Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹7,900
Closing Date
26 Aug 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Mechanical Irrigation Div Ang HQ Awantipora
Brazing process for extension of connection leads of 100 HP motor fitted at LIS Semthan Draught and providing fitting of lighting arrestor pin insulator and conductor cable at LIS Pazalpora
2021_IFC_134975_18
20/MIDA of 2021-22
Open Tender
Electrical and Maintenance Works
Item Rate
7 days
Pazalpora
Brazing process for extension of connection leads of 100 HP motor fitted at LIS Semthan Draught and providing fitting of lighting arrestor pin insulator and conductor cable at LIS Pazalpora
2 documents required · 2 mandatory
₹50
Yes
Ex Engineer MID Ang HQ Awantipora
Yes
27 Aug 2021
17 Aug 2021
27 Aug 2021
17 Aug 2021
26 Aug 2021
17 Aug 2021
180 days
Amount
A) Complete thimbling aluminium cable extension of leads to 100 HP motor by way of brazing process at LIS Semthan Draught by way of the following process:- 1- Extending the wire coming out from motor which is damaged by way of brazing using oxygen and acetylene gas as the wire of motor is squeezed due to heating of thimbles. The damage is caused because of continuous running of equipment. 2- Repairs to the damaged end points, putting copper thimbles of required size on both side. The thimbles need to be attached to wire by using crimpling tool ensuring the termination should not be kept loosed. After repairs pumping unit need to be testing on full load at site. The entire is to be carried out with skilled labours and coolie using special tools and lackless required for the job. B) The job also includes by using professional skilled labours, tools and tackles for replacement of damaged 04 no. 11KVA pin insulators, 03 no. lightening arrestors, 03 no 200mm aluminium thimbles for connecting with bush rod and 10 mtrs aluminium conductor at LIS Pazalpora, repairs to the damaged conductor wire to be carried out which was damaged due to strong winds blown and fall off popular tress on wire and poll leading to station. The MS washers and nut bolt of required size are in the scope of firm. NOTE:- The scrap will be the property of the firm which will conduct the work 1100,750,600,200
M/S G N ELECTRICAL AND MECHANICAL WORKS
M/S NEW STAR ELECTROMECH
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .