| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50.0 CrAccepted-Finance | ₹50.0 Cr | L1 | Accepted-Finance valid to be received. |
| 2 | L2₹52.8 CrAccepted-Finance | ₹52.8 Cr | L2 | Accepted-Finance valid to be received. |
| Sl No | Description | Qty | Unit | RAJGURU CONSTRUCTION | HIRANI ENTERPRISE |
|---|---|---|---|---|---|
| 1.00Civil works | |||||
| 1.01 | 01-CIVIL WORKS
Sec.1.0 Earth work
Providing material and labour, machinery for Excavation of foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excess excavated stuff (after back filling) with in the campus for all lead, all lift/ depth including back filling foundations, the trenches, plot filling, plinth filling with excavted material (excluding hard rock and black cotton soil) anywhere from the site/ campus etc complete as directed by Engineer in charge.
- Any type of soil or rock not requiring Blasting. | 13,104 | Cum | 65,52,000 ₹65.5 L | 67,48,560 ₹67.5 L |
| 1.02 | Providing material and labour for Excavation of foundation from 1.5 mt to 3.0 mt depth including sorting out and stacking of useful materials and disposing off the excess excavated stuff (after back filling) with in the campus for all lead, all lift/ depth including back filling foundations, the trenches, plot filling, plinth filling with excavted material (excluding hard rock and black cotton soil) anywhere from the site/ campus etc complete as directed by Engineer in charge.
- Any type of soil or rock not requiring Blasting. | 9,807 | Cum | 49,03,500 ₹49.0 L | 48,05,430 ₹48.1 L |
| 1.03 | Providing material and labour for Excavation of foundation from 3.0 mt to 5.0 mt depth including sorting out and stacking of useful materials and disposing off the excess excavated stuff (after back filling) with in the campus for all lead, all lift/ depth including back filling foundations, the trenches, plot filling, plinth filling with excavted material (excluding hard rock and black cotton soil) anywhere from the site/ campus etc complete as directed by Engineer in charge.
- Any type of soil or rock not requiring Blasting. | 9,058 | Cum | 45,29,000 ₹45.3 L | 31,70,300 ₹31.7 L |
| 1.04 | Providing material and labour for Disposing off the un-used excavated earth (black cotton soil), debris, malba, dismantled materials for all lead and lift/ depth out side the campus at non objectional place as directed by Engineer in charge. | 6,219 | Cum | 6,21,900 ₹6.2 L | 7,77,375 ₹7.8 L |
| 1.05 | Providing material and labour for Filling in plinth with sand under floors or base of foundation including watering ramming, consolidating and dressing etc complete as directed by Engineer in charge. | 415 | Cum | 6,22,500 ₹6.2 L | 2,28,250 ₹2.3 L |
| 1.06 | Providing material and labour for Filling in foundation, plinth and plot filling with murrum (brought from out side) in layers of 20cm. thickness including watering, ramming and consolidating etc complete as directed by Engineer in charge. | 2,054 | Cum | 41,08,000 ₹41.1 L | 22,59,400 ₹22.6 L |
| 1.07 | Providing material and labour for injecting Chemical emulsion for PRE - CONSTRUCTIONAL anti-termite treatment and creating a chemical barrier on the top surface of plinth filling, inside junction of wall and floor, on top of damp proof course (DPC) or on masonry at level of plinth filling as per IS 6313 (Part-2)-1981 using chemical like chloropyripos emulsifiable, Biflex TC, lindane (IS 8944-1978) 20EC mixed with water in 1:19 ratio (1 liter chemical : 19 liters of water). The emulsion shall mentioned below, all as per specification and directions of Engineer-in-charge. Plinth area in plan at GF shall only be measured (for akk below specified steps) and paid. A guarantee bond of 10 years shall be furnished.
A1) Bottom surface and the sides of the excavation made for masonry foundations at the rate of 4 liters/sqm (wherever applicable)
A2) At the rate of 7.5 liter/ sqm to the backfill at the depth of 500mm below the original ground level. The soil in the immediate contact with the vertical surface of RCC column/ Masonry shall be treated.
B) Top surface of the plinth filling including damp proof courses at the rate of 5 liter/sqm of internal plinth area etc. complete.
C) At the rate of 7.5 liter/ sqm to the internal vertical surface from original Ground level to top of the earth filled in the plinth.
D) At the rate of 7.5 liter/ sqm to the external vertical surface below finished Ground level to the full depth of the filling complete.
E) 1 liter / linear meter along the junction of wall and floor at all stages. | 3,240 | Sqm | 3,24,000 ₹3.2 L | 4,86,000 ₹4.9 L |
| 1.08 | Sec: 2.0 PCC & RCC works
Providing material and labour for laying Autoclave Aerated Concrete Block chips/ bats cement concrete in 1:4:8 (1 Cement : 4 Coarse Sand : 8 graded Autoclave Aerated Concrete Block chips/ bats) for sunk filling grade including compacting, finishing, curing etc. complete as directed by engineer in charge. | 356 | Cum | 17,80,000 ₹17.8 L | 18,15,600 ₹18.2 L |
| 1.09 | Providing material and labour for laying Plain cement concrete M15 in Foundation and Plinth including cost of formwork, compacting, finishing, curing etc complete for all level, all height/ depth as directed by engineer in charge. | 1,200 | Cum | 78,00,000 ₹78 L | 78,00,000 ₹78 L |
Tender Value
₹37.6 Cr
EMD Value
₹47.6 L
Closing Date
13 Oct 2025, 2:00 pmClosed
The Exe., Engg., PWD, WD-I, Daman.
O/o the Ex. Eng., P.W.D., 2nd floor Multi office complex, near Veg. Market, Moti Daman.
Construction of Academic building with development of site MEP, ELV, FFTG, HVAC and Solar system for Nursing College near Government Hospital at Marwad, Daman District.(5th call)
2025_DAMAN_4473_1
Tender Notice No.91/2025-26
Open Tender
Civil Works
730 days
Daman District.
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
The Exe., Engg., PWD, WD-I, Daman.
₹47.6 L
The Exe., Engg., PWD, WD-I, Daman.
17 Nov 2025
22 Sept 2025
13 Oct 2025
22 Sept 2025
13 Oct 2025
22 Sept 2025
3 Oct 2025
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 19.23 MB
BOQ_4644.xls
BOQ • 17.50 MB
Download all tender documents and submit your bid