Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical B 290 BARRA 7 KANPUR NAGAR UTTAR PRADESH 208027 | KANPUR NAGAR | KANPUR NAGAR | UTTAR PRADESH | 208027 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical WZ 49 20 B VIKASPURI VIKASPURI NEW DELHI WEST DELHI DELHI 110018 UDYAM DL 08 0028655 07AASCA1900E1ZZ R M MII STATUS AS VERIFIED | WEST DELHI | DELHI | 110018 | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical D 411 BLOCK D STREET NO 4 SWAROOP NAGAR D 411 STREET NO 4 SWAROOP NAGAR SWAROOP NAGAR NORTH WEST DELHI DELHI 110042 | NORTH DELHI | DELHI | 110042 | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical CB 67 RING ROAD NARAINA NEW DELHI DELHI 110028 | NEW DELHI | DELHI | 110028 | Admitted-Fee/PreQual/Technical |
Tender Value
₹35.2 L
EMD Value
₹44,000
Closing Date
10 Sept 2026, 5:00 pmClosed
Area Manager Environment
Office of the General Manager Pandaveswar Area
Installation and Commissioning of Modular Type Sewage treatment plant STP of 25 KLD capacity for the colony of Pandaveswar Colliery under Pandaveswar Area including operation and maintenance for one year
2026_ECL_364502_1
GM-PA/AM(ENV)/e Tender/26-27/03/03 date 28.08.2026
Open Tender
Water Supply/ Sanitation Works
Percentage
90 days
Pandaveswar Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹44,000
11 Sept 2026
29 Aug 2026
11 Sept 2026
31 Aug 2026
10 Sept 2026
31 Aug 2026
31 Aug 2026 - 3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 M2 on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 57.02 | M3 | 188.75 | ₹10,762.53 |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 4.87 | M3 | 1,061.6 | ₹5,169.99 |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 20.71 | M2 | 269.3 | ₹5,577.2 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 3.08 | M3 | 5,434.55 | ₹16,738.41 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. | 76.42 | M2 | 269.3 | ₹20,579.91 |
| 6 | Columns, Pillars, Piers, Abutments, Posts and Struts | 12.4 | M2 | 644.7 | ₹7,994.28 |
| 7 | Small lintels not exceeding 1.5 m clear span, moulding as in cornices, window sills, string courses, bands, copings, bed plates, anchor blocks and the like | 14.78 | M2 | 269.3 | ₹3,980.25 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 13.6 | M3 | 6,903.9 | ₹93,893.04 |
| 9 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fllets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: | 0.8 | M3 | 8,030.65 | ₹6,424.52 |
| 10 | Reinforced cement concrete work in beams, suspended foors, roofs having slope up to 15* landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to foor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 1.71 | M3 | 8,420.4 | ₹14,398.88 |
stage.html
html • 0.03 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.76 MB
BOQ_377417.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .