| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC SF 216 1 DHANDAPANI 3 225 PULIAMTHOTTAM K KRISHNAPURAM KAMANAYAKAMPALAYAM 1831 PALLADAM | DINDIGUL | TAMIL NADU | 624001 | ₹1.3 Cr | L1 | Accepted-AOC Lowest Amount Quoted |
| 2 | L2₹1.4 Cr+₹3.5 L (2.65%)Rejected-Finance MAYILADUTHURAI | TAMIL NADU | 609313 | ₹1.4 Cr+₹3.5 L (2.65%) | L2 | Rejected-Finance Highest Amount Quoted |
| 3 | L3₹1.4 Cr+₹4.6 L (3.51%)Rejected-Finance 20 RAJA STREET PALAYAMKOTTAI TIRUNELVELI 627002 | TIRUNELVELI | TAMIL NADU | 627002 | ₹1.4 Cr+₹4.6 L (3.51%) | L3 | Rejected-Finance Highest Amount Quoted |
Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
10 Jan 2025, 3:00 pmClosed
District Collector office,mayiladuthurai
District Collector office,mayiladuthurai
Strenthening Of Road From Thalainayar -Keelacolony Road (R-162) Thalainayar Panchayat in Mayiladuthurai Block Km 0/0 - 2/620 At Mayiladuthuai district under NABARD XXX 2024-25
2025_RDTN_516268_1
DIPR/5603/TENDER/2024 dt 26.12.2024
Open Tender
Civil Works - Roads
Item Rate
180 days
Thalainayar
Please refer Tender documents.
12 documents required · 12 mandatory
₹0
₹1.4 L
District Collector office,mayiladuthurai
11 Mar 2025
3 Jan 2025
10 Jan 2025
3 Jan 2025
10 Jan 2025
3 Jan 2025
3 Jan 2025
Amount
Strenthening Of Road From Thalainayar Keelacolony Road (R-162) at Thalainayar Panchayat in Mayiladuthurai Block Km 0/0 - 2/620 in Mayiladuthurai District Under NABARD XXX 2023-24
Clearing and scrub/ light jungle by cutting, removing and disposing of all materials such as bushes, scrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees up to 300mm girth
Picking the existing black top/ WBM surface to 50 MM depth including labour, hire charges d plants and all other incidental charges etc. complete as per MOST specification.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out
Providing US Gravel with a lead of KM including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification etc
Side Berms
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM/WBM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WBM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BC 25mm Thick (Grade-II) Using VG30 Bitumen and Plastic WasteProviding and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Road marking with hot applied thermoplastic compound with reflecting glss beads on bituminous surface
Provision for ,Hm stone,
Provision for ,Km stone,
Const of RCC Pipe Culvert @ ch 1505 m
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete.
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete.
Supplying and fixing of 0.9 m NP3 Pipe
Const of RCC Pipe Culvert @ ch 2160
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete.
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete.
Supplying and fixing of 0.9 m NP3 Pipe
Const of RCC Pipe Culvert @ ch2210
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete.
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete.
Supplying and fixing of 0.9 m NP3 Pipe
Const of RCC Pipe Culvert @ ch 2282
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete.
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete.
Supplying and fixing of 0.9 m NP3 Pipe
Const of RCC Pipe Culvert @ ch2552
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete.
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete.
Supplying and fixing of 0.9 m NP3 Pipe
Const of RCC Pipe Culvert @ ch2584
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete.
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete.
Supplying and fixing of 0.9 m NP3 Pipe
Provision for Name board
90 cm Equilateral triangle (Cautionary) sign Bord
Towards the charges for routline maintenance of the road work executed under NABARD including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost For the First Year from the date of completion of work
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
NAM INFRA (BID ID -1231133)
M Lakshmi (BID ID -1231173)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .