting, propping etc. and removal of form for | ||||||||||
| 4.00 | Columns, Pillars, Piers, Abutments, Posts and Struts | 1,515.52 | sqm | - | - | - | - | - | - | - |
| 5.00 | Lintels, beams, plinth beams, girders, bressumers and cantilevers. | 1,825.91 | sqm | - | - | - | - | - | - | - |
| 6.00 | Suspended floors, roofs, landings, balconies and access platform. | 4,151.69 | sqm | - | - | - | - | - | - | - |
| 7.00 | Edges of slabs and breaks in floors and walls. Under 20cms wide | 610.67 | mtr | - | - | - | - | - | - | - |
| 8.00 | Structural steel work welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 1,60,025 | Kgs | - | - | - | - | - | - | - |
| 9.00 | Providing corrugated G.S. sheet roofing including vertical/ curved surface fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G. I limpet washers or with G. I. limpet washers filled with white lead and including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/vertical or curved surface)excluding the cost of purlins, rafters and trusses and including cutting to size and shape where ever required.0.63mm thick with zinc coating not less than 275gm/m2 | 1,664.26 | Sqm | - | - | - | - | - | - | - |
| 10.00 | Providing ridges or hips of width 60cm over all width plain G.S Sheets fixed with polymer coated J or L Hooks, Bolts & nuts 8mm dia G.I limpet & bitumen washer complete.0.63 mm thick with zinc coating not less than 275gm/m2 | 274.39 | Rmt | - | - | - | - | - | - | - |
Tender Value
₹4.7 Cr
EMD Value
₹9.4 L
Closing Date
3 Mar 2020, 6:00 pmClosed
Executive Engineer
JKPHC Jammu
Construction of 25 Bedded Sub District Hospital at Atholi Paddar District Kishtwar Contract No 12
2020_DGPJK_92752_1
e-NIT No 10 of PHC JAMMU DIV 2019-20
Open Tender
Civil Works
Item Rate
90 days
Kishtwar
refer nit and SBD
3 documents required · 3 mandatory
₹3,000
Executive Engineer JKPHC Jammu
₹9.4 L
14 Mar 2020
13 Feb 2020
4 Mar 2020
14 Feb 2020
3 Mar 2020
14 Feb 2020
Amount
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- All work above plinth level upto v floor level 1:1.5:3 (1 Cement: 1.5 Coarse sand: 3 graded stone aggregate 20mm nominal size) including water charges
Brick work with common burnt clay F.P.S.(non-modular) bricks of class designation 75 upto Floor Five Level including cost of curing 1:6 mix of cement Mortar including water charges
Centering and shuttering including strutting, propping etc. and removal of form for
Columns, Pillars, Piers, Abutments, Posts and Struts
Lintels, beams, plinth beams, girders, bressumers and cantilevers.
Suspended floors, roofs, landings, balconies and access platform.
Edges of slabs and breaks in floors and walls. Under 20cms wide
Structural steel work welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Providing corrugated G.S. sheet roofing including vertical/ curved surface fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G. I limpet washers or with G. I. limpet washers filled with white lead and including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/vertical or curved surface)excluding the cost of purlins, rafters and trusses and including cutting to size and shape where ever required.0.63mm thick with zinc coating not less than 275gm/m2
Providing ridges or hips of width 60cm over all width plain G.S Sheets fixed with polymer coated J or L Hooks, Bolts & nuts 8mm dia G.I limpet & bitumen washer complete.0.63 mm thick with zinc coating not less than 275gm/m2
Providing and fixing of steel for RCC work straighting, cutting, bending and placing in position with complete job
JAGDISH CHANDER SHARMA
M/S ZARGAR CONSTRUCTION CO
M/s Jalbir
Pardeep Kumar Sharma
MOHD SALEEM
deepak const corp
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
Tendernotice_2.pdf
PDF • 1.28 MB
BOQ_174450.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .