| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-Finance | L1 | Accepted-Finance Lower 1 | |
| 2 | Rejected-Technical | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | P M ASAN MOHAMED L1 | Contractor L2 |
|---|---|---|---|---|---|
| 1.00 | Geological suevey for new bore well point. | 1 | No | 2,500 ₹2,500 Lowest | 2,510 ₹2,510 |
| 2.00 | Drilling to borewells of size 4" to 5'' dia in sedimentary formation using hand boresets including insertation of casing pipes and removal of casing pipes etc., including supplying and packing of pebbles and conveyance of hand boresets including loading and unloading etc., complete | 90 | Mtr | 811 ₹72,990 Lowest | 815 ₹73,350 |
| 3.00 | Supplying and Delivery of 150mm dia PVC casing pipe as per IS1 2818/2010 including cost Materials and Transportation etc complete (CM) | 18 | Mtr | 594 ₹10,692 Lowest | 600 ₹10,800 |
| 4.00 | Supply and deliver of single phase compressure motor with ISI marking as per specification for the duty condition with suitable for installation in 110mm dia borewell etc complete (1.50HP× m duty condition) | 1 | No | 24,800 ₹24,800 Lowest | 25,100 ₹25,100 |
| 5.00 | Supply of 1.50Hp compressure motor's starter including cost conveyance to site etc complete. | 1 | No | 1,500 ₹1,500 Lowest | 1,600 ₹1,600 |
| 6.00 | Labour Charges for erection of Horizontal shaft, centrifigal pumpset (Coupled/Monoblock) in borewell/ Openwell including fixing of suction pipe and foot valve upto a maximum depth of 7 metres and delivery pipes to the required length with valves, pressure guages up to the exterior wall of pump room and erection of panel Board consisting of TPIC switches starter, Voltmeter, Ammeter, Capacitor single phasing preventor and laying and jointing the cables and twin earthing as per IE rules including providing bed blocks etc., Complete and operating the pumps and trail run for 10 days including signing of completeion of reports as required by EB Authorities (Up to 3 HP) | 1 | No | 9,429 ₹9,429 Lowest | 9,435 ₹9,435 |
| 7.00 | Supply of 1" HDPE Hose | 90 | Mtr | 64 ₹5,760 Lowest | 65 ₹5,850 |
| 8.00 | Supply of 1/2 " HDPE Hose | 90 | Mtr | 35 ₹3,150 Lowest | 36 ₹3,240 |
| 9.00 | Supply of 1/2" GI Pipe | 15 | Mtr | 69 ₹1,035 Lowest | 70 ₹1,050 |
| 10.00 | Supply of 1" CPVC Pipe | 12 | Mtr | 156 ₹1,872 Lowest | 160 ₹1,920 |
Tender Value
₹1.6 L
EMD Value
₹1,650
Closing Date
25 Feb 2026, 3:00 pmClosed
COMMISSIONER, KADAYANALLUR MUNICIPALITY
MUNICIPAL OFFICE, KADAYANALLUR
Providing Deep Borewell at Ayyapuram South street in ward no.17
2026_MAWS_655570_13
3041/2025/E1
Open Tender
Civil Works - Buildings
Works
90 days
KADAYANALLUR MUNICIPALITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,650
2 Mar 2026
12 Feb 2026
25 Feb 2026
12 Feb 2026
25 Feb 2026
12 Feb 2026
Geological suevey for new bore well point.
Drilling to borewells of size 4" to 5'' dia in sedimentary formation using hand boresets including insertation of casing pipes and removal of casing pipes etc., including supplying and packing of pebbles and conveyance of hand boresets including loading and unloading etc., complete
Supplying and Delivery of 150mm dia PVC casing pipe as per IS1 2818/2010 including cost Materials and Transportation etc complete (CM)
Supply and deliver of single phase compressure motor with ISI marking as per specification for the duty condition with suitable for installation in 110mm dia borewell etc complete (1.50HP× m duty condition)
Supply of 1.50Hp compressure motor's starter including cost conveyance to site etc complete.
Labour Charges for erection of Horizontal shaft, centrifigal pumpset (Coupled/Monoblock) in borewell/ Openwell including fixing of suction pipe and foot valve upto a maximum depth of 7 metres and delivery pipes to the required length with valves, pressure guages up to the exterior wall of pump room and erection of panel Board consisting of TPIC switches starter, Voltmeter, Ammeter, Capacitor single phasing preventor and laying and jointing the cables and twin earthing as per IE rules including providing bed blocks etc., Complete and operating the pumps and trail run for 10 days including signing of completeion of reports as required by EB Authorities (Up to 3 HP)
Supply of 1" HDPE Hose
Supply of 1/2 " HDPE Hose
Supply of 1/2" GI Pipe
Supply of 1" CPVC Pipe
Supply of 1"x1/2'' Bore Coupling
Supply of Bore Bottom Valve
Supply of 20mm PVC Tap
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_786139.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .