Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-Finance 1 1 7 S C ROY PATH ATHPUR DIST NORTH 24 PGS P S JAGADDAL PIN 743128 | BARRACKPORE | 24 PARGANAS NORTH | WEST BENGAL | 743128 | ₹4.9 L | L1 | Accepted-Finance L1 bidder |
| 2 | L2₹6 LRejected-Finance | ₹6 L | L2 | Rejected-Finance Not L1 bidder |
| 3 | L3₹6.3 LRejected-Finance | ₹6.3 L | L3 | Rejected-Finance Not L1 bidder |
| 4 | L4₹7.0 LRejected-Finance PO PAHALANPUR PS MADHABDIHI DIST BURDWAN PIN 713427 | HOOGHLY | WEST BENGAL | 713427 | ₹7.0 L | L4 | Rejected-Finance Not L1 bidder |
| 5 | L5₹7.0 LRejected-Finance 8D 1 RAJANI BHATTACHARJEE LANE KOLKATA 700026 | KOLKATA | WEST BENGAL | 700026 | ₹7.0 L | L5 | Rejected-Finance Not L1 bidder |
| Sl No | Description | Qty | Unit | SREE MAA ENTERPRISES L1 | TARA MEMORIAL CONSTRUCTION L1 | CHANDAN ENTERPRISE L1 | ANURADHA L1 | N K BUILDERS L2 | EASTERN SECURITY SERVICE L1 | ANUKUL CONSTRUCTION L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Day to day operation of pump motor set for 3(three) shifts every day (One (01) person per Shift) including all sorts of minor/normal maintenance of pump, motor, switch panel of pump as per direction of Engineer-in-charge.
Total Labours for Three (03) Shifts and One Person (01) per Year=
3 x 1 x 365 =1095 nos.
Hence, total Head ( Semi-skill manpower )=1095 pump operator for period of one year
Rate of Minimum Wages in the employment of pump operator (semi skilled ) as per Circular no.24/Stat/14/RW/24/2023/LCS/JLC dated 17/06/2025 of the Additional Labour Commissioner W.B.] Rate of minimum wages, bonus, EPF, ESI & GST as per existing rule. | 1,095 | Head | 5,96,139.9 ₹7.0 L | 5,96,139.9 ₹7.0 L | 5,96,139.9 ₹7.0 L | 5,96,139.9 ₹7.0 L | 6,10,363.95 ₹7.2 L | 5,96,139.9 ₹7.0 L | 5,96,139.9 ₹7.0 L |
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
1 Sept 2025, 4:00 pmClosed
EE/KED/PWD
Office of the Executive Engineer, PWD. Kolkata East Division. 11A, Mirza Galib Street. Kolkata 700 087
Day to day operation of water supply pump within the premises of entire M.L.A Hostel Campus, Kyd Street, Kolkata. in 3 (three) shift of pump motor set (12nos) like Submersible, Monoblock and different pump. (Period for one year).
2025_WBPWD_893115_1
WBPWD/EE/KED/NIT-19/2025-26
Open Tender
CIVIL WORKS
365 days
KOLKATA EAST DIVISION, PWD
Please refer Tender documents.
4 documents required · 4 mandatory
₹15,000
Yes
27 Mar 2026
21 Aug 2025
3 Sept 2025
25 Aug 2025
1 Sept 2025
25 Aug 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid