| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical Paper Incomplete |
Tender Value
₹74.8 L
EMD Value
₹74,800
Closing Date
14 May 2024, 1:00 pmClosed
SUPERINTENDING ENGINEER EDC Mirzapur
SUPERINTENDING ENGINEER EDC Mirzapur
Supply of De-centralized materials and Work for Capacity enhancement of 11/0.4 kV substation, Installation of 11/0.4 kV substation , Construction and bifurcation of 11 kV line and Replacement of Damaged Cable 33 KV for work in Mirzapur EDD-II MZP
2024_PVVNV_919109_1
99/EDC(M)/23-24
Open Tender
Electrical Works
Lump-sum
90 days
SUPERINTENDING ENGINEER EDC Mirzapur
Please refer tender
2 documents required · 2 mandatory
₹3,540
Executive Engineer(A)
₹74,800
SUPERINTENDING ENGINEER EDC Mirzapur
12 Jun 2024
18 Mar 2024
15 May 2024
18 Mar 2024
14 May 2024
18 Mar 2024
20 Mar 2024
Amount
Supply of following Decentralized materials at the works site as per RESSPO norms.
Stone pad 300x300x75 mm (Providing by Contractor)
X-arms holding clamps with bolts & nuts for ST/PCC poles. (Providing by Contractor)
F-bracket with bolts & nuts for ST/PCC poles (Providing by Contractor)
Al. binding wire (Providing by Contractor)
M.S clamp for Top, T-off channel with bolts & nuts for ST/PCC poles (Providing by Contractor)
P.G clamps for weasel conductor
Danger board with clamp & bolts for ST/PCC poles (Providing by Contractor)
Barbed wire GI (Providing by Contractor)
E-bracket with bolts & nuts (Providing by Contractor)
160 mm OD PN-4 PE-80 Grade UV stabilized HDPE Pipe as per IS: 4984 in 6 meter (Providing by Contractor)
G.I pipe 6" dia (Providing by Contractor)
Jointer for G.I pipe 6" dia (Providing by Contractor)
All lugs 70/120 mm2 (Providing by Contractor)
Extention Bracket (Providing by Contractor)
Aluminium Paint (Providing by Contractor)
Bolt, Nut And Washer (Providing by Contractor)
Red Oxide Paint (Providing by Contractor)
LT Clamp with Nut Bolt (Providing by Contractor)
LT Shackle Insulator (Providing by Contractor)
Z Clamp (Providing by Contractor)
Earth Wire Clamp (Providing by Contractor)
Nut Bolt for Shackle Insulator (Providing by Contractor)
Loop Guard Complete 3 Phese (Providing by Contractor)
Dead end clamp for pole/bracket with nuts & bolts (Providing by Contractor)
I Hook ( for dead end Clamp) (Providing by Contractor)
33 KV Cable Jointing Kit 3*300 (Providing by Contractor)
11 KV Cable Jointing Kit 3*300 /185/120/70 (Providing by Contractor)
Suspension clam with nuts & bolts (Providing by Contractor)
33 KV Straighst Through (Providing by Contractor)
3 ph Distribution Box(Providing by Contractor)
I Hook ( for suspension Clam) (Providing by Contractor)
Cartage of following materials from ESC, Mirzapur to work site including loading & unloading charge.
ST Poles 13 mtr long/11 mtr long (Provided by Department)
PCC Poles 8.5 mtr long (Provided by Department)
PCC Poles 11 mtr long (Provided by Department)
PCC Poles 9 mtr long (Provided by Department)
Line materials with ACSR Weasel Conductor (Provided by Department)
Line materials with Dog Conductor (Provided by Department)
Catrage of all Line Materials LT/11 /33 KV and LT PVC Cable
ABC 3x95+1x70+1x16mm2 (Provided by Department)
33 KV 3x300mm2 XLPE Cable (Provided by Department)
33 KV 3x120mm2 XLPE Cable (Provided by Department)
11 KV 3x300mm2 XLPE Cable (Provided by Department)
11 KV 3x185mm2 XLPE Cable (Provided by Department)
11 KV VCB O/G, 200/100/5A (Provided by Department)
Transformer 100 KVA, (Provided by Department)
Transformer 63 KVA, (Provided by Department)
Transformer 25 KVA, (Provided by Department)
Erection
Erection of single support ST/PCC pole for construction of 11 KV/LT line including digging of pit, fitting of all accessories, back filling of earth & others required work.
Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Grouting of stay sets including digging of pit with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms, fixing binding and nuzzling of stay wire. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Earthing of Poles
Stringing & sagging of 3 phase 33/11 KV line upto proper sag including laying of ACSR Weasel /Dog Conductor , binding with insulators & jumpering.
Erection of AB Cable Size 3x95+1x70+1x16mm2 as per RESSPO norms.
Erection of Sectional Double Pole Structure of PCC/ST pole including digging of pit, fitting of all accessories, back filling of earth, grouting of each pole & stay sets as per RESSPO norms (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Erection of Double Pole Structure for DP STpolePCC Pole 8.5 Mtr including fitting of accessories,
Mounting of 100 KVA Transformer as per RESSPO norms.
Mounting of 63 KVA Transformer as per RESSPO norms.
Mounting of 25 KVA Transformer as per RESSPO norms.
Laying of O/H 33 KV 3x300mm2 XLPE Cable as per RESSPO norms.
Laying of O/H 33 KV 3x120mm2 XLPE Cable as per RESSPO norms.
Laying of O/H 11 KV 3x300mm2 XLPE Cable as per RESSPO norms.
Laying of O/H 11 KV 3x185mm2 XLPE Cable as per RESSPO norms.
Filling of I/D/O/D 33 KV cable jointing kit All size as per RESSPO norms.
Filling of I/D/O/D 11 KV cable jointing kit All size as per RESSPO norms.
Installation of 11 KV VCB pannel (O/G), 200/100/5A as per RESSPO norms.
Drilling under the Railway Track by HDD machine for crossing the 11 KV XLPE cable
Laying of 160 mm OD PN-4 PE-80 Grade UV Stabilized HDPE Pipe as per IS:4984 in 6 meter with jointer
Laying charge of 33 KV All Size cable from D/P to D/P
Laying charge of 11 KV All Size cable from D/P to D/P
Cartage of received back 10 KVA Transformer from work site to ESC, Mirzapur including loading & unloading charge
Cartage of received back 25 KVA Transformer from work site to ESC, Mirzapur including loading & unloading charge
Cartage of received back 63 KVA Transformer from work site to ESC, Mirzapur including loading & unloading charge
M/S D.K. CONSTRUCTION
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .